brewster hjorth architects
joint program in medicine Assessment of required facilities at CSU - - PowerPoint PPT Presentation
joint program in medicine Assessment of required facilities at CSU - - PowerPoint PPT Presentation
csu/wsu joint program in medicine Assessment of required facilities at CSU Orange 25 October 2018 brewster hjorth architects 1.0 campus based learning assessment of required spaces Learning Space Description No. Area (m2) Flat Floor
1.0 campus based learning
assessment of required spaces
Learning Space Description No. Area (m2) Flat Floor Learning 40 person flexible lecture or classroom style 1 129 Active Based Learning 40 person collaborative style specialist learning space 1 132 Model Room and future anatomical museum display of anatomical models with work benches for student study 1 150 Simulation Laboratory - hospital mode 2 x 4 bed wards accommodating 24 students 2 43+67 Simulation Laboratory - Clinic mode 6 clinic suite accommodating 12 students 1 75 Anatomy Laboratory 9 table anatomy laboratory for student tutorials 1 120 Ultra Sound Room
- pen space with a plinth and ultrasound
unit and seating for up to 12 students 1 43 Informal Learning - ‘Home Room’ Flexible space with a mix of seating. Promotes collegiate atmosphere for group and individual work 1 150 Tutorial Rooms 10 student tutorial room 4 35 reuse existing new refurbish/reconfigure existing
- Group table arrangement to active learning space at
- An example of PBL tutorial room at WSU
1.0 campus based learning
briefing diagrams
- 1.0 campus based learning
analysis of existing utilisation
1.0 campus based learning
analysis of existing utilisation
1.0 campus based learning
- verall design strategy - mid campus level
1.0 campus based learning
- verall design strategy - upper campus level
- 1.0 campus based learning
design options - anatomy
- 1.0 campus based learning
design layouts - active based learning
- 1.0 campus based learning
design layouts - problem based learning
2.0 academic hub
Staff Type required staff for 37 student place per year required staff for 60 student place per year Medicine Academic (Medicine) 24 26 Research 4 4 Academic (Basic Science) 6 9 Technical 5 8 Administration 3 6 Sub total 42 53 Biomedical Sciences School of Bio-medical Sciences 11 11 Total 53 64
- academic staff accommodation
- 2.0 academic hub
research centre/ ISC
Research Centre
- Indigenous Support Centre (ISC)
2.0 academic hub
design layout - level 2
good connection with PC2 laboratory OFFICES OFFICES CONF. SHOWCASE good visibility as from carpark entry to main pedestrian spine good links to proposed Medical teaching facilities North Facing Entry Forecourt main pedestrian spine
2.0 academic hub
design layout - level 3
OFFICES FUTURE OFFICES ATRIUM
RESEARCH INDIGENOUS SUPPORT EXTERNAL INDIGENOUS SUPPORT SPACE
2.0 academic hub
design layout - level 1
3.0 clinical learning centre
briefing diagrams
3.0 clinical learning centre
design layout
4.0 program
Time to complete concept design2019 2020 2021
Current date Best time for- ut of session
2018
5.0 Summary of Demolition
and Assets Created - Orange Campus
Buildings Demolished Area (m2) Building 1010 536 Building 1011 348 Building 1015 (Demountable) 137 Building 1016 (Demountable) 136 Total Area 1157 Assets Created Area (m2) Extensions to Experimental Learning Centre 340 New Academic Hub 1566 Total Area 1906