Islanded Operation Mahdi Izadkhast Learning Objectives What are - - PowerPoint PPT Presentation

islanded operation
SMART_READER_LITE
LIVE PREVIEW

Islanded Operation Mahdi Izadkhast Learning Objectives What are - - PowerPoint PPT Presentation

Ancillary Services in Microgrids During Islanded Operation Mahdi Izadkhast Learning Objectives What are the most important services for microgrids during islanded mode? How are the frequency and voltage support controlled during


slide-1
SLIDE 1

Ancillary Services in Microgrids During Islanded Operation

Mahdi Izadkhast

slide-2
SLIDE 2

Learning Objectives

  • What are the most important

services for microgrids during islanded mode?

  • How are the frequency and voltage

support controlled during islanded mode?

  • What is the islanding process?
slide-3
SLIDE 3

Islanded Mode

slide-4
SLIDE 4

Frequency Support

slide-5
SLIDE 5

Frequency Control

slide-6
SLIDE 6

1 min

f

2 min

f

3 min

f

Safe operation of island system Loads are disconnected Loads Are more disconnected Island system is shut down

f

t

Frequency Control

slide-7
SLIDE 7

1 min

f

2 min

f

3 min

f

Safe operation of island system Loads are disconnected Loads Are more disconnected Island system is shut down

f

t

Frequency Control

Small fraction of loads disconnected

slide-8
SLIDE 8

1 min

f

2 min

f

3 min

f

Safe operation of island system Loads are disconnected Loads Are more disconnected Island system is shut down

f

t

Frequency Control

A fraction of loads disconnected Additional fraction of loads disconnected

slide-9
SLIDE 9

1 min

f

2 min

f

3 min

f

Safe operation of island system Loads are disconnected Loads Are more disconnected Island system is shut down

f

t

Frequency Control

Small fraction of loads disconnected Larger fraction of loads disconnected

slide-10
SLIDE 10

1 max

f

2 max

f

Island system is shut down Loads are connected Safe operation of island system

f

t

Frequency Control

slide-11
SLIDE 11

1 max

f

2 max

f

Island system is shut down Loads are connected Safe operation of island system

f

t

Frequency Control

slide-12
SLIDE 12

1 max

f

2 max

f

Island system is shut down Loads are connected Safe operation of island system

f

t

Frequency Control

slide-13
SLIDE 13

Voltage Control

slide-14
SLIDE 14

Black Start

slide-15
SLIDE 15

Islanding

slide-16
SLIDE 16

Summary