It’s About Time….& Location
by Doug Staker – VP of Utility Development- Enel X
Its About Time.& Location by Doug Staker VP of Utility - - PowerPoint PPT Presentation
Its About Time.& Location by Doug Staker VP of Utility Development- Enel X Enel Group today Evolution and achievements since 2014 1 #1 renewable operator #1 private network globally operator globally ~40GW managed 65 mn end users
by Doug Staker – VP of Utility Development- Enel X
Evolution and achievements since 20141
Countries of presence4
#1 private network
65 mn end users and 44 mn digital meters #1 renewable operator globally ~40GW managed capacity2 47 GW thermal capacity Highly flexible and efficient assets 10 GW capacity closure 20 mn free retail customers #1 in Italy, Iberia and top 3 in Latam
1. 2014-2017 delivery. As of 2017E 2. Including replacement of smart meters 2.0 in Italy. Enel global market share equal to 24% (BNEF 3Q17 Energy Smart technologies market Outlook) 3. Consolidated capacity equal to 37 GW (including 25 GW of large hydro) 4. Presence with operating assets
mitigate Climate Change and keep temperature rises to a maximum of 1.5ºC.
human-caused CO2 emissions will need to fall 45% from 2010 levels by 2030 in order to reach "net zero" by 2050
Courtesy Utility Dive
Energy is the measure of electrons delivered- kWh Think of Energy measurement as the Odometer Power is the measure of the “rate” that electrons were delivered Power = Capacity = Demand Think of Power Measurement as the Speedometer It is also measured in kWh/h but is written as kW
Graph Courtesy of the Regulatory Assistance Project
Time of Use Pricing
Before 2018
Peak
12pm-6pm 4pm -9pm
Mid Peak 8-12pm & 6-10pm
10pm-8am
Off Peak
10 pm- 8 am 8 am- 4 pm
Programatic
Demand Management
Program. OutCome Based
Imporvement
We can’t build a digital power grid based on an analog rate design
Monthly Daily Hourly
Convert from a monthly structure to a daily structure with TOU Locational value
Borough Hall 11 AM to 3 PM Bay ridge & Park Slope 2 PM to 6 PM Williamsburg & Ocean Parkway 4 PM to 8 PM Ridgewood, FlatBush, Crown Heights, Flatbush, Sheepshead Bay, Brighton Beach 7 PM to 11 PM
LMP for Energy Supply
“The electric industry is in a period of momentous change. The innovative potential of the digital economy has not yet been accommodated within the electric distribution system. Information technology, electronic controls, distributed generation, and energy storage are advancing faster than the ability of utilities and regulators to adopt them, or to adapt to them. At the same time, electricity demands of the digital economy are increasingly expressed in terms of reliability, choice, value, and security.” Opening Paragraph: ORDER ADOPTING REGULATORY POLICY FRAMEWORK AND IMPLEMENTATION PLAN New York Public Service Commission- February 26, 2015
Doug Staker VP of Utility Business Development Enel