Accelerating Low Carbon Development Through JCM Scheme Cahyadi - - PowerPoint PPT Presentation

accelerating low
SMART_READER_LITE
LIVE PREVIEW

Accelerating Low Carbon Development Through JCM Scheme Cahyadi - - PowerPoint PPT Presentation

Accelerating Low Carbon Development Through JCM Scheme Cahyadi Yudodahono Indonesia JCM Secretariat COORDINATING MINISTRY FOR ECONOMIC AFFAIRS REPUBLIC OF INDONESIA Flashback Initial discussions Establishment of 2010 Coordination Team


slide-1
SLIDE 1

COORDINATING MINISTRY FOR ECONOMIC AFFAIRS REPUBLIC OF INDONESIA

Accelerating Low Carbon Development Through JCM Scheme

Cahyadi Yudodahono Indonesia JCM Secretariat

slide-2
SLIDE 2

Flashback

Initial discussions

2010

Establishment of Coordination Team for Carbon Trading (TKPPKA) 2012

2013

JCM Bilateral Agreement

2014

Establishment of Indonesia JCM Secretariat

2016

The first credit issuance

slide-3
SLIDE 3

Recent Updates

3

16

Metho- dology

17

In the pipeline

13

Registered

4

Issued credit

115

Feasiblity studies

31 Model projects 3 Demonstration projects

Sectors

Automotive, Building, Chemical, Energy generation, Food, Forestry , Hospitality , Oil & gas, Paper , Plastic, Retail, T elecommunication, T extile

Investment

$ 134 mil

  • GoJsubsidy ($ 54 mil)
  • Participants ($ 80 mil)

Agriculture, CCS, LULUCF & REDD+, Energy Efficiency , Fugitive Emission, Large-scale, Low- Carbon City , Renewable Energy , Transportation, Waste Handling & Disposal

Investment

$ 10 mil

slide-4
SLIDE 4

City to City Collaboration

4

Surabaya & Kitakyushu

Energy management in buildings Waste management

  • Batam&

Yokohama

Energy efficiency in airport Energy efficiency in waste water treatment Biomas energy

  • Bandung &

Kawasaki

  • Energy

management in buildings

  • Waste

management

  • Street lamps

Semarang & Toyama

  • Bus rapid transit
  • Mini hydro
  • Solar PV
slide-5
SLIDE 5

Who is involved?

5

JCM

7

Ministries

GOI 4

Indonesia cities

4

Japan Cities

3

Ministries

GOJ 39

Indonesia companies

100

Japan companies

2

Indonesia SOEs

11

Third Party Entities

slide-6
SLIDE 6

Example project #1

Power Generation by Waste-Heat Recovery in Cement Factory

6

32 MW Waste Heat Recovery Power Generation at Cement Factory 4 factory units at PT Semen Indonesia in Tuban are able to capture its flue gases emission which is a hot 400 degree celcius air to be used as boiler to generate electricity. This system enables to reduce electricity consumption up to 25% of the total electricity required in the factory.

  • PT. Semen Indonesia, Tuban, East Java

Expected emission reduction

122,000 ton

CO2/year

  • PT. Semen

Indonesia Tbk. JFE Engineering Corporation

slide-7
SLIDE 7

Example project #2

Solar PV Power Plant Project in Jakabaring Sport City

This solar power installed in Jakabaring sport center is able to generate electricity of 2 MW. This project is prepared for the electricity supply in Asian Games 2018 and promotes green sport event in South

  • Sumatera. The project is fully operated since March

2018 and inaugurated in June 2018. Jakabaring Stadium, Palembang South Sumatera

7

Expected emission reduction

1,303 ton

CO2/year

PDPDE Sumatera Selatan Sharp Corporation

slide-8
SLIDE 8

Benefits of JCM

increasing viability, efficiency, competitiveness, access to capital, private investment participation

Financial

development, transfer, capacity

Technology

capacity, health, workforce

Society

8

slide-9
SLIDE 9

Sustainable Development Criteria

Technology

Social Environment &

.

Community Participation

.

Economy

.

Environmental Impact Assessment Safety & Health Natural Environment & Biodiversity Pollution Control

SDIP SDIR

9

slide-10
SLIDE 10

Thank you

COORDINATING MINISTRY FOR ECONOMIC AFFAIRS REPUBLIC OF INDONESIA