PORT CLINTON LIFT BRIDGE PROJECT SEPTEMBER 29, 2017 PORT CLINTON LIFT BRIDGE Rebecca Dangelo, Public Information Kyle Ruedel, Project Engineer Mark Mondora, Area Engineer 2 | Port Clinton Lift Bridge Project IMPORTANT DATES August-
2 |
PORT CLINTON LIFT BRIDGE
Rebecca Dangelo, Public Information Kyle Ruedel, Project Engineer Mark Mondora, Area Engineer
Port Clinton Lift Bridge Project
3 |
IMPORTANT DATES
- August- October 14
Daily single lane restriction
- October 14
Close bridge to all vehicle traffic & pedestrians
- October-December
Multiple 4-day ½ river restrictions -
- Restrictions as follows.
10/16/17-10/19/17 – North half of span will remain down for removal. South half of channel to remain open. Full channel for 10/20/17-10/22/17 10/23/17-10/26/17 – South half of span will remain in the closed position for removal. Full channel to remain open beginning 10/27/17
- December 2-April 1
Bridge allowed to remain in the closed “masted”
- position. Boats able to pass under are able to do so.
- April 1
Open River – April 1, 2018 at noon
- May 25
Open Road & Pedestrian access restored
Port Clinton Lift Bridge Project
4 |
OVERALL PLAN
- Test text
Port Clinton Lift Bridge Project
5 |
MACHINERY
Port Clinton Lift Bridge Project
6 |
ARCHITECTURAL DETAIL
Port Clinton Lift Bridge Project
7 |
VIDEO MONITORING
Port Clinton Lift Bridge Project
12 Cameras Total 2 Thermal Cameras 2 Traffic sensor cameras 4 Channel cameras
8 |
?
QUESTIONS