local corporate boundary consolidated i 70 eda 0 0 25 0 5
play

Local Corporate Boundary Consolidated I-70 EDA 0 0.25 0.5 1 - PDF document

SMITH RD E 251 S OLD NATIONAL RD L CHALBURY DR R W WAMSLEY WAY T I L Y L I T A R M E E 300 S S B R T I D R L E TOWNSHIP LINE RD A R S RONALD REAGAN PKWY C E E MAIN ST E V PLAINFIELD RD O MAPLE LN RED OAK


  1. SMITH RD E 251 S OLD NATIONAL RD L CHALBURY DR R W WAMSLEY WAY T I L Y L I T A R M E E 300 S S B R T I D R L E TOWNSHIP LINE RD A R S RONALD REAGAN PKWY C E E MAIN ST E V PLAINFIELD RD O MAPLE LN RED OAK DR L C D R R E T S T A S E D I L N N 2 R ANDICO RD O D J C N I N D A N D E R L M N R D Y A R LOCUST DR R D B A RAINES ST A L T C K H V S E D N S E D S R R B C B Y R I S G GLADDEN RD R K STOUT HERITAGE PKWY R R E R P D A D R L S L AIRTECH PKWY E BUCHANAN ST Y C D HOBBS ST E A BROOKSIDE LN A M D H I L L C E O I SHAW ST M H MELODY LN LAWNDALE DR SIMMONS ST C T C H B I R BRIDGEFIELD DR E RAYMOND ST LONDA LN HARDING ST BEECH DR N S S KATHRYN DR R WAYSIDE DR 2 BEECH DR S 6 7 STAFFORD RD WALTON DR MIDFIELD CT COLUMBIA RD R D EDWARDS DR D O T O C W D S E A R N H O I P C STANLEY RD N A WHITAKER RD BLUFF RD L ELDIN DR D R E AIRWEST BLVD A G R A M P A N P K W Y REEVES RD S CENTER ST P M A R RENEE DR E RAMP 5 5 0 E RAMSEY LN I 70 N T S L C Y R E E S H E M T A HARTFORD AVE I 70 S 0 CAMBRIDGE WAY R E 5 0 W R 1 D S R D E P E R R Y E OAK HILL DR D I R E CLARKS CREEK RD 6 0 0 S P E D 5 E 7 S 1025 E 0 R E 600 S E HADLEY RD BOUNTIFUL PL 1 S QUAIL RIDGE N DR RAMP R D LINCOLN TRL Y A W S 1025 E E T A G S 750 E S 1025 E E 5 7 8 S E 700 S LAKEWOOD DR S E 7 0 0 S 975 E E 5 7 8 S WILLMAN DR 5 0 S E 7 E 750 S S 975 E E 8 0 0 S S 925 E E Legend 5 2 0 1 S Consolidated and Combined EDA Roads Interstate Primary Arterial Secondary Arterial Collector ± Local Corporate Boundary Consolidated I-70 EDA 0 0.25 0.5 1 1.5 Miles

  2. Map 1 Existing East End EDA Existing I70 EDA Area to be combined and consolidated with I70 and East End

  3. Map 2 East End I70 To be added

  4. Map 3 Consolidated I-70 EDA Consolidated I-70 EDA

  5. Consolidated I-70 EDA Summary of current and future projects Total projects I 70 allocation area $ 4,950,000 East End allocation area $ 50,523,750 South of 70 $ 100,249,692 Consolidated I-70 EDA Total $ 155,723,442

  6. I 70 Allocation area Projects 1 Clarks Creek bank stabilization project between Hunters Ridge and Gateway Drive $ 550,000 2 Thoroughfare plan update $ 50,000 3 Intersection improvements at 267 and Hadley $ 2,000,000 4 South water main loop from Holiday Inn Express to Sycamore Estates $ 900,000 5 Sewer interceptor from Clarks Creek to SW and SE quadrants of I-70 Interchange $ 800,000 6 Pedestrian Crossing from north to south I-70 $ 400,000 7 Prorated share of Anderson Water Plant future expansion to 8 MGD (4) $ 250,000 $ 4,950,000

  7. I-70 Economic Development plan 3 1 4 5

  8. East End Tif area Potential Projects Cost Estimate Quantity Unit (Concept) Notes Streetscape of RRP from Stafford road to Main Street 2.0 miles $ 2,400,000 Quaker Blvd budget $3.5 for 3 miles in 2016. 1 Street lighting of RRP from Stafford road to Main Street 2.0 miles $ 850,000 Compared with Quaker Blvd lighting $1M in 3 miles 2 Additional Lanes NB and SB along RRP from Stafford to Main Street 3.5 miles $ 15,000,000 7 lane miles 3 Stafford road upgrade from RRP to Marion County Line 2,600 ft $ 2,600,000 4 5 Bridge over East fork of White Lick at Stafford road 1 LS $ 1,000,000 Estimated cost for two township line road bridges was $1.8M. Airtech Parkway from RRP intersection to Marion County Line 2,800 ft $ 2,800,000 6 Poindexter price for segment at Greenpark 2 cost $264,500 for East Fork of White Lick Sanitary Sewer Stafford to Main 13,000 ft $ 4,793,750 a 900 foot section, $295/ft. Also added 25% for soft costs 7 Raceway road south of Main Street to Plainfield Road 3,300 ft $ 3,300,000 8 Wamsley Way from RRP to Plainfield Road 2,200 $ 2,200,000 9 Intersection improvements at RRP and Stafford Road 1 LS $ 1,500,000 Compares with recent RRP-Main Street intersection 10 Plainfield Road from Stafford to existing culdesac 3,200 ft $ 3,200,000 11 Plainfield Road from Airtech Parkway to Wamsley Way 1,300 ft $ 1,300,000 12 Raceway to Earlham South connector(future Road A) 1,400 ft $ 1,400,000 13 Earlham South from CR 251S to Wamsley Way 2,000 ft $ 2,000,000 14 CR 251 S water main 1,000 ft $ 100,000 15 16 Raceway road water main 3,300 ft $ 380,000 Bore under RRP needed Earlham South water main 2,000 ft $ 200,000 17 Raceway to Earlham South connector(future Road A) 1,100 ft $ 1,100,000 18 Plainfield Road water main Airtech to Wamsley Way 1,200 ft $ 1,200,000 19 Wamsley Way water main 2,300 ft $ 280,000 Bore under RRP needed 20 Airtech Parkway water main 2,300 ft $ 230,000 21 Plainfield Road water main from Stafford road to culdesac 3,200 ft $ 320,000 22 Stafford road water main from Marion County line to Midfield Court 3,200 ft $ 370,000 Bore under RRP needed 23 East Fork Trail from Stafford to Main Street 2.5 miles $ 2,000,000 Trail master plan est range $110 to $150 per foot; $800,000 per mile 24 $ 50,523,750

  9. East End Economic Development plan Klondike Road North Gateway Landscape and Lighting improvements & future added A lanes Future Earlham South Future Wamsley Way IU Health Logistics Building Signal and intersection improvements East Fork Intercept or Greenpark 3 Sewer Gateway Landscape and Lighting improvements and future added lanes Greenpark 2 Stout Heritage Parkway Parcels Excluded from East End Tif Knight Transportation Bridge Over Signal and East fork of Intersection White Lick improvements Creek

  10. South of I-70 project list 1 Camby Road SR 267 to CR 1050 East (3-Lane Urban) includes bridge & utilities $ 11,717,779.72 2 Camby Road CR 1050 East to Marion County Line (3-Lane Urban) includes utilities $ 6,506,448.77 CR 1050 E from Camby Road to SR 67 (3-Lane Urban) includes utilities $ 6,307,432.19 3 4 Orly Road from Camby Road to CR 1075 East (2-Lane Urban) includes bridge and utilities $ 8,130,000.00 5 Bountiful Place from Orly Road to Camby Road (2-Lane Urban) includes utilities $ 3,721,365.87 6 Willsee Lane from Camby Road to SR 267 (2-Lane Urban) includes utilities $ 1,955,000.00 Engineering, Legal, contingency for projects 1-6 $ 8,434,365.84 Total Cost = $ 46,772,392.40 7 SR 267 South Connector Alternative 1 - South to Hendricks County Road (5-Lane Urban) $ 11,200,000.00 7 alt SR 267 South Connector Alternative 2 - South and East to CR 1025 E Tie into SR 267 (5-Lane Urban) $ 21,840,000.00 8 Fly-Over Intersection Improvement at SR 67 $ 6,000,000.00 Engineering, Legal, contingency for project 7 and 8 $ 3,784,000.00 Total Cost With Alternative 1 = $ 20,984,000.00 Total Plan Subtotal With Alternative 2 $ 27,840,000.00 Engineering, Legal, contingency for project 7alt and 8 $ 6,124,800.00 Total Cost With Alternative 2 = $ 33,964,800.00 Interchange Improvement at SR 267 and I70 TBD 9 10 Intersection of Camby Road and SR 267; signal; turn lanes $ 1,500,000.00 $ 1,500,000.00 Camby Road west of 267 to CR 800 E (3-Lane Urban) $ 750,000.00 $ 750,000.00 Engineering, Legal, contingency for project 10 Unaccounted for Items (10%) $ 562,500.00 Project 10 total $ 2,812,500.00 11 Fire Station 124 1 $ 15,000,000 $ 15,000,000.00 Recreation and Environmental Costs RDC land purchase from Town (including survey and subdivsion platting) $ 1,700,000.00 12 Master planning for recreation and habitat uses TBD Environmental, Habitat and Wildlife related land purchases TBD Environmental and Habitat improvements/enhancements TBD Invasive species removal project TBD Mitigation projects TBD Wetlands construction projects TBD Stream enhancement projects TBD Recreational improvements and development TBD Deer population management Study phase TBD Camping area improvements TBD Lodging TBD Park buildings TBD Trails TBD Tree planting TBD Total South of 70 $ 100,249,692.40

  11. Economic Development Plan for area south of 70 within Consolidated I-70 EDA Map Key Red = Likely Business uses Green= Likely Habitat/park uses Orange = Mixed use areas of habitat/business/park to be determined in cooperative efforts with land owners and regulatory agencies Yellow = roadway improvements Blue = East fork flood plain areas Note: utility improvements not shown for clarity

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.