Lead plant modernization introduction of new technology and Addressing the Environmental Issues. Complexity of metal recovery Addressing the Environmental Issues High level of raw material use complexity Nowadays all technologically recovered


slide-1
SLIDE 1
slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16

Lead plant modernization – introduction of new technology and Addressing the Environmental Issues. Complexity of metal recovery

slide-17
SLIDE 17

Addressing the Environmental Issues

slide-18
SLIDE 18

High level of raw material use complexity

Nowadays all technologically recovered minerals are represented by 18 final products.

slide-19
SLIDE 19

UKMC Sulfur Containing Gases Mitigation

Investment– 41,5 bln. KZ tenge ($ 280,4 million), with general costs of environmental action more than 65 bln. KZ tenge ($ 439,2 million.)

slide-20
SLIDE 20

High technology «Haldor Topsoe»

Plant investment is 5,4 bln. KZ tenge ($ 37 million)

slide-21
SLIDE 21

Existing Lead Production

slide-22
SLIDE 22

Existing Lead Production

The main ecological disadvantage of this technology is substantial volume of sinter section poor sulfurous gases formation and lack of experience in the world how to transform them into sulfuric acid.

slide-23
SLIDE 23
  • Modernization. Isasmelt Process (Xstrata Technology, Australia)

High ecologization

slide-24
SLIDE 24
  • Modernization. Isasmelt Process (Xstrata Technology, Australia)
slide-25
SLIDE 25
  • Modernization. Isasmelt Process(«Xstrata Technology», Australia)
slide-26
SLIDE 26
  • Modernization. Isasmelt Process(«Xstrata Technology», Australia)
slide-27
SLIDE 27

Lead Production Modernization. Ecology.

New Sulphuric Acid Plant «Haldor Topsoe» Technology Classic Contact Method Cleaning

ACTIVITIES OVERLAP IN CASE OF SHUT DOWN

slide-28
SLIDE 28

Lead Production Modernization. Ecology.

Implementation of new process instead

  • f «Sintering – Blast Furnace» has been

planned for the latter half of the year

  • 2012. Which will result in environmental

benefits with reduced annual emissions

  • f sulfur dioxide on the Lead Plant from

31 000 tonnes (2006) up to 14 000 tonnes.

slide-29
SLIDE 29

Lead Production Modernization. Ecology.

slide-30
SLIDE 30

«Kazzinc» is one of the leaders in the worldʹs best technologies introduction