IESOTP 296-4b Treatment of Confidential Information Related to Reliability Based Power System Studies & Transmission Service Charges Technical Panel April 26, 2016 Agenda What is the issue? What is our proposal? Stakeholder


slide-1
SLIDE 1

Treatment of Confidential Information

Related to Reliability Based Power System Studies & Transmission Service Charges Technical Panel April 26, 2016 IESOTP 296-4b

slide-2
SLIDE 2
  • What is the issue?
  • What is our proposal?
  • Stakeholder engagement
  • Next steps

Agenda

2

slide-3
SLIDE 3
  • Basecase model (electrical representation of the

grid) is, and must remain, confidential

  • Stakeholders require basecase data to design

and/or ensure that their facility operates reliably

  • Market rules dealing with confidentiality and

the IESO Confidentiality Catalogue present some challenges in providing basecase model to those that need it, namely:

– Connection Applicants and Market Participants – Transmitters

Issue

3

slide-4
SLIDE 4
  • Improve efficiency in distributing the basecase

by eliminating the need for:

– notification when giving the model to transmitters; and – asking permission of all market participants and await response each time; before we release the model to consultants

  • We will still protect confidentiality of

information through the requirement of a use specific Non-Disclosure Agreement (NDA)

Proposal

4

slide-5
SLIDE 5
  • Communication was sent to all stakeholders re proposed

changes – IESO received one comment:

– Amenable to signing NDAs – Can the basecase be shared by the consultant?

  • The proposed market rule changes will suggest that:

– The basecase cannot be given to other entities, individuals or

  • rganizations as per the NDA

– The basecase is to be used for the stated purpose in the NDA and must be destroyed afterwards – Results from the basecase can be provided to others but cannot include the basecase

Stakeholder Engagement

5

slide-6
SLIDE 6
  • April 26: Seek direction from Technical Panel

that this proposal warrants consideration and that the proposed rule changes should be posted for broader stakeholder comment

  • May 31: Review stakeholder comments on

proposed rule changes and seek advice from Technical Panel to recommend to the IESO Board

  • June 15: Request for IESO Board to consider

proposed rule change

Summary and Next Steps