Introduc tion to the Joint Cre diting Me c ha nism (JCM) JCM Wor - - PowerPoint PPT Presentation

introduc tion to the joint cre diting me c ha nism jcm
SMART_READER_LITE
LIVE PREVIEW

Introduc tion to the Joint Cre diting Me c ha nism (JCM) JCM Wor - - PowerPoint PPT Presentation

Introduc tion to the Joint Cre diting Me c ha nism (JCM) JCM Wor kshop: Polic y on L ow Car bon E c onomy an the Role of Bilate r al Me c hanism in T hailand Ba ng ko k, T ha ila nd 25 Ja nua ry 2016 Ale xis R. Roc amor a Po lic y


slide-1
SLIDE 1

Introduc tion to the Joint Cre diting Me c ha nism (JCM)

JCM Wor kshop: Polic y on L

  • w Car

bon E c onomy an the Role of Bilate r al Me c hanism in T hailand

Ba ng ko k, T ha ila nd 25 Ja nua ry 2016

Ale xis R. Roc amor a

Po lic y Re se a rc he r Clima te a nd E ne rg y Are a I nstitute fo r Glo b a l E nviro nme nta l Stra te g ie s ro c a mo ra @ ig e s.o r.jp

slide-2
SLIDE 2

2

2

Pr e se ntation the me s

JCM in b rie f JCM Me tho do lo g ie s a nd Re g iste re d Pro je c ts JCM F ina nc ing Pro g ra mme T e c hnic a l suppo rt a nd F urthe r info rma tio n

slide-3
SLIDE 3

3

3

T he Joint Cr e diting Me c hanism (JCM)

I mple me nt jo intly b y b o th c o untry Pro mo te to diffuse le a ding lo w c a rb o n te c hno lo g ie s, pro duc ts, e tc . E va lua ting GHG e missio n re duc tio ns b y me a sure me nt, re po rting a nd ve rific a tio n (MRV)

slide-4
SLIDE 4

4

4

Sc he me of the JCM

slide-5
SLIDE 5

5

5

JCM Pr

  • gr

e ss to date

  • JCM Par

tne r Countr ie s (16 Countr ie s)

– Mo ng o lia , Ba ng la de sh, E thio pia , K e nya , Ma ldive s, Vie t Na m, L a o PDR, I ndo ne sia , Co sta Ric a , Pa la u, Ca mb o dia , Me xic o , Sa udi Ara b ia , Chile , Mya nma r a nd T ha ila nd!

  • 8 Re giste r

e d Pr

  • je c ts

– E ne rg y e ffic ie nc y (4), Re ne wa b le e ne rg y (1), T ra nspo rt (1) – I ndo ne sia (3), Mo ng o lia (2), Pa la u (1), a nd Vie t Na m (2)

  • 19 Appr
  • ve d Me thodologie s

– E ne rg y e ffic ie nc y (16), Re ne wa b le e ne rg y (1), T ra nspo rt (1), Wa ste to e ne rg y (1) – I ndo ne sia (11), Mo ng o lia (2) , Pa la u (1) , Ma ldive s (1), Vie tna m (4)

  • E

stablishme nt of JCM we bsite

– https:/ / www.jc m.g o .jp/

  • E

stablishme nt of JCM r e gistr y

– I ssua nc e o f JCM c re dits

slide-6
SLIDE 6

6

6

1. Mongolia 2. Banglade sh 3. E thiopia 4. Ke nya 5. Maldive s 6. Vie t Nam 7. L ao PDR 8. Indone sia 9. Costa Ric a

2013

10. Palau 11. Cambodia 12. Me xic o

2014

13. Saudi Arabia 14. Chile 15. Myanmar 16. T hailand

2015

JCM Par tne r Countr ie s

1 2 3 4 5 6 13 7 14 10 8 15 11 9 16 12

slide-7
SLIDE 7

7

7

JCM Ope r ation to date

  • E

stablishme nt & Ope r ation of the Joint Committe e (JC)

– 13 c ountrie s have organize d the JC and adopte d

rule s and guide line s, approve d me thodology, re giste re d proje c ts

  • E

stablishme nt & Ope r ation of the we bsite – JCM we b pa g e ha s la unc he d a nd

  • pe ra te d

(https:/ / www.jc m.g o .jp/ ) – Some partne r c ountrie s have e stablishe d its own

we bsite (Indone sia, Vie tnam, Banglade sh, e tc .)

  • E

stablishme nt & Ope r ation of the r e gistr y

– https:/ / www.jc mre g istry.g o .jp/ – Ope ration sinc e last Nov.

slide-8
SLIDE 8

8

8

Conc e pt of the JCM me thodology

  • E

missio n re duc tio ns = re fe re nc e e missio ns - pro je c t e missio ns

  • Re fe re nc e e missio ns: c a lc ula te d b e lo w b usine ss‐a s‐usua l (Ba U)
  • Ba U e missio ns: e missio ns tha t wo uld like ly b e e mitte d b y c o nsta nt
  • pe ra tio n o f insta lla tio ns witho ut the pro po se d JCM pro je c t.

So urc e : Go ve rnme nt o f Ja pa n (2015) Re c e nt De ve lo pme nt o f the Jo int Cre diting Me c ha nism (JCM), No v. 2015

E nsur e s a ne t de c r e ase or avoidanc e of GHG e missions.

slide-9
SLIDE 9

9

9

  • Re ne wa b le E

ne rg y

  • E

ne rg y Sa ving (E ne rg y E ffic ie nc y)

  • Wa ste Ha ndling & Dispo sa l
  • T

ra nspo rt

T ypic a l Se c tors for JCM Proje c ts

slide-10
SLIDE 10

10

10

F e atur e s of the JCM Me thodology

1. T he JCM me tho do lo g ie s a re de sig ne d in suc h a wa y tha t pro je c t pa rtic ipa nts c a n use the m e a sily a nd ve rifie rs c a n ve rify the da ta e a sily. 2. I n o rde r to re duc e mo nito ring b urde n, de fa ult va lue s a re wide ly use d in a c o nse rva tive ma nne r. 3. E lig ib ility c rite ria c le a rly de fine d in the me tho do lo g y c a n re duc e risks o f re je c tio n o f the pro je c ts pro po se d b y pro je c t pa rtic ipa nts.

E lig ib ility c rite ria

  • A “c he c k list” will a llo w e a sy de te rmina tio n o f e lig ib ility o f a pro po se d

pro je c t unde r the JCM a nd a pplic a b ility o f JCM me tho do lo g ie s to the pro je c t. Da ta (pa ra me te r)

  • L

ist o f pa ra me te rs will a llo w pro je c t pa rtic ipa nts to de te rmine wha t da ta is ne c e ssa ry to c a lc ula te GHG e missio n re duc tio ns/ re mo va ls with JCM me tho do lo g ie s.

  • De fa ult va lue s fo r spe c ific c o untry a nd se c to r a re pro vide d b e fo re ha nd.

Ca lc ula tio n

  • Pre ma de spre a dshe e ts will a llo w GHG e missio n re duc tio ns/ re mo va ls to

b e c a lc ula te d a uto ma tic a lly b y inputting re le va nt va lue s fo r pa ra me te rs, in a c c o rda nc e with me tho do lo g ie s.

slide-11
SLIDE 11

11

11

Pr

  • je c t

T ype Pr

  • je c t T

ittle E Rs (t- CO2/ y) Re gistr ation Date Countr y

E ne rg y E ffic ie nc y E ne rg y Sa ving fo r Air-Co nditio ning a nd Pro c e ss Co o ling b y I ntro duc ing Hig h-e ffic ie nc y Ce ntrifug a l Chille r 114 31-Oc t-14 I ndo ne sia E ne rg y E ffic ie nc y Pro je c t o f I ntro duc ing Hig h E ffic ie nc y Re frig e ra to r to a F ro ze n F

  • o d Pro c e ssing Pla nt in I

ndo ne sia 120 29-Ma r-15 I ndo ne sia E ne rg y E ffic ie nc y Pro je c t o f I ntro duc ing Hig h E ffic ie nc y Re frig e ra to r to a F

  • o d

I ndustry Co ld Sto ra g e in I ndo ne sia 21 29-Ma r-15 I ndo ne sia E ne rg y E ffic ie nc y Pro mo tio n o f g re e n ho spita ls b y impro ving e ffic ie nc y / e nviro nme nt in na tio na l ho spita ls in Vie tna m 515 30-No v-15 Vie tna m

E xample of Re giste r e d JCM pr

  • je c ts

L e ft: Hig h-e ffic ie nc y Ce trifug a l Chile r, Middle a nd Rig ht : Hig h E ffic ie nc y Re frig e ra to r

slide-12
SLIDE 12

12

12

E xample of Re giste r e d JCM pr

  • je c ts

Pr

  • je c t

T ype Pr

  • je c t T

ittle E Rs (t- CO2/ y) Re gistr ati

  • n Date

Countr y

E ne rg y E ffic ie nc y Ce ntra liza tio n o f he a t supply syste m b y insta lla tio n o f hig h- e ffic ie nc y He a t Only Bo ile rs in Bo rnuur so um Pro je c t 92 30-Jun-15 Mo ng o lia E ne rg y E ffic ie nc y I nsta lla tio n o f hig h-e ffic ie nc y He a t Only Bo ile rs in 118th Sc ho o l

  • f Ula a nb a a ta r City Pro je c t

206 30-Jun-15 Mo ng o lia Re ne wa b l e e ne rg y Sma ll sc a le so la r po we r pla nts fo r c o mme rc ia l fa c ilitie s in isla nd sta te s 227 21-Apr-15 Pa la u T ra nspo rt E c o -Driving b y Utilizing Dig ita l T a c ho g ra ph Syste m 296 4-Aug -15 Vie tna m L e ft: Hig h-e ffic ie nc y He a t Only Bo ile rs, Middle : So la r Po we r Pla nts a nd Rig ht : Dig ita l T a c ho g ra ph Syste m

slide-13
SLIDE 13

13

13

Appr

  • ve d JCM Me thodologie s

E ne rg y E ffic ie nc y 14 (74%) Re ne wa b le e ne rg yie s, 2 (11%) Bio g a s, 1 (5%) T ra nspo rta tio n, 1 (5%) Wa ste g a s/ he a t utiliza tio n, 1 (5%)

T YPE OF T E CHNOL OGIE S COVE RE D BY T HE 19 APPROVE D ME T HODOL OGIE S

So urc e : IGE S JCM Pro je c t Da ta b a se

slide-14
SLIDE 14

14

14

F inanc ing oppor tunitie s fr

  • m the JCM

L e ading low- c ar bon te c hnologie s:

  • Re duc e GHG e missio ns
  • Re duc e o pe ra ting c o sts c o mpa re d to c o nve ntio na l te c hno lo g ie s
  • Ha ve hig h initia l inve stme nt c o sts.

T he JCM financ ing pr

  • gr

amme s:

  • F

und pa rt o f initia l inve stme nt c o sts (up to 50%) to fa c ilita te disse mina tio n o f lo w-c a rb o n te c hno lo g ie s in de ve lo ping c o untrie s

  • Co ve r the c o sts o f: ma in c o nstruc tio n wo rk, a nc illa ry wo rk,

ma c hine ry a nd a pplia nc e s, surve ying a nd te sting , fa c ilitie s a nd a dministra tive wo rk.

So urc e : JCM Mo de l Pro je c ts Pub lic Offe ring Guide line s te nta tive tra nsla tio n (GE C we b site )

slide-15
SLIDE 15

15

15

JCM F inanc ing Pr

  • gr

amme s

  • Budg e t (F

Y2015): 2.4 b illio n JPY/ye ar (USD18 millio n) until F Y2017

  • Ob je c tive : to fina nc e pro je c ts (up to the ha lf o f inve stme nt c o sts)

with hig h e ffic ie nc y in re duc ing GHG e missio ns

JCM Mode l Pr

  • je c t
  • Budg e t (F

Y2015): 1.8 b illio n JPY/ye ar (USD18 millio n) until F Y2018

  • Ob je c tive : to fina nc e pro je c ts (up to the ha lf o f inve stme nt c o sts)

with hig h e ffic ie nc y in re duc ing GHG e missio ns in c o lla b o ra tio n with pro je c ts suppo rte d b y JI CA a nd o the r g o ve rnme nt fina nc ia l institute s.

Collabor ative F inanc ing Pr

  • gr

amme

  • Budg e t (F

Y2015): 1.8 b illio n JPY (USD18 millio n)

  • Ob je c tive : to pro vide fina nc ia l inc e ntive s fo r the a do ptio n o f lo w-

c a rb o n te c hno lo g ie s with a dva nc e d GHG e missio n re duc tio n c a pa b ilitie s b ut e xpe nsive in ADB- fina nc e d pro je c ts.

ADB T r ust F und

slide-16
SLIDE 16

16

16

JCM Mode l Pr

  • je c t

Gove r nme nt of Japan Glo b a l E nviro nme nt Ce ntre F

  • unda tio n (GE

C) Inte r national c onsor tium

F inanc e s part o f inve stme nt c o sts (up to the half) Co nduc t MRV and de live rs at le ast half o f the JCM c re dits issue d

So urc e : JCM Mo de l Pro je c ts Pub lic Offe ring Guide line s te nta tive tra nsla tio n (GE C we b site )

Budg e t (F Y 2015): 2.4 b illio n JPY/ye ar (USD20 millio n)

  • Applic a nt pro file : priva te c o mpa ny, inde pe nde nt a dministra tive institutio n,

inc o rpo ra te d a sso c ia tio n o r fo unda tio n…

  • Jo int a pplic a tio n b y a n inte rna tio na l c o nso rtium: a Ja pa ne se pa rtic ipa nt a nd a JCM

pa rtne r-c o untry pa rtic ipa nt

  • Pro je c ts c o mple tio n pe rio d: insta lla tio ns sta rt a fte r the a do ptio n o f the funding a nd

must b e c o mple te d within 3 ye a rs.

slide-17
SLIDE 17

17

17

JCM F inanc ing Pr

  • gr

amme s

So urc e : I GE S JCM Pro je c t Da ta b a se (De c . 2015)

Ind o ne sia , 18 Vie t Na m, 11 T ha ila nd , 7 Ba ng la d e sh, 5 K e nya , 3 Pa la u, 3 Mo ng o lia , 3 Ca mb o d ia , 2 Ma ld ive s, 2 E thio pia , 1 Sa ud i Ara b ia , 1 Mya nma r, 1 Ma la ysia , 1 L a o PDR, 1

7 16 36 10 20 30 40 2013 2014 2015

slide-18
SLIDE 18

18

18

Country Proje c t T ittle Ba ng la de sh (5)

○ E ne rg y Sa ving fo r Air Co nditio ning & F a c ility Co o ling b y Hig h E ffic ie nc y Ce ntrifug a l Chille r (Sub urb s o f Dha ka ) ○ I nsta lla tio n o f Hig h E ffic ie nc y L

  • o m a t We a ving F

a c to ry ○ I ntro duc tio n o f PV-die se l Hyb rid Syste m a t F a ste ning Ma nufa c turing Pla nt ○ 50MW So la r PV Po we r Pla nt Pro je c t ○ I nsta lla tio n o f Hig h E ffic ie nc y Ce ntrifug a l Chille r fo r Air Co nditio ning Syste m in Clo thing T a g F a c to ry

Ca mbodia (2)

○ I ntro duc tio n o f Hig h E ffic ie nc y L E D L ig hting Utilizing Wire le ss Ne two rk ○ I ntro duc tio n o f Ultra -lig htwe ig ht So la r Pa ne ls fo r Po we r Ge ne ra tio n a t I nte rna tio na l Sc ho o l

Indone sia (18)

○ E ne rg y Sa ving fo r Air-Co nditio nio ng a nd Pro c e ss Co o ling a t T e xtile F a c to ry (in Ba ta ng c ity) ○ E ne rg y Sa ving s a t Co nve nie nc e Sto re s ○ E ne rg y E ffic ie nt Re frig e ra nts to Co ld Cha in I ndustry ○ E ne rg y Sa ving b y Do ub le Bundle -T ype He a t Pump a t Be ve ra g e Pla nt ○ E ne rg y Sa ving fo r Air-Co nditio ning a nd Pro c e ss Co o ling a t T e xtile F a c to ry ○ Po we r Ge ne ra tio n b y Wa ste He a t Re c o ve ry in Ce me nt I ndustry ○ So la r Po we r Hyb rid Syste m I nsta lla tio n to E xisting Ba se T ra nsc e ive r Sta tio ns in Off-g rid Are a ○ E ne rg y Sa ving thro ug h I ntro duc tio n o f Re g e ne ra tive Burne rs to the Aluminum Ho lding F urna c e o f the Auto mo tive Co mpo ne nts Ma nufa c ture r ○ E ne rg y Sa ving fo r T e xtile F a c to ry F a c ility Co o ling b y Hig h E ffic ie nc y Ce ntrifug a l Chille r ○ I ntro duc tio n o f hig h e ffic ie nt Old Co rrug a te d Ca rto ns Pro c e ss a t Pa pe r F a c to ry ○ Re duc ing GHG e missio n a t te xtile fa c to rie s b y upg ra ding to a ir-sa ving lo o m ○ E ne rg y Sa ving fo r Air-Co nditio ning a t Sho pping Ma ll with Hig h E ffic ie nc y Ce ntrifug a l Chille r ○ E ne rg y Sa ving fo r I ndustria l Pa rk with Sma rt L E D Stre e t L ig hting Syste m ○ I ntro duc tio n o f Hig h E ffic ie nc y Onc e -thro ug h Bo ile r Syste m in F ilm F a c to ry ○ I nsta lla tio n o f Ga s Co -g e ne ra tio n Syste m fo r Auto mo b ile Ma nufa c turing Pla nt ○ 1.6MW So la r PV Po we r Pla nt Pro je c t in Ja ka b a ring Spo rt City ○ I ntro duc tio n o f Hig h E ffic ie nc y Onc e -thro ug h Bo ile r in Go lf Ba ll F a c to ry

  • RE

DD+ pro je c t in Bo a le mo Distric t

E thiopia (1)

○ I ntro duc tio n o f Bio ma ss CHP Pla nt in F lo o ring F a c to ry

Ke nya (3)

○ So la r Die se l Ab a te me nt Pro je c ts ○ 6MW Sma ll Hydro po we r Ge ne ra tio n Pro je c t in Ruping a zi ○ I ntro duc tio n o f So la r PV Syste m a t Sa lt F a c to ry

○ Mo de l pro je c t in F Y 2013 (3 c o untrie s, 7 pro je c ts) ○ Mo de l pro je c t in F Y 2014 (7 c o untrie s, 15 pro je c ts) ■ ADB JF JCM pro je c t in F Y 2014 (1 c o untry, 1 pro je c t)

T

  • ta l 14 c ountr

ie s, 59 pr

  • je c ts

Unde rline d pro je c ts ha ve b e e n re g iste re d a s JCM pro je c ts ○ Mo de l pro je c t in F Y 2015 (7 c o untrie s, 18 pro je c ts)

  • RE

DD+ Mo de l Pro je c t in F Y 2015 (2 c o untrie s, 2 pro je c ts)

JCM Mode l Pr

  • je c t and ADB JF

JCM

slide-19
SLIDE 19

19

19

Countr y Pr

  • je c t T

ittle

L a os (1)

  • RE

DD+ pro je c t in L ua ng Pra b a ng Pro vinc e thro ug h c o ntro lling slush-a nd-b urn

Ma la ysia (1)

○ PV po we r g e ne ra tio n a nd re le va nt mo nito ring syste m fo r the o ffic e b uilding

Ma ldive s (2)

○ So la r Po we r o n Ro o fto p o f Sc ho o l Building Pro je c t ■ Sma rt Mic ro -Grid Syste m fo r POI SE D Pro je c t in Addu Ato ll

Mong olia (3)

○ Upg ra ding a nd I nsta lla tio n o f Ce ntra lize d Co ntro l Syste m o f Hig h-E ffic ie nc y He a t Only Bo ile r (HOB) ○ 10MW So la r Po we r Pro je c t in Da rkha n City ○ I nsta lla tio n o f 2.1MW So la r Po we r Pla nt fo r Po we r Supply in Ula a nb a a ta r Sub urb

Mya nma r (1)

○ I ntro duc tio n o f Wa ste to E ne rg y Pla nt in Ya ng o n City

Pa la u (3)

○ Sma ll-Sc a le So la r Po we r Pla nt fo r Co mme rc ia l F a c ilitie s in I sla nd Sta te s Pro je c t ○ Sma ll-Sc a le So la r Po we r Pla nts fo r Co mme rc ia l F a c ilitie s Pro je c t I I ○ So la r PV Syste m fo r Sc ho o ls Pro je c t

T ha ila nd (7)

○ E ne rg y Sa ving a t Co nve nie nc e Sto re s with Hig h E ffic ie nc y Air-Co nditio ning a nd Re frig e ra te d Sho wc a se ○ I ntro duc tio n o f So la r PV Syste m o n F a c to ry Ro o fto p ○ Re duc ing GHG E missio n a t T e xtile F a c to ry b y Upg ra ding to Air-sa ving L

  • o m (Sa mutpra ka rn)

○ E ne rg y Sa ving fo r Se mic o nduc to r F a c to ry with Hig h E ffic ie nc y Ce ntrifug a l Chille r a nd Co mpre sso r ○ I nsta lla tio n o f Co -g e ne ra tio n Pla nt fo r On-Site E ne rg y Supply in Mo to rc yc le F a c to ry ○ I nsta lla tio n o f Hig h E ffic ie nc y Air Co nditio ning Syste m a nd Chille rs in Se mic o nduc to r F a c to ry ○ E ne rg y Sa ving fo r Air-Co nditio ning in T ire Ma nufa c turing F a c to ry with Hig h E ffic ie nc y Ce ntrifug a l Chille

Vie tna m (11)

○ Ana e ro b ic Dig e stio n o f Org a nic Wa ste fo r Bio g a s Utiliza tio n a t Ma rke t ○ E c o -driving with the Use o f Dig ita l T a c ho g ra phs ○ I ntro duc tio n o f a mo rpho us hig h e ffic ie nc y tra nsfo rme rs in po we r distrib utio n syste ms ○ I ntro duc tio n o f Hig h E ffic ie nc y Air-c o nditio ning in Ho te l ○ E ne rg y Sa ving in L e ns F a c to ry with E ne rg y E ffic ie nt Air-Co nditio ne rs ○ E ne rg y Sa ving in Ac id L e a d Ba tte ry F a c to ry with Co nta ine r F

  • rma tio n F

a c ility ○ E ne rg y Sa ving in F a c to rie s with Air-Co nditio ning Co ntro l Syste m ○ I ntro duc tio n o f Amo rpho us Hig h E ffic ie nc y T ra nsfo rme rs in So uthe rn a nd Ce ntra l Po we r Grids ○ I nsta lla tio n o f Hig h E ffic ie nc y K iln in Sa nita ry Wa re Ma nufa c turing F a c to ry ○ I ntro duc tio n o f Hig h E ffic ie nc y E le c tric F urna c e a t F

  • undrie s

○ I ntro duc tio n o f So la r PV Syste m a t Sho pping Ma ll in Ho Chi Minh City

Sa udi Ara bia (1)

○ I ntro duc tio n o f Hig h E ffic ie nc y E le c tro lyze r in Chlo rine Pro duc tio n Pla nt

○ Mo de l pro je c t in F Y 2013 (3 c o untrie s, 7 pro je c ts) ○ Mo de l pro je c t in F Y 2014 (7 c o untrie s, 15 pro je c ts) ■ ADB pro je c t in F Y 2014 (1 c o untry, 1 pro je c t)

T

  • ta l 14 c ountr

ie s, 59 pr

  • je c ts

Unde rline d pro je c ts ha ve b e e n re g iste re d a s JCM pro je c ts ○ Mo de l pro je c t in F Y 2015 (7 c o untrie s, 18 pro je c ts)

  • RE

DD+ Mo de l Pro je c t in F Y 2015 (2 c o untrie s, 2 pro je c ts)

JCM Mode l Pr

  • je c t and ADB JF

JCM

slide-20
SLIDE 20

20

20

JCM Mode l Pr

  • je c t in T

hailand

Re pre se nta tive Pa rtic ipa nt Proje c t T itle E xpe c te d GHG E mission Re duc tions (tCO 2/ ye a r)

F amilyMar t Co., L td. E ne r gy Saving at Conve nie nc e Stor e s with High E ffic ie nc y Air

  • Conditioning and Re fr

ige r ate d Showc ase 4,970 Pac ific Consultants Co., L td. Intr

  • duc tion of Solar

PV Syste m on F ac tor y Rooftop 776 T

  • r

ay Industr ie s, Inc . Re duc ing GHG E mission at T e xtile F ac tor y by Upgr ading to Air

  • saving L
  • om (Samutpr

akar n) 646 Sony Se mic onduc tor Cor por ation E ne r gy Saving for Se mic onduc tor F ac tor y with High E ffic ie nc y Ce ntr ifugal Chille r and Compr e ssor 620 NIPPON ST E E L & SUMIKIN E NGINE E RING CO.,L T D. Installation of Co- ge ne r ation Plant for On- Site E ne r gy Supply in Motor c yc le F ac tor y 7,308 Sony Se mic onduc tor Cor por ation Installation of High E ffic ie nc y Air Conditioning Syste m and Chille r s in Se mic onduc tor F ac tor y 2,588 Inabata & Co., L td E ne r gy Saving for Air

  • Conditioning in T

ir e Manufac tur ing F ac tor y with High E ffic ie nc y Ce ntr ifugal Chille r 385

slide-21
SLIDE 21

21

21

Me thodolog y de ve lopme nt PDD De ve lopme nt Monitor ing Re por t Issua nc e of Cr e dit* Va lida tion Ve r ific a tion

*Suppo rt fo r mo nito ring re po rt (first time o nly)

  • Applic a b le fo r pro je c t pa rtic ipa nts to a ll JCM fina nc ing pro g ra mme s

(Mo de l Pro je c ts, Co lla b o ra tive F ina nc ing Pro g ra mme , a nd ADB T rust F und).

  • I

GE S pro vide s te c hnic a l suppo rt fo r Me tho do lo g y De ve lo pme nt, PDD de ve lo pme nt a nd Pre pa ra tio n o f mo nito ring Re po rt

T e c hnic al suppor t fr

  • m MOE

J and IGE S

slide-22
SLIDE 22

22

22 Ne w Me c ha nisms Informa tion Pla tform:

re c e nt de ve lo pme nt o f the JCM

http:/ / www.mme c ha nisms.o rg / e /

GE C we bsite: c a ll fo r pro po sa ls, fina nc ia l

a nd pro je c t d e ve lo pme nt, fe a sib ility study, JCM b o o kle t

http:/ / g e c .jp/ jc m/ inde x.html

IGE S JCM Da ta ba se :

de ta ils o f me tho do lo g ie s, pro je c ts, fe a sib ility studie s

http:/ / b it.ly/ ig e sjc mda ta b a se

Offic ia l JCM We bpa g e : rule s a nd

g uide line s, JCM me tho do lo g y, pro je c ts

https:/ / www.jc m.g o .jp/

F

  • r

fur the r infor mation