It’s About Time….& Location

by Doug Staker – VP of Utility Development- Enel X

slide-2
SLIDE 2

Enel Group today

Evolution and achievements since 20141

Countries of presence4

#1 private network

  • perator globally

65 mn end users and 44 mn digital meters #1 renewable operator globally ~40GW managed capacity2  47 GW thermal capacity Highly flexible and efficient assets 10 GW capacity closure 20 mn free retail customers #1 in Italy, Iberia and top 3 in Latam

1. 2014-2017 delivery. As of 2017E 2. Including replacement of smart meters 2.0 in Italy. Enel global market share equal to 24% (BNEF 3Q17 Energy Smart technologies market Outlook) 3. Consolidated capacity equal to 37 GW (including 25 GW of large hydro) 4. Presence with operating assets

slide-3
SLIDE 3

United Nations' Intergovernmental Panel on Climate Change

  • We have until 2030 to

mitigate Climate Change and keep temperature rises to a maximum of 1.5ºC.

  • The report suggests

human-caused CO2 emissions will need to fall 45% from 2010 levels by 2030 in order to reach "net zero" by 2050

Courtesy Utility Dive

slide-4
SLIDE 4

Locational Value of Storage

slide-5
SLIDE 5

Energy and Power

Energy is the measure of electrons delivered- kWh Think of Energy measurement as the Odometer Power is the measure of the “rate” that electrons were delivered Power = Capacity = Demand Think of Power Measurement as the Speedometer It is also measured in kWh/h but is written as kW

slide-6
SLIDE 6

Load Duration Curve

slide-7
SLIDE 7

Generation Optimization

slide-8
SLIDE 8

Con Edison Seasonal Line Losses

slide-9
SLIDE 9

Time Variable Distribution “Cost”

Marginal Line losses are exponential and are dynamic based on the I2R Losses. Average losses are measured over an extended time period overlook the benefits of load reduction at Peak periods.

Graph Courtesy of the Regulatory Assistance Project

slide-10
SLIDE 10

Challenge in California

  • Solar Production has changed

Time of Use Pricing

Before 2018

Peak

12pm-6pm 4pm -9pm

Mid Peak 8-12pm & 6-10pm

10pm-8am

Off Peak

10 pm- 8 am 8 am- 4 pm

slide-11
SLIDE 11

Regulatory Reform- Performance Based Earning Adjustment Mechanisms

Programatic

  • BQDM-Brooklyn Queens

Demand Management

  • NWA-Non Wire Alternatives
  • DMP II- Demand Management

Program. OutCome Based

  • Increased DER Deployment
  • Network Load Factor

Imporvement

  • Green House Gas Reduction
slide-12
SLIDE 12

GHG EAM

slide-13
SLIDE 13

Rate Evolution

We can’t build a digital power grid based on an analog rate design

Monthly Daily Hourly

slide-14
SLIDE 14

A Move to Daily Demand Charges

Convert from a monthly structure to a daily structure with TOU Locational value

slide-15
SLIDE 15

Con Ed Brooklyn Locational Peak Periods

Borough Hall 11 AM to 3 PM Bay ridge & Park Slope 2 PM to 6 PM Williamsburg & Ocean Parkway 4 PM to 8 PM Ridgewood, FlatBush, Crown Heights, Flatbush, Sheepshead Bay, Brighton Beach 7 PM to 11 PM

slide-16
SLIDE 16

NYISO Day-Ahead Locational Marginal Pricing

LMP for Energy Supply

slide-17
SLIDE 17

The Digital Power Grid

“The electric industry is in a period of momentous change. The innovative potential of the digital economy has not yet been accommodated within the electric distribution system. Information technology, electronic controls, distributed generation, and energy storage are advancing faster than the ability of utilities and regulators to adopt them, or to adapt to them. At the same time, electricity demands of the digital economy are increasingly expressed in terms of reliability, choice, value, and security.” Opening Paragraph: ORDER ADOPTING REGULATORY POLICY FRAMEWORK AND IMPLEMENTATION PLAN New York Public Service Commission- February 26, 2015

slide-18
SLIDE 18

Thank You

Doug Staker VP of Utility Business Development Enel