Limerick Landfill Closure Plan PRESENTED TO: MAYOR AND MEMBERS OF COUNCIL, MUNICIPALITY OF SOUTHWEST MIDDLESEX PRESENTED BY: FABIANO GONDIM, M.ENG., P.ENG. May 27, 2020 AGENDA Key Activities Completed to Date Closure Plan Summary


  1. Limerick Landfill Closure Plan PRESENTED TO: MAYOR AND MEMBERS OF COUNCIL, MUNICIPALITY OF SOUTHWEST MIDDLESEX PRESENTED BY: FABIANO GONDIM, M.ENG., P.ENG. May 27, 2020

  2. AGENDA Key Activities Completed to Date Closure Plan Summary Implementation: Landfill Closure Works Ministry’s Approval Summary ___ 2

  3. Key Activities Completed to Date  Feb. 2018 - Council’s motion to close the Limerick Landfill  Oct. 2018 - Topographic survey completed ___ 3

  4. Key Activities Completed to Date (Cont’d)  Nov. 2018 – City staff and Golder met with the Ministry of the Environment, Conservation and Parks (“Ministry”), London District Office to discuss the monitoring program  Dec. 2018 - Installation of monitoring wells ___ 4

  5. Key Activities Completed to Date (Cont’d)  Jan. 2019 - Groundwater, surface water and methane gas sampling completed by Golder ___ 5

  6. Key Activities Completed to Date (Cont’d)  Jan. 2019 - Water samples were analysed by an independent laboratory and results sent to Golder  Jun. 2019 - City staff and Golder met with the Ministry’s London District Office to discuss monitoring results and status of the closure plan. Mutual collaboration continued ___ 6

  7. Key Activities Completed to Date (Cont’d)  Dec. 2019 - Golder prepared the Closure Plan and submitted to the Ministry for approval (as required by O.Reg. 232/98)  May 2020 – Ministry’s approval ___ 7

  8. Closure Plan Summary  Report that describes how the site will be closed and managed after closure  Detailed description of the surface and subsurface conditions  Historical operations  Assessment of potential impacts to surface water and groundwater RECOMMENDATIONS  Landfill closure works Monitoring program   Post-closure inspections and maintenance ___ 8

  9. Implementation: Landfill Closure Works C U R R E N T C O N D I T I O N S , 6 - H E C TA R E ( 1 5 - A C R E ) P R O P E R T Y ___ 9

  10. Implementation: Closure Works (Cont’d) P R O P O S E D - O V E R A 4 - H E C TA R E ( 1 0 - A C R E ) A R E A  Applies to ¾ of the site  Regrade to improve surface water drainage Apply clay cover   Revegetate  Complete stormwater management works  Other minor works ___ 10

  11. Implementation: Closure Works (Cont’d) C O S T E S T I M AT E  $900,000  75 cm (2’6”) thick cover  The site does not have available soil for cover construction Soil would be imported   Soil type requirement  Clay soil to minimize water infiltration, which reduces the potential for landfill impact to groundwater ___ 11

  12. Ministry’s Approval Summary R E Q U I R E M E N T S  Requirements for closure works to be completed within 5 years  Timing to complete closure works: one construction season and/or phased approach (Municipality’s discretion) Requirements (conditions) consistent  with recent approvals for other ON landfills  Additional future activities (included in the Ministry’s approval conditions) such as inspections, signage, staff training, nuisance control ___ 12

  13. Thank you. Fabiano Gondim Senior Waste Engineer Golder Associates Ltd. fgondim@golder.com 905-567-4444

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.