Local Corporate Boundary Consolidated I-70 EDA 0 0.25 0.5 1 - - PDF document

local corporate boundary consolidated i 70 eda 0 0 25 0 5
SMART_READER_LITE
LIVE PREVIEW

Local Corporate Boundary Consolidated I-70 EDA 0 0.25 0.5 1 - - PDF document

SMITH RD E 251 S OLD NATIONAL RD L CHALBURY DR R W WAMSLEY WAY T I L Y L I T A R M E E 300 S S B R T I D R L E TOWNSHIP LINE RD A R S RONALD REAGAN PKWY C E E MAIN ST E V PLAINFIELD RD O MAPLE LN RED OAK


slide-1
SLIDE 1

I 70 S S R 2 6 7 E MAIN ST REEVES RD E 700 S S P E R R Y R D S CENTER ST E L M D R AIRTECH PKWY RAMP E 600 S BROOKSIDE LN AIRWEST BLVD E HADLEY RD SMITH RD WHITAKER RD E TOWNSHIP LINE RD COLUMBIA RD S H A D Y L N E 8 S E BUCHANAN ST S 975 E PLAINFIELD RD E P E R R Y R D SIMMONS ST S 750 E S 1 2 5 E N D A N J O N E S R D S R O N A L D R E A G A N P K W Y RAYMOND ST STANLEY RD N C A R R R D E 300 S E 750 S S 1 7 5 E GLADDEN RD S 8 7 5 E C L O V E R D R S 1 5 E STOUT HERITAGE PKWY WALTON DR STAFFORD RD RAINES ST R E D P R I D E D R L I B E R T Y T R L CAMBRIDGE WAY HARDING ST BOUNTIFUL PL G A T E W A Y D R E 251 S LAWNDALE DR P I N E W O O D D R R E T A I L R D WAYSIDE DR LONDA LN S 925 E RENEE DR OAK HILL DR HARTFORD AVE H O L I D A Y D R EDWARDS DR MELODY LN C H A D C T CLARKS CREEK RD G I B B S S T 2 N D S T QUAIL RIDGE N DR SHAW ST BEECH DR S BEECH DR N LINCOLN TRL CHALBURY DR ELDIN DR MAPLE LN M I C H A E L D R BLUFF RD C I N E M A B L V D E RAMSEY LN W R A M S E Y L N E S T H E R C T OLD NATIONAL RD ANDICO RD WILLMAN DR E 5 5 S KATHRYN DR LAKEWOOD DR RED OAK DR HOBBS ST MIDFIELD CT W I L L I A M S T R A C E BRIDGEFIELD DR E B I R C H C T WAMSLEY WAY LOCUST DR I 70 S 1025 E E 7 5 S S RONALD REAGAN PKWY C L A R K S C R E E K R D E 6 S S 8 7 5 E R A M P R A M P S 1025 E E 7 S S 975 E S 1025 E RAMP

Consolidated I-70 EDA

Legend

Consolidated and Combined EDA

Roads

Interstate Primary Arterial Secondary Arterial Collector Local Corporate Boundary

±

0.5 1 1.5 0.25

Miles

slide-2
SLIDE 2

Existing I70 EDA Existing East End EDA Area to be combined and consolidated with I70 and East End

Map 1

slide-3
SLIDE 3

East End I70 To be added

Map 2

slide-4
SLIDE 4

Consolidated I-70 EDA

Map 3

Consolidated I-70 EDA

slide-5
SLIDE 5

Consolidated I-70 EDA

Summary of current and future projects Total projects I 70 allocation area 4,950,000 $ East End allocation area 50,523,750 $ South of 70 100,249,692 $ Consolidated I-70 EDA Total 155,723,442 $

slide-6
SLIDE 6

I 70 Allocation area

Projects 1 Clarks Creek bank stabilization project between Hunters Ridge and Gateway Drive 550,000 $ 2 Thoroughfare plan update 50,000 $ 3 Intersection improvements at 267 and Hadley 2,000,000 $ 4 South water main loop from Holiday Inn Express to Sycamore Estates 900,000 $ 5 Sewer interceptor from Clarks Creek to SW and SE quadrants of I-70 Interchange 800,000 $ 6 Pedestrian Crossing from north to south I-70 400,000 $ 7 Prorated share of Anderson Water Plant future expansion to 8 MGD (4) 250,000 $ 4,950,000 $

slide-7
SLIDE 7

I-70 Economic Development plan

1 3 4 5

slide-8
SLIDE 8

East End Tif area

Potential Projects Quantity Unit Cost Estimate (Concept) Notes 1 Streetscape of RRP from Stafford road to Main Street 2.0 miles 2,400,000 $ Quaker Blvd budget $3.5 for 3 miles in 2016. 2 Street lighting of RRP from Stafford road to Main Street 2.0 miles 850,000 $ Compared with Quaker Blvd lighting $1M in 3 miles 3 Additional Lanes NB and SB along RRP from Stafford to Main Street 3.5 miles 15,000,000 $ 7 lane miles 4 Stafford road upgrade from RRP to Marion County Line 2,600 ft 2,600,000 $ 5 Bridge over East fork of White Lick at Stafford road 1 LS 1,000,000 $ Estimated cost for two township line road bridges was $1.8M. 6 Airtech Parkway from RRP intersection to Marion County Line 2,800 ft 2,800,000 $ 7 East Fork of White Lick Sanitary Sewer Stafford to Main 13,000 ft 4,793,750 $ Poindexter price for segment at Greenpark 2 cost $264,500 for a 900 foot section, $295/ft. Also added 25% for soft costs 8 Raceway road south of Main Street to Plainfield Road 3,300 ft 3,300,000 $ 9 Wamsley Way from RRP to Plainfield Road 2,200 2,200,000 $ 10 Intersection improvements at RRP and Stafford Road 1 LS 1,500,000 $ Compares with recent RRP-Main Street intersection 11 Plainfield Road from Stafford to existing culdesac 3,200 ft 3,200,000 $ 12 Plainfield Road from Airtech Parkway to Wamsley Way 1,300 ft 1,300,000 $ 13 Raceway to Earlham South connector(future Road A) 1,400 ft 1,400,000 $ 14 Earlham South from CR 251S to Wamsley Way 2,000 ft 2,000,000 $ 15 CR 251 S water main 1,000 ft 100,000 $ 16 Raceway road water main 3,300 ft 380,000 $ Bore under RRP needed 17 Earlham South water main 2,000 ft 200,000 $ 18 Raceway to Earlham South connector(future Road A) 1,100 ft 1,100,000 $ 19 Plainfield Road water main Airtech to Wamsley Way 1,200 ft 1,200,000 $ 20 Wamsley Way water main 2,300 ft 280,000 $ Bore under RRP needed 21 Airtech Parkway water main 2,300 ft 230,000 $ 22 Plainfield Road water main from Stafford road to culdesac 3,200 ft 320,000 $ 23 Stafford road water main from Marion County line to Midfield Court 3,200 ft 370,000 $ Bore under RRP needed 24 East Fork Trail from Stafford to Main Street 2.5 miles 2,000,000 $ Trail master plan est range $110 to $150 per foot; $800,000 per mile 50,523,750 $

slide-9
SLIDE 9

Future Earlham South Future Wamsley Way Signal and intersection improvements Signal and Intersection improvements Gateway Landscape and Lighting improvements and future added lanes Bridge Over East fork of White Lick Creek

East Fork Intercept

  • r

Sewer

Greenpark 3 Greenpark 2

Stout Heritage Parkway

Klondike Road North IU Health Logistics Building Gateway Landscape and Lighting improvements & future added lanes

A

Parcels Excluded from East End Tif Knight Transportation

East End Economic Development plan

slide-10
SLIDE 10

South of I-70 project list 1 Camby Road SR 267 to CR 1050 East (3-Lane Urban) includes bridge & utilities 11,717,779.72 $ 2 Camby Road CR 1050 East to Marion County Line (3-Lane Urban) includes utilities 6,506,448.77 $ 3 CR 1050 E from Camby Road to SR 67 (3-Lane Urban) includes utilities 6,307,432.19 $ 4 Orly Road from Camby Road to CR 1075 East (2-Lane Urban) includes bridge and utilities 8,130,000.00 $ 5 Bountiful Place from Orly Road to Camby Road (2-Lane Urban) includes utilities 3,721,365.87 $ 6 Willsee Lane from Camby Road to SR 267 (2-Lane Urban) includes utilities 1,955,000.00 $ Engineering, Legal, contingency for projects 1-6 8,434,365.84 $ Total Cost = 46,772,392.40 $ 7 SR 267 South Connector Alternative 1 - South to Hendricks County Road (5-Lane Urban) 11,200,000.00 $ 7 alt SR 267 South Connector Alternative 2 - South and East to CR 1025 E Tie into SR 267 (5-Lane Urban) 21,840,000.00 $ 8 Fly-Over Intersection Improvement at SR 67 6,000,000.00 $ Engineering, Legal, contingency for project 7 and 8 3,784,000.00 $ Total Cost With Alternative 1 = 20,984,000.00 $ Total Plan Subtotal With Alternative 2 27,840,000.00 $ Engineering, Legal, contingency for project 7alt and 8 6,124,800.00 $ Total Cost With Alternative 2 = 33,964,800.00 $ 9 Interchange Improvement at SR 267 and I70 TBD 10 Intersection of Camby Road and SR 267; signal; turn lanes 1,500,000.00 $ 1,500,000.00 $ Camby Road west of 267 to CR 800 E (3-Lane Urban) 750,000.00 $ 750,000.00 $ Engineering, Legal, contingency for project 10 Unaccounted for Items (10%) 562,500.00 $ Project 10 total 2,812,500.00 $ 11 Fire Station 124 1 15,000,000 $ 15,000,000.00 $ Recreation and Environmental Costs 12 RDC land purchase from Town (including survey and subdivsion platting) 1,700,000.00 $ Master planning for recreation and habitat uses TBD Environmental, Habitat and Wildlife related land purchases TBD Environmental and Habitat improvements/enhancements TBD Invasive species removal project TBD Mitigation projects TBD Wetlands construction projects TBD Stream enhancement projects TBD Recreational improvements and development TBD Deer population management Study phase TBD Camping area improvements TBD Lodging TBD Park buildings TBD Trails TBD Tree planting TBD Total South of 70 100,249,692.40 $

slide-11
SLIDE 11

Map Key Red = Likely Business uses Green= Likely Habitat/park uses Orange = Mixed use areas of habitat/business/park to be determined in cooperative efforts with land owners and regulatory agencies Yellow = roadway improvements Blue = East fork flood plain areas Note: utility improvements not shown for clarity

Economic Development Plan for area south

  • f 70 within Consolidated I-70 EDA
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14