Jesús M. Busturia
Managing Director jmbusturia@nautilusfs.com
Jess M. Busturia Managing Director jmbusturia@nautilusfs.com May - - PowerPoint PPT Presentation
Jess M. Busturia Managing Director jmbusturia@nautilusfs.com May 2018 Vision: Mission: To be a global player To Design & Manufacture in the coming market for floating foundations Floating Offshore Wind for Offshore Wind Located in
Managing Director jmbusturia@nautilusfs.com
5 This information is confidential and belongs to NAUTILUS Floating Solutions, S.L. No copy or transmission is allowed without a written approval. May 2018
Limited shallow water locations. Most of the wind resource lies in deep waters with less turbulence. Reduced environmental impact
Huge potential around the world. Access to markets without extended continental shelf: USA, Japan, Norway, France, Portugal, Spain, … Even in the North Sea there are areas with high wind resource in deep waters Coastal areas with high energy demand.
May 2018 This information is confidential and belongs to NAUTILUS Floating Solutions, S.L. No copy or transmission is allowed without a written approval. 6
Source: Carbon Trust, Floating Offshore Wind: Market and Technology Review, 2015
Source ORECCA
The available continental shelf is very small 80% of the offshore wind resource in Europe is located in Deep Waters > than 60 m
Giles Dickson, CEO WindEurope, FOWT 2017, Marseille
May 2018 This information is confidential and belongs to NAUTILUS Floating Solutions, S.L. No copy or transmission is allowed without a written approval. 7
Four-columns semisubmersible floating sub-structure Rigid ring pontoon connecting the columns with flat lower surface Main deck consisting of four rectangular shaped connections between column´s upper end and transition piece (TP) Simple support structure to manufacture
▪ Compact dimensions ▪ Few parts ▪ No tubular joints ▪ Steel construction ▪ Standard catenary mooring ▪ No need for large investment in port facilities
Draft adjustment and mean heel angle compensation through active water ballasting Simple installation procedure using a small number of low-cost vessels.
May 2018 This information is confidential and belongs to NAUTILUS Floating Solutions, S.L. No copy or transmission is allowed without a written approval. 8
Third Party Verification & Certification
Conceptual Design (2017) CDR Ramboll Feasibility DNVGL Detailed Design (2018-19) PDR Design Basis CDR Design Certif. Technology & Market Assessment ORE Catapult Project risk management Patent pending EP 16382658.9
Design validation
Tank Testing (2014) 1:60 UC Cork (2018) ≈1:35 Ifremer (2014) 1:35 IH Cantabria (2018) SINTEF OCEAN
NREL 5MW, DTU 10MW, others
Wind Turbine
2012 - 2013 2014 - 2016 2017 - 2018 2018 - 2019 2020 - 2021
Technical Feasibility Conceptual Design Economical Feasibility Basic Design / FEED Detailed Design Full scale manufacturing & deployment
Design Phases
Detailed Design Preliminary Design
May 2018 This information is confidential and belongs to NAUTILUS Floating Solutions, S.L. No copy or transmission is allowed without a written approval. 9
H2020 SME Instrument
waters
H2020 – LCE2: EERA Wind LIFES 50+ Project
substructure designs for 10MW turbines
DNV-GL Joint Industry Project CDTI – CIEN: FLOCAN2GRID
Technologies associated to the evacuation and network integration of Floating Offshore Wind Farms.
SODERCAN: I+C=+C
Gangway to Access Marine Energy devices
HAZITEK 2016 – Basque Country
Wind
HAZITEK 2017 – Basque Country
May 2018 This information is confidential and belongs to NAUTILUS Floating Solutions, S.L. No copy or transmission is allowed without a written approval. 10
Parque Científico y Tecnológico de Bizkaia Edificio 612, Off. 11 E-48160 Derio, Bizkaia Spain
nautilusfs.com
Jesús M. Busturia
Managing Director jmbusturia@nautilusfs.com