LOWER MAIN STREET RECONSTRUCTION N B R I D G T O N , M A I N E A U G U S T 2 8 , 2 0 1 8 PROJECT INFORMATION Milone & MacBroom has been tasked with the reconstruction and streetscaping design of Lower Main Street in Bridgton, Maine. The
B R I D G T O N , M A I N E A U G U S T 2 8 , 2 0 1 8
N
Milone & MacBroom has been tasked with the reconstruction and streetscaping design of Lower Main Street in Bridgton, Maine. The reconstruction will result in improved roadway geometry and improved pedestrian facilities. Key Facts:
Street), Improved Sidewalk layout, removal of invasive knotweed along southern side of roadway
Looking East from intersection with Mechanic St.
Looking West from intersection with Cross St
SIDEWALK GRANITE CURBING GRASS PAVER/STAMPED CONCRETE TREE BOX STREET TREE
TREE BOX DETAIL
GRANITE CURBING 2” FLEXI PAVE SIDEWALK 6” CRUSHED STONE ROADWAY TREE
ARROWWOOD VIBURNUM ILEX VERTICILATTA – “WINTER BERRY” RED TWIG DOGWOOD HORNBEAM COLUMNAR MAPLE AMELANCHIER – “AUTUMN BRILLANCE”
CONTACT WORK: $1,174,000 10% CONTINGENCY: $117,400 TOTAL: $1,291,400