Infrastructure Management Data-Center(DCIM) AT+C EDV GmbH - - PowerPoint PPT Presentation

infrastructure management
SMART_READER_LITE
LIVE PREVIEW

Infrastructure Management Data-Center(DCIM) AT+C EDV GmbH - - PowerPoint PPT Presentation

FACILITY- AND VALUE-MANAGER FM.7/VM.7 Infrastructure Management Data-Center(DCIM) AT+C EDV GmbH Liebfrauenstrasse 22 61440 Oberursel / Germany AT+C Customers (among others) Essential aspects of FM7/VM7 Software Solutions


slide-1
SLIDE 1

FACILITY- AND VALUE-MANAGER FM.7/VM.7

AT+C EDV GmbH  Liebfrauenstrasse 22  61440 Oberursel / Germany

Infrastructure Management Data-Center(DCIM)

slide-2
SLIDE 2

AT+C Customers (among others)

slide-3
SLIDE 3

Essential aspects of FM7/VM7 Software Solutions

  • Comprehensive technical functionality - both in

"Facilities" as well as in “Data Centers”

  • Graphical user interface – including CAD

fully integrated in AutoCAD and CADVANCE

  • Consistency of all objects (graphics and database)
  • Open System and Database architecture
  • More than 25 year of experience and development
  • International customer base
  • IT-Security ISO 27001 (port-monitoring)
slide-4
SLIDE 4

Essential aspects of AT+C DCIM Software Solutions

  • Cost savings

Process improvement in operating processes of property and technical infrastructure

  • Transparency

Constantly current actual condition, no dependence on object- specific service, more competitive

  • Compliance

Automatic documentation and monitoring compliance of infrastructural provisions

  • Minimize risk

Rapid detection of problems, enabling more targeted measures for rapid recovery

slide-5
SLIDE 5

AT+C Software Solutions

AT+C Facility Manager FM.7

Comprehensive tool for effective Facility Management!

AT+C Value Manager VM.7

Data Center Planning, Documentation & Operations Management

slide-6
SLIDE 6

System.7 Architecture of Platform with Functionality

AT+C a s B a s ic -P la tfo rm

O b je kte

FM.7 VM.7

Floor area Inventory Maintenance Room Bookings Contracts Costs Keys Building Technology Connectivity Racks Patch Status Work Orders Error Diagnostics Monitoring Vis u a liz a tio n / Fro n te n d

D a ta b a s e ▪ U s e r Ad m in is tra tio n ▪ Wo rkflo w s ▪ AP I ▪ In te rfa c e s

slide-7
SLIDE 7

FACILITY MANAGEMENT (SHORT)

slide-8
SLIDE 8

Mobile Application

Service & Maintenance:

  • Service and maintenance of

any technical equipment

  • Export and import

functionality for data exchange with mobile devices e.g. tablet pc

  • Asset Management and

inventory of components via barcode and RFID scanner

  • Maintenance: saving test and

maintenance data on-site

  • Documentation according to

audit proof property valuation

slide-9
SLIDE 9

Tools and devices for easy data collection

  • Automatically data collection from

technical drawings

  • Group importing from AutoCAD
  • Importing of attributes from

AutoCAD

  • Task-functionality: import from

texts documents, Excel, Access, etc.

  • Individual symbols
  • Automatically detection of outlines

e.g. room outlines

  • Automatically numbering of e.g.

rooms with real-time verification of unique identifier

  • Scanning of barcodes:
  • Scanning of RFID:

Minimized workload during data collection!

slide-10
SLIDE 10

Basic principle: objects and symbols

Positioning of components:

  • Every component with

connectivity can be placed as a symbol on the floor plan

  • Each component has pre-

defined attributes and master data

  • Valid connections are pre-

defined for each component

Uniqueness: Grafics and data is permanently linked – no inconsistence!

slide-11
SLIDE 11

DATA CENTER SOLUTIONS - DCIM/AIM

slide-12
SLIDE 12

Concepts

CAD Visualization

DCIM

Analysis

Datenbases

Management View Technical View

slide-13
SLIDE 13

Management View / KPIs

Rack Units free Slots Weight Total Heat Output Total Electric Input Rack Units reserved DC-Space used DC-Space free PUE Management of all SMNP components: Status and Documentation of port status (RFID) Facility Asset Management (RFID)

slide-14
SLIDE 14

Objects & Symbols

Positioning devices:

 All equipment to be connected will be placed as a symbol into the floor plan  Each device is associated with master data  For each device - allowed connections are pre-defined  You can create generic devices by your own  Intelligent Devices (SNMP)

Power Cooling…

slide-15
SLIDE 15

VM.7 – Data Center Floor Plan

Visualizing of…

For example:

  • Free Ports: Copper / FO

per Racks / Rack Row etc.

  • Channels / Connections
  • Free Slots in blocks
  • Occupied space based on

classifications plus any criteria for DB searches

slide-16
SLIDE 16

Cable routes within your Data Center

Find

  • Optimized Cable routing
  • Tray utilization
  • Connections
  • Fireload of Tray
  • Only allowed cables
slide-17
SLIDE 17

VM.7 VisiRack: Visualize Racks / Inventory

Manage Rack Devices

  • Large symbol library to easily

manage rack equipment inventory

  • Each device is associated

with master data

  • For each device - allowed

connections are pre-defined

  • Interfaces for different PDU‘s
slide-18
SLIDE 18

Realtime Rack Management with SNMP Integration

Realtime Status Information

  • Total power consumption
  • Heat / cooling requirements
  • Free Rack Units (RU)
  • Free coherent RU‘s
  • Any summation
  • Capacity constraints in the

future

  • Planning mode
  • Free Ports on devices
slide-19
SLIDE 19

IT-Security - ISO 27001

IT-Security needs certainty.

Who knows the current status ?

slide-20
SLIDE 20

Can you answer these questions without documentation?

IT-Security

  • Which computers hanging in a particular network segment ?
  • Where are devices of a certain type / with a certain version status ?
  • Which employee had executed last change orders on a particular rack ?
  • Which networks are accessible from a patch panel from ?

Reliability

  • Are my critical connections really fully redundant ?
  • Which devices would be affected by the failure of a phase ?
slide-21
SLIDE 21

Potential threat

The greatest risks to IT security come from within !

slide-22
SLIDE 22

Even safer: self documenting changes

AIM – Automated Infrastructure Management

  • AIM hardware detects when patch cables

are plugged in or removed, usually via RFID sensor.

  • For scheduled connections to be wired or

dissolving ports are optically signaled.

  • Unscheduled changes (as well as the raising
  • f an RFID-cap) generate an alarm message
slide-23
SLIDE 23

VisiRack: PatchManager

PatchManager:

  • Easy to connect
  • Sides:

a – a / a – b b – b / b – a

  • Visualizing connection to end

device

  • Choose your patch media
  • Automated patching
  • Choose your objects by list or

graphically

  • Excel-Interface
slide-24
SLIDE 24

VisiRack: ATC-FuturePatch (via RFID) Reporting / Workorder

slide-25
SLIDE 25

Planning Mode

Planning mode

  • .. for all plans
  • .. For all objects,

connections

slide-26
SLIDE 26

Workorders

Workorders:

  • Changes made in planning

mode can be sent into a work order

  • Monitoring of actions via

web application

  • Permanent monitoring of

planned and / or completed installations.

slide-27
SLIDE 27

Reports

Standard Reports:

  • Standard reports
  • Templates
  • Create custom reports on

any database content

  • Can be integrated in data

warehouse solutions and made accessible for other reporting tools

Space Report Space Usage cabinet utilization Datacenter Report Alteration

slide-28
SLIDE 28

History on all Objects

What has changed?

  • Which Attribute?
  • What time?
  • By whom?
  • Shows old & new value
slide-29
SLIDE 29

VM.7 WEB BROWSER FRONTEND

slide-30
SLIDE 30

VM.7 Internet Graphic Server (1)

AT+C Web Application:

  • Searching any Objects
  • Edit Attributes of Objetcs
  • Show Connections
  • File Export, e.g. Excel, Word,

Visio, CAD Drawings (DXF/DWG), etc

slide-31
SLIDE 31

VM.7 Internet Graphic Server (2) – VisiRack Web

AT+C Web Application :

  • Search IT / TK-Racks
  • Display/Edit Attributes
  • Add/Delete Devices
  • Add/Delete Connections
  • File Export, e.g. Excel, Word
slide-32
SLIDE 32

Reduced and clearly designed version for tablets

AT+C Mobile Application:

 Show all connectivity connections  Data collection – e.g. for inventory  Show work orders  Execution and documentation of change

  • rders
slide-33
SLIDE 33

VM.7 ADMINISTRATION

slide-34
SLIDE 34

User Rights

Administration of user rights:

 employees / groups  objects  classes  tables  read, write, change, ...

slide-35
SLIDE 35

Integration of existing database

SQL-Assistent:

 Using drag&drop to select data fields  Options for filtering and sorting  Automatically linking of relational tables  Automatically file generation of the SQL - status

The easy and fast integration of existing databases reduces manually work load and eliminates inconsistences – leads to up-to-date data always!

slide-36
SLIDE 36

Interfaces

Existing interfaces to:

 Network management  Phone systems  Commercial systems – e.g. ERP systems  Central building control systems  Open API for the implementation of third party applications

Central Building Control Systems Office Applications Commercial Systems Network Management

slide-37
SLIDE 37

Modules

Interface to SAP:

 Data exchange  „Batch input“  Configurable