Introduction to Intelligent Transportation Systems (ITS): I-285 - PowerPoint PPT Presentation

Introduction to Intelligent Transportation Systems (ITS): I-285 Variable Speed Limits Andrew Hoenig, P.E. Inno novat ative e Delivery Georg orgia ia Departme tment nt of Transpor nsporta tation ion January 8, 2015 VSL System


  1. Introduction to Intelligent Transportation Systems (ITS): I-285 Variable Speed Limits Andrew Hoenig, P.E. Inno novat ative e Delivery Georg orgia ia Departme tment nt of Transpor nsporta tation ion January 8, 2015

  2. VSL System • Higher traffic volumes on Top End • Signs change based on downstream speed data • Posted speeds updated automatically by NaviGAtor. • TMC can override VSLs • Travelling at a slower, more consistent speed can: – Decrease congestion – Save motorists on gasoline – Reduce accidents – Less idling improves air quality

  3. VSL Design-Build Contract • $4.9M Design-Build contract Awarded Oct 2012 • Install 176 VSL signs (88 locations) Clockwise & Counter-clockwise • I-285 Top End (I-20 to I-20) • Median & outside shoulder • 8 overhead Changeable Message Signs • Revised to 9 through Supplemental Agreement (SA) • Increase Speed Limit on bottom end (I-20 to I- 20) to 65 mph • Contract completion originally September 2014, revised to January 2015

  4. Design-Build Scope • Ensure adequate Closed-Circuit TV coverage • Solar Power signs allowed • Ensure proper connection to Navigator II, including system testing • Install power & fiber infrastructure, including 96 fiber optic cable on both sides of I-285 from SR 400 to I-85

  5. Special Provisions (SP) • SP 631: Portable Changeable Message Sign • SP 682: Electrical Wire, Cable and Conduit • SP 935: Fiber Optic System • SP 936: Closed Circuit Television (CCTV) • SP 937: Video Detection System • SP 939: Communication and Electrical Equipment • SP 940: NaviGAtor Advanced Transportation Management System

  6. ITS Challenges • Fiber Verification Report – Overestimating existing ITS required a negative SA • Liquidated Damages • Contractor & Systems Integrator Coordination • Hub Building capacity • Power Source • System Testing

  7. Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.