Low-Cost Recuperative Heat Exchanger For ScCO2 Power Systems Pr Proje ject Kic Kick-of off Meet Meeting ng Co Contract No No. DE DE-SC000 00010 1095 95 By By Dr. J . John ohn T. K . Kel elly Altex ex Tec Technol hnologies


slide-1
SLIDE 1

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Pr Proje ject Kic Kick-of

  • ff Meet

Meeting ng

Co Contract No

  • No. DE

DE-SC000 00010 1095 95

By By

  • Dr. J

. John

  • hn T. K

. Kel elly

Altex ex Tec Technol hnologies es C Cor

  • rpor

poration

244 244 Sobr

  • bran

ante Way ay Sunny unnyvale, C CA 94086 94086

For

  • U. S

. S. . Depar epartm tment of E

  • f Ener

nergy National

  • nal E

Energy gy T Technol nology

  • gy Labor
  • rat

ator

  • ry

Seth A eth A. . Law Lawson

  • n, P

Ph.D h.D

Dec ecem ember er 3, 3, 2014 2014

Low-Cost Recuperative Heat Exchanger For ScCO2 Power Systems

1

slide-2
SLIDE 2

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Thi his s mat ateri erial is s prot protected under t under the D he DOE Progra rogram grant grant regul regulations.

Low-Cost Recuperative Heat Exchanger for ScCO2 Power Systems

2

slide-3
SLIDE 3

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

  • Stai

ainless steel eel pl plat ates and and ins nserts

  • Nicke

ckel-bas based ed braz aze e alloy

  • Tes

ested to

  • 3,

3,50 500 ps psi at at low

  • w tem

empe perature

  • Cor
  • re int

nteg egrity pr proven

  • Man

anifold upda update def define ned

3

Manufactured and tested 30 kWt preliminary unit with early design inserts

High gh Effectiv ivene eness Low Cost (HELC) LC) Heat at E Exchang hanger er

slide-4
SLIDE 4

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

HELC LC Advant antage age for ScCO2 2 Cycle le Applic licat atio ions ns

4

HELC Advantages for ScCO2 Cycle Applications High pressure capability Bonded core assembly tested up to 5,000 psi High temperature capability Stainless steel core ; test coupons fabricated with Inconel 625 for higher temperature and corrosion resistance, Nickel coating enhances base stainless steel corrosion resistance Thermal stress capability Flexible insert structure to mitigate thermal shock transients Enhanced heat transfer Insert structures that enhance heat transfer with limited pressure drop impact Significantly lower cost Single core and manifold bonding step; LAB bonding process, where surface finish, furnace loading, process time are substantially reduced versus diffusion bonding; lower part count for same heat transfer; less material Configurational and capacity flexibility Modules of various widths and heights

slide-5
SLIDE 5

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

HELC LC Applic licat atio ions ns of Interest

  • Fos
  • ssil fuel

uel

  • Nuclear

ear

  • Conc

ncent ntrat ating ng solar ar

  • Geot

eothermal

  • Waste heat

heat

5

Internal heat exchangers for ScCO2 power cycles

slide-6
SLIDE 6

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Applic plication ion of Interes est

6

D-R and Echogen 7.5 Mwe Waste Heat ScCO2 Power System

Waste heat from simple cycle GTs (e.g. LM2500)

slide-7
SLIDE 7

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Projec

  • ject O

Objec ectiv ives es

  • Dev

evelop, des design and and bui build a a 500 500 kWt High gh Effec ectivenss and and Low Low Cos

  • st (HELC) RHEX capa

apable of

  • f ope
  • perating at

at 3500 3500 ps psi and and 1100 1100 F

  • Show

how anal analytically that hat it pr provides nee needed ther hermal and and structural per performance tar arge geted for

  • r the

he Echo hogen and and Dresser-Rand and waste e heat at ScCO2 2 power er system em applicat ation

  • n
  • Bond
  • nd the

he uni unit us using pr proven ISO900 9001:2008 and and AS910 9100:2009 Rev ev C, ASM ASME E Se Sect VI VIII, Div 1 certified manufacturer, Va Vacuum Pr Process Enginee neering ng (VPE)

  • Tes

est uni unit int nteg egrity, heat heat tran ansfer and and pr pressure dr drop per performance in n Echogen’s 250 250 kWe (500 500 kw ther hermal) was aste heat heat pow power system dem demonstrator to

  • pr

prove per performance and and int nteg egrity at at oper

  • perating

cond nditions

  • ns of interes

est

7

slide-8
SLIDE 8

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Projec

  • ject T

Team

  • Alt

Altex – Proj

  • jec

ect l lead ead

  • Echoge

hogen n – Per erformance t e tes est l lead ead

  • Babc

abcoc

  • ck and

and Wilcox

  • x – Pow
  • wer

er s system heat heat ex exchang hanger gui guidanc dance

  • Dres

esser R Rand and – Com

  • mmer

ercial al appl application

  • n gui

guidanc dance

  • Vac

acuu uum Proc

  • ces

ess E Engi ngineer neering g – Manuf anufac acturing and g and bondi bonding s ng suppor upport

8

slide-9
SLIDE 9

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

HELC LC Projec ject Schedul edule

9

slide-10
SLIDE 10

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 1 – Project Management and Planning

  • Manag

nage an and dir irect pr project in in ac accor

  • rdanc

dance wit ith the he Pro roject Manag anagem ement ent Pla Plan (PM PMP) P) and nd pr prepar epare ne neede eded doc docum ument nts and and br brief efing ngs

10

slide-11
SLIDE 11

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 1 – Project Management and Planning

  • Exec

ecut utive e summar ary

  • Risk manag

agem ement nt

  • Proj
  • jec

ect timeline ne and miles eston

  • nes

es

  • Fun

unding and and cos

  • st pr

prof

  • files
  • Organi

ganizat ational

  • nal struc

uctur ure e and managem nagement ent

  • Suc

uccess criteria and and dec decision poi point nts

  • SO

SOPO PO

11

Project Management Plan

slide-12
SLIDE 12

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 1 – Project Management and Planning

12

Risk management issues and mitigation

Type of Risk Impact Probability Strategies Does not meet performance specifications High Low Use established models, supported by data, to predict heat transfer and pressure drop performance Does not meet integrity specification High Low Use FEA models, supported by data, to predict stresses under conditions of interest and use large safety factor Test systems do not

  • perate as planned

High Low Use proven and well supported available Echogen laboratory and demonstrator test systems Team management High Low Define interfaces, responsibilities and use experienced staff that has multi-group project experience Cost share problems Moderate Low Limit cost share relative to financial strength of team

slide-13
SLIDE 13

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 1 – Project Management and Planning

13

Organization Structure

slide-14
SLIDE 14

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 1 – Project Management and Planning

14

HELC success criteria

Budget Period Criteria Milestone Success Criteria 1 Coupon bonds 4/30/15 Bonds have pull tests at base material yield strength 1 30kWt integrity 4/30/15 Passes helium leak check to nuclear standards and 5,000 psi hydrostatic test 1 30kWt performance 4/30/15 Under 10 psi pressure drop and meets 30kWt heat transfer 2 500kWt integrity 11/15/15 Passes helium leak check to nuclear standards and 5,000 psi hydrostatic test 2 500kWt performance 2/21/16 Under 10 psi pressure drop and meets 500kWt heat transfer at test system

  • perating conditions

2 Cost reduction versus conventional 5/31/16 Sixty percent cost reduction

slide-15
SLIDE 15

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 1 – Project Management and Planning

15

Task 1 Milestone Log

Milestone Number Task Number Milestone Planned Start Date Planned Completion Date Actual Completion Date Verification Measure 1 1 Kickoff Meeting 12/3/2014 12/3/2014 12/3/2014 Held Meeting 2 1 Project Plan Production 10/1/2014 11/1/2014 11/1/2014 Produced Plan 6 1 Annual Presentation to DOE 10/31/2015 10/31/2015 Meeting Held 12 1 Final Presentation to DOE 5/1/2016 5/31/2016 Meeting Held 13 1 Submit Final Report to DOE 5/1/2016 5/31/2016 Doc Produced

slide-16
SLIDE 16

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 2 – Define Applications, Goals and Specifications

  • Def

efine goal goals and and speci specifications f for t

  • r the

he appl application

  • n of
  • f int

nter erest

16

slide-17
SLIDE 17

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Tas ask 2 k 2 – Def efine ne Appl pplicat ation

  • ns,

s, G Goal

  • als

and and Spec pecificat ation

  • ns

Requi equired 30K d 30KWt H HELC LC spec pecifications ns UA=1.5 kW/°C

slide-18
SLIDE 18

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Tas ask k 2 2 – Def efine ne Appl pplicat ation

  • ns,

s, G Goal

  • als

and and Spec pecificat ation

  • ns

Requi equired 500K d 500KWt H HELC LC spec pecification

  • ns

UA=35 kW/°C

slide-19
SLIDE 19

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 2 – Define Applications Goals and Specifications

19

Milestone Number Task Number Milestone Planned Start Date Planned Completion Date Actual Completion Date Verification Measure 3 2 DOE Review and Comment of App, Goals and Specs 10/1/2014 11/1/2014 Approval

Task 2 Milestone Log

slide-20
SLIDE 20

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 3 – Refine Design and Assess Performance and Manufacturability

  • Desi

esign a a prot prototype e HELC LC for pow

  • r power

er syst stem em demonst strat rator t

  • r testing a

ng at Echoge chogen t that hat w will si simul ulate a a ful ull-scal scale e heat heat excha exchanger r operat

  • peration

20

slide-21
SLIDE 21

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 3 – Refine Design and Assess Performance and Manufacturability

  • Prepa

epare firs rst-cu cut des design gn to me meet pe perfor

  • rmanc

ance requ quirem ement ents

  • Rev

eview ew de design gn with VPE, PE, Echo hogen, gen, B&W &W and and D-R to asse ssess in integrity and and manuf ufac actur urabi ability

  • Pe

Perform faul ault tree fai ailur ure mode

  • de effects anal

analysis to cor

  • rrec

ect weak ak poi point nts in in des design and and ev eval aluate risks sks

  • Def

efine ne co cost sts with the suppo upport of

  • f VP

VPE and and mat ater erial al supp pplier ers

  • Incor
  • rpor

porate DOE and and pr projec ect par partner ner com

  • mment

ents in final nal des design

  • Updat

date des design and and review with DOE

21

slide-22
SLIDE 22

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 3 – Refine Design and Assess Performance and Manufacturability

  • J and

and f factor model

  • del capt

aptur ures es hea eat tran ansfer er, pressu ssure drop

  • p and

and ener ergy gy bal balan ance

  • Model
  • del updat

updated ed to capt apture variable specific heat heat with Sc ScCO2

  • Model
  • del inc

ncorpor

  • rat

ates es correl elations

  • ns of
  • f Li

Liao ao and and Zhao hao to accou

  • unt

nt for variable den density with Sc ScCO2

22

Process model

slide-23
SLIDE 23

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 3 – Refine Design and Assess Performance and Manufacturability

Mechanical design will use SolidWorks

23

plate frame Inserts assembly process

slide-24
SLIDE 24

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 3 – Refine Design and Assess Performance and Manufacturability

Finite element analysis of stress

24

slide-25
SLIDE 25

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 3 – Refine Design and Assess Performance and Manufacturability

  • Bas

ase m e mat ater erials and and br braz aze e com

  • mpou

pound

  • Ins

nsert manuf anufac actur ure and and tol

  • ler

eranc ncing

  • Plat

ate t e tol

  • ler

eranc ncing

  • Plat

ate and e and fram ame cut utting m g met ethod hod

  • Plat

ate br e braz aze e pl plat ating

  • Par

art cleani eaning ng

  • Li

Limitations ns on

  • n stac

ack hei height ght

  • Fur

urnac ace fixtur uring and g and loadi

  • ading

ng

  • Fur

urnac ace cycle time e and and uni units per per fur urnac nace run un

  • Connec
  • nnections
  • ASME code
  • de com
  • mpl

pliance

25

Assess low-cost manufacturabilty of the design

slide-26
SLIDE 26

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 3 – Refine Design and Assess Performance and Manufacturability

Task 3 Milestone Log

26

Milestone Number Task Number Milestone Planned Start Date Planned Completion Date Actual Completion Date Verification Measure 4 3 DOE Review and Comment 500kWt Test Article Design 12/1/2014 12/31/2014 Approval

slide-27
SLIDE 27

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Build Test Articles and Prepare Test Plan

  • Bui

uild d and and test est sm smal all art articles and and bui build d and and check check the he int nteg egrity of

  • f the

he 500 500 kW kWt tes est art article e and and prepar prepare t e test est pl plans ans

27

slide-28
SLIDE 28

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Build Test Articles and Prepare Test Plan

  • Def

efine, des design and and bui build small ar articles (coupons and and 30 30 kWt) to

  • supp

upport 500 500 kWt bui build

  • Test coupons at VPE

VPE and Al Altex

  • Tes

est 30 30 kWt ar article at at Echo hogen labo aboratory-scale test facility

  • Ref

efine 500 500 kWt des design and and rev eview

  • Prepare tes

est pl plan an and and rev eview with h DOE

  • Manuf

nufac actur ure e 500 kWt test article e for demons

  • nstrat

ator

  • r
  • Tes

est int nteg egrity ahea ahead of

  • f per

performance tes esting at at Echo hogen

28

slide-29
SLIDE 29

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Bui uild Tes est Art rticles and and Prepar epare e Test Pl Plan

  • Stai

ainless steel eel and and ni nickel- based d braz aze e alloy

  • ys
  • Clea

eaning and and qual quality chec heck at at VPE VPE

  • Bondi

ding ng using ng VPE proc

  • ces

ess and d furnac naces

  • Integrity tests at VPE

VPE and Al Altex

29

Bonding Furnace

slide-30
SLIDE 30

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Bui uild Tes est Art rticles and and Prepar epare e Test Pl Plan

  • VPEI

VPEI vacuum furnace

  • Appl

pplied for

  • rces to
  • 500

500 tons

  • ns
  • High

gh vac acuum to

  • 1E

1E-7 7 Torr rr

  • Six heat

heat zon

  • nes for
  • r bes

best uniformity

  • All met

etal al clea ean hot hot zon

  • ne
  • Multipl

ple e work thermoc

  • cou
  • upl

ples es

  • Pape

aperless dat data a rec ecording

30

Bonding Furnace

slide-31
SLIDE 31

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Bui uild Tes est Art rticles and and Prepar epare e Test Pl Plan

The integrity of the HELC bonding process to be verified per ASME standards for:

  • Tensile strength
  • Yield strength
  • Elongation
  • Impact
  • Metallographic evaluation
  • Burst pressure

31

slide-32
SLIDE 32

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Build Test Articles and Prepare Test Plan

  • Bui

uild and and tes est six-layer coupons

  • upons t

to

  • pr

prov

  • ve

e mat aterials, mat ater erial als pr prepar eparation

  • n and

and br braz aze bondi bonding ng

  • Tes

est f for

  • r pr

pres essure and and tem empe peratur ure cycling and and per perform non non-des destruc uctive and and des destruc uctive tes esting on

  • n bonds

bonds

  • Bui

uild and and tes est 30 30 kWt uni unit to

  • pr

prov

  • ve

e bui build d pr proc

  • cess and

and per perfor

  • rmanc

nce ahead ahead of

  • f

bui buildi ding t g the he 500 500 kWt dem demons

  • nstrator

32

Build and test integrity of coupons and test 30 kWt for integrity and performance

slide-33
SLIDE 33

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Build Test Articles and Prepare Test Plan

  • Requi

quired d instrumen entat ation

  • n for heat

exchan hanger ger perfor

  • rman

ance validat dation:

  • n:
  • inl

nlet et and and out

  • utlet

et tem emperature

  • inl

nlet et and and out

  • utlet

et pr pressure

  • mas

ass flow

  • w rat

ate

  • Temper

perat atur ure: e: Pt-100R 0RTD (Ros

  • sem

emoun

  • unt 068), +/- 0.

0.2C 2C

  • Pressure: Stai

ain n gage gage

  • (Ros
  • sem

emoun

  • unt 3051)

1), +/-0.04MPa Pa

  • Flow
  • w rat

ate: Cor

  • riolis flow
  • w met

eter Mi Micromotion F05), +/-0. 0.2% 2%

33

Echogen laboratory-scale test system

slide-34
SLIDE 34

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 4 – Build Test Articles and Prepare Test Plan

  • Standar

ndard d oper erat ating ng proc

  • cedur

dures es

  • Inter

erfac ace e requi quirem ement ents

34

Echogen laboratory and demonstrator test plans

Test Purpose Conditions Location Helium leak check, hydrostatic pressure test Ensures article is leak free and withstands high pressure Helium/Vacuum: 10^-7 Pa·m3·s−1 Hydrostatic: 5,000 psi VPE and Altex Heat transfer and pressure drop tests

  • Design point
  • Characterization
  • Operating conditions

Shows that test article can achieve projected heat transfer and pressure drop results that validate model 200C 200 bar 0.4 or 6.6 kg/sec Echogen

slide-35
SLIDE 35

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Tas ask 4 k 4- Bui uild T d Tes est A Articl cles s and and Prepar epare e Te Test Pla t Plan

Labor Laboratory-scale E e Echogen s hogen system t tes est c condi

  • nditions

Min Max Min Max P (MPa) 12.5 20 5.5 9 T (°C) 20 40 100 200 W (kg/s) 0.2 0.4 0.2 0.4 Cold (State 2) Hot (State 5)

Recuperator Condenser / cooler Electric heaters

Turbine Compr/ pump

1 2 3 4 Throttle valve 42 5 6 Bypass valve

Note:

  • Turbine will not be used for recuperator test
  • Heaters and bypass/throttle valves will

control RC inlet temperature & pressure

slide-36
SLIDE 36

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task sk 4 – Bui uild Tes est Art rticles and and Prep repare Test st Pl Plan

Task 4 miles estone

  • ne log

36

Milestone Number Task Number Milestone Planned Start Date Planned Completion Date Actual Completion Date Verification Measure 5 4 DOE Review and Comment 500kWt Test Plan 7/15/2015 7/31/2015 Approval

slide-37
SLIDE 37

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 5 – Prepare Power System for Testing

  • Prepar

repare Echogen chogen pow power er sys system dem demon

  • nstrator sys

system em f for t

  • r test

esting

37

slide-38
SLIDE 38

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Tas ask 5 k 5- Prepar epare P e Pow

  • wer

er Syst ystem for

  • r Te

Testin ting

Dem emons

  • nstration
  • n s

scal ale e Echogen hogen tes est s system and and instrum ument ntat ation

  • n s

specificat ations ns

Required instrumentation for heat exchanger performance validation:

  • Inlet & outlet temperature
  • Inlet & outlet pressure
  • Mass flow rate
  • Temperature: Pt-100 RTD

(Rosemount 068), ±0.2°C

  • Pressure: Strain gage

(Rosemount 3051), ±0.04MPa

  • Flow rate: Coriolis flow meter

(Micromotion F200), ±0.2%

slide-39
SLIDE 39

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 6 – Test Unit in Power System

Test est the he 500 500 KWt HELC LC in n the he dem demon

  • nstrator uni

unit at at Echogen chogen and and conf confirm post post test est int nteg egrity

39

slide-40
SLIDE 40

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 6 – Test Unit in Power System

  • Tes

est oper

  • perat

ation of

  • f 500

500 KWt uni unit in n the he upgr upgrade aded pow power er system dem demons

  • nstrator

at at des design gn poi point nt condi

  • nditions

ns

  • Run

un char harac acter erization

  • n tes

ests ov

  • ver

er par param ameter er ranges anges of

  • f int

nter erest

  • Run

un at at oper

  • perat

ating condi

  • ndition
  • ns of
  • f int

nter erest, bas based ed on

  • n Echoge

hogen system

  • Altex and

and VPE ins nspe pect uni unit for

  • r signs

gns of

  • f degr

degrada adation

  • Prepa

epare tes est repor eport for

  • r rev

eview ew by by the he team eam

  • Subm

ubmit repor eport to D

  • DOE f

for

  • r r

rev eview ew and c and com

  • mmen

ent

40

slide-41
SLIDE 41

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

De Demo-scale E e Echogen s hogen system t tes est c condi

  • nditions

ns

Tas ask 6 k 6 – Tes est U Uni nit i in n Pow

  • wer

er S Syst stem em

Min Max Min Max P (MPa) 12.5 20 5.5 9 T (°C) 20 40 100 200 W (kg/s) 3 7 3 7 Cold (State 2) Hot (State 5)

Note:

  • Turbine will not be used for recuperator test
  • Heaters and bypass/throttle valves will

control RC inlet temperature & pressure

Recuperator Condenser / cooler Steam-CO2 heat exch

Turbine Compr/ pump

1 2 3 4 Throttle valve 42 5 6 Bypass valve

slide-42
SLIDE 42

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 6 – Test Unit in Power System

42

Task 6 milestone log

Milestone Number Task Number Milestone Planned Start Date Planned Completion Date Actual Completion Date Verification Measure 7 6 Complete 500kWt Characterization and Operating Condition Variation Tests and Inspect Unit 12/1/2015 2/15/2016 Data

slide-43
SLIDE 43

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 7 – Evaluate Performance and Economics Define performance and costs for HELC as integrated into the application of interest

43

slide-44
SLIDE 44

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 7 – Evaluate Performance and Economics

  • Using

ng tes est dat data, a, def define per ne perfor

  • rmanc

nce for

  • r HELC

LC as as int ntegr egrated i d int nto

  • was

aste heat heat pow power er system appl application of n of int nter erest

  • Using

ng des design and gn and tes est dat data, a, B B&W as asses ess the he longev

  • ngevity of
  • f HELC

LC as as pr proj

  • jected f

d for

  • r com
  • mmer

ercial appl application

  • n
  • Altex, B&W and

and Echoge hogen def define ne weak eak poi point nts in n des design gn for

  • r fur

urther er refinem ement ent

  • Using

ng input nputs from

  • m VPE and

and B&W, def define ne the he cos

  • st of
  • f HELC

LC for

  • r the

he appl application of n of int nter erest

  • Eval

aluate per perfor

  • rmance

e and and cos

  • sts rel

elat ative to

  • Heat

eatric and and al alter erna native RHEX and and conc

  • nclude

e on

  • n viabi

ability and and benef benefits of

  • f HELC

LC for

  • r the

he appl application

  • ns of
  • f

intere rest st

  • Tran

ansmit the he res esul ults t to

  • DOE for
  • r rev

eview ew and and com

  • mmen

ent

44

slide-45
SLIDE 45

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 7 – Evaluate Performance and Economics

Capacity Capital Cost Volumetric Heat Transfer Coefficient Typical Installation Cost Pressure Drop Operating Costs – Pumps Volume and Mass Estimated Maintenance Cost Footprint Estimated Lifetime Costs

Performance and Cost Parameters for AHEC

45

slide-46
SLIDE 46

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 7 – Evaluate Performance and Economics

Task ask 7 7 miles estone e log

  • g

46 Milestone Number Task Number Milestone Planned Start Date Planned Completion Date Actual Completion Date Verification Measure 8 7 Define HELC Performance and Costs 3/1/2016 5/15/2016 Doc 9 7 DOE Review Evaluation Results and Comment 5/15/2016 5/31/2016 Comment

slide-47
SLIDE 47

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 8 – Transition Plan

Def efine how how to

  • best

best t trans ransition t the H he HELC LC to com

  • commerc

ercial use use

47

slide-48
SLIDE 48

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 8 – Transition Plan

  • Bas

ased on ed on scal aling ng, per performanc nce and and int ntegr egrity t tes ests and and ec econo

  • nomic anal

analysis res esul ults, def define how ne how to

  • bes

best t trans ansition

  • n

HELC LC to c

  • com
  • mmercial

al us use

  • Prepa

epare t the pl he plan an that hat will gui guide de thi his t trans ansition

  • n and

and subm ubmit t to

  • DOE for
  • r rev

eview ew and and com

  • mment
  • Prepa

epare and and pr pres esen ent a a paper paper on

  • n the s

he stat atus and and res esul ults

  • f
  • f H

HELC LC pr proj

  • jec

ect

48

slide-49
SLIDE 49

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

Task 8 – Transition Plan

Tas Task 8 8 miles eston

  • ne l

e log

  • g

49 Milestone Number Task Number Milestone Planned Start Date Planned Completion Date Actual Completion Date Verification Measure 10 8 DOE Review Transition Plan and Comment 5/15/2016 5/31/2016 Comment

slide-50
SLIDE 50

ALTEX T TECHNOL OLOGI OGIES C COR ORPOR ORATION ON

HELC Project Schedule Summary

50

HELC Meeting Discussion And Questions/Answers