little mountain udp presentation
play

Little Mountain UDP Presentation May 18, 2016 Summary of UDP - PowerPoint PPT Presentation

Little Mountain UDP Presentation May 18, 2016 Summary of UDP Evaluation of Dec 2015 Plan Dec 2015 Site Plan Transitional edges work well Central spine and permeability are strong Tree retention is good Establish Big


  1. Little Mountain – UDP Presentation May 18, 2016

  2. Summary of UDP Evaluation of Dec 2015 Plan Dec 2015 Site Plan • Transitional edges work well • Central spine and permeability are strong • Tree retention is good • Establish “Big Idea” • Sameness of built form contributes to lack of sense of place • Solar performance should drive public realm, particularly: NW corner and community, plaza • Plaza needs to be larger, better connected to spine, more activated, sunnier in late afternoon • Consider a grocery store • More commitment to sustainability of building envelope • Consider alternatives to district energy Little Mountain – UDP Presentation May 18, 2016

  3. Big Idea: City-Park Linkage Retained Trees Establish Public Realm Structure Little Mountain – UDP Presentation May 18, 2016

  4. Big Idea: City-Park Linkage Plaza + Spine + Park are Community Heart; Primary Linkage Little Mountain – UDP Presentation May 18, 2016

  5. Big Idea: City-Park Linkage Secondary Connections Reinforce Linkage Little Mountain – UDP Presentation May 18, 2016

  6. Big Idea: City-Park Linkage Landmark Buildings Reinforce Legibility of Public Realm Primary Secondary Little Mountain – UDP Presentation May 18, 2016

  7. Primary Landmark Buildings Little Mountain – UDP Presentation May 18, 2016

  8. Secondary Landmark Buildings Little Mountain – UDP Presentation May 18, 2016

  9. Primary Streetwall Little Mountain – UDP Presentation May 18, 2016

  10. Secondary Streetwall Little Mountain – UDP Presentation May 18, 2016

  11. View From Southeast Little Mountain – UDP Presentation May 18, 2016

  12. Southeast Quadrant Site Plan – December 2015 (Before) Site Plan – May 2016 (After) Little Mountain – UDP Presentation May 18, 2016

  13. Southeast Quadrant 1 1. Plaza sunlight performance enhanced, particularly in late afternoon 2 2. Plaza enlarged and extended to Central Spine 3 3. Active use added to building AA 4 4. Building AA is landmark for views from Main and Quebec Streets 5 5. Buildings AA, EC stepped for better edge transition to adjacent area 6. Building BA reoriented to activate plaza edge, create sunny courtyard 6 5 5 View From Southeast 40’ 4 4 ’ 5 66’ 1 8 7 4 ’ 3 2 40’ 125’ 38’ 6 View From Southwest Partial Site Plan Little Mountain – UDP Presentation May 18, 2016

  14. Southeast Quadrant Land Use Plan – December 2015 (Before) Land Use Plan – May 2016 (After) Retail / Commercial Retail / Commercial Neighbourhood House (above) Neighbourhood House (above) Daycare Daycare Housing – Non-market Seniors Housing – Non-market Seniors Housing – Non-market Family Housing – Non-market Family Housing – Non-market Family Housing – Non-market Family (above) (above) Housing – Market Housing – Market Project Boundary Housing – Market (above) Project Boundary Little Mountain – UDP Presentation May 18, 2016

  15. Southeast Quadrant Plaza Area – December 2015 (Before) Plaza Area – May 2016 (After) Little Mountain – UDP Presentation May 18, 2016

  16. Plaza Sunlight Performance, Equinox at 4 PM Previous Current Little Mountain – UDP Presentation May 18, 2016

  17. Plaza Sunlight Performance, Equinox at 6 PM Previous Current Little Mountain – UDP Presentation May 18, 2016

  18. Community Plaza Daily Use Little Mountain – UDP Presentation May 18, 2016

  19. Community Plaza Neighbourhood House Programming Little Mountain – UDP Presentation May 18, 2016

  20. Community Plaza Rendering Little Mountain – UDP Presentation May 18, 2016

  21. Southwest Quadrant Site Plan – December 2015 (Before) Site Plan – May 2016 (After) Little Mountain – UDP Presentation May 18, 2016

  22. Southwest Quadrant 1 - Continuous pathway connection from plaza to QE Park 2 - Height and massing varied, particularly on Ontario Street edge 3 - Building CC-2 pulled north to preserve tree, improve plaza solar performance 4 - Additional trees retained / protected - Sunlight performance on Wedge Park very good, similar to previous 5 6 - Large, contiguous, south-facing courtyard 14’ 5 View From Southwest 60’ 7 5 ’ 4 18’ 3 5 0 ’ 100’ 2 6 2 80’ 4 1 50’ 5 0 ’ 4 4 Partial Site Plan View From Northwest Little Mountain – UDP Presentation May 18, 2016

  23. Southwest Quadrant Existing and Proposed Trees Plan – December 2015 (Before) Existing and Proposed Trees – May 2016 (After) Existing Trees Existing Trees Proposed Public Trees Proposed Public Trees Transplanted Tree Transplanted Tree Project Boundary Project Boundary Little Mountain – UDP Presentation May 18, 2016

  24. Southwest Quadrant Mobility – December 2015 (Before) Mobility – May 2016 (After) Local Street Bikeways Local Street Bikeways Painted Shared Use Painted Shared Use Painted Bike Lanes Painted Bike Lanes 3m Designated Bicycle Route 3m Designated Bicycle Route Shared Public Paths Shared Public Paths Shared Semi Private Residential Paths Shared Semi Private Residential Paths Sidewalks Sidewalks Laneway Connections Laneway Connections Bike Access to Parking Amenities Bike Access to Parking Amenities Bike Access to Existing COV Bike Routes Bike Access to Existing COV Bike Routes Bus Stops Bus Stops Pedestrian Path to Transit Pedestrian Path to Transit Project Boundary Project Boundary Little Mountain – UDP Presentation May 18, 2016

  25. Northwest Quadrant Site Plan – December 2015 (Before) Site Plan – May 2016 (After) Little Mountain – UDP Presentation May 18, 2016

  26. Northwest Quadrant 1 - Continuous east-west path connecting to Northeast Quadrant path 2 - Generous view corridors from Central Spine to QE Park 3 - Tall buildings are offset for varied street edges; overlooks are minimized 4 - Courtyards are generously scaled for daylight and privacy 5 - Ontario Street sunlight performance improved 6 - Generous setback (18 ft) on west side of Central Spine to accommodate stormwater feature 1 4 0 ’ 5 0 ’ 2 View From Northwest 4 1 8 ’ 66’ 6 5 3 1 9 0 ’ 1 2 9 7 ’ 4 3 1 4 ’ Partial Site Plan View From Southwest Little Mountain – UDP Presentation May 18, 2016

  27. Northwest Quadrant – Shadows at 4 PM Previous Current Little Mountain – UDP Presentation May 18, 2016

  28. Landmark Building DC Massing Little Mountain – UDP Presentation May 18, 2016

  29. Landmark Building DC Parti Little Mountain – UDP Presentation May 18, 2016

  30. Landmark Building DC Component Definition Little Mountain – UDP Presentation May 18, 2016

  31. Landmark Building DC Schematic Design Little Mountain – UDP Presentation May 18, 2016

  32. Landmark Building DC Street View Little Mountain – UDP Presentation May 18, 2016

  33. Landmark Building AA Massing Little Mountain – UDP Presentation May 18, 2016

  34. Landmark Building AA Parti Little Mountain – UDP Presentation May 18, 2016

  35. Landmark Building AA Component Definition Little Mountain – UDP Presentation May 18, 2016

  36. Landmark Building AA Schematic Design Little Mountain – UDP Presentation May 18, 2016

  37. Landmark Building AA Street View Little Mountain – UDP Presentation May 18, 2016

  38. Landmark Building CC-2 Massing Little Mountain – UDP Presentation May 18, 2016

  39. Landmark Building CC-2 Parti Little Mountain – UDP Presentation May 18, 2016

  40. Landmark Building CC-2 Component Definition Little Mountain – UDP Presentation May 18, 2016

  41. Landmark Building CC-2 Schematic Design Little Mountain – UDP Presentation May 18, 2016

  42. Landmark Building CC-2 Street View Little Mountain – UDP Presentation May 18, 2016

  43. B L D G C C - 2 Sustainable Buildings Provide solar shading R-value for roof to be ≠R30 on south, east and west façades to reduce solar heat gain Possible inclusion of solar panels R-value for exterior wall to Where appropriate, roof - be R15 depending upon top gardens reduce heat wall construction system island effect and moderate storm fmows Building envelope to use durable materials; Cladding with continuous insulation All windows double glazing with low e coating; Maintain ±50% window concrete buildings with to wall area ratio for a metal framing systems, passive approach to u-0.35; wood building with building envelope design PVC windows, u-0.26 Provide landscaped patios R-values for to reduce heat island effect suspended fmoor and moderate storm fmows. to be ≠R20 May incorporate edible landscaping Underground parking to be Explore exterior solar held back in some locations to shades and louvres where improve storm infjltration and overhangs are impractical preserve existing trees Little Mountain – UDP Presentation May 18, 2016

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend