Industrial Storm Water Industrial Storm Water Permit Program - - PowerPoint PPT Presentation

industrial storm water industrial storm water permit
SMART_READER_LITE
LIVE PREVIEW

Industrial Storm Water Industrial Storm Water Permit Program - - PowerPoint PPT Presentation

Industrial Storm Water Industrial Storm Water Permit Program Permit Program Presented by Presented by Ryan Blazic Ryan Blazic DNRE Gaylord Field Office DNRE Gaylord Field Office 989- -705 705- -3420 3420 989 Overview Overview I.


slide-1
SLIDE 1

Industrial Storm Water Industrial Storm Water Permit Program Permit Program

Presented by Presented by Ryan Blazic Ryan Blazic DNRE Gaylord Field Office DNRE Gaylord Field Office 989 989-

  • 705

705-

  • 3420

3420

slide-2
SLIDE 2

Overview Overview

  • I. Regulatory Background
  • I. Regulatory Background
  • II. Who Needs Permit Coverage
  • II. Who Needs Permit Coverage
  • III. How to Apply for Coverage
  • III. How to Apply for Coverage
  • IV. Requirements of Permit
  • IV. Requirements of Permit
  • V. MDNRE Inspections
  • V. MDNRE Inspections
slide-3
SLIDE 3
  • I. Regulatory Background
  • I. Regulatory Background
  • 1948, Federal Water Pollution Control Act

1948, Federal Water Pollution Control Act

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7

Federal Clean Water Act

1972 Amendments

slide-8
SLIDE 8

Federal Clean Water Act

1972 Amendments

National Pollutant Discharge Elimination System

slide-9
SLIDE 9

Wastewater Treatment Plant Wastewater Treatment Plant

slide-10
SLIDE 10

National Urban Runoff Program National Urban Runoff Program

slide-11
SLIDE 11

Federal Clean Water Act Federal Clean Water Act

1987 Amendments 1987 Amendments Storm Water Storm Water

slide-12
SLIDE 12

Urban and Industrial Run Off

Point Source Discharges

slide-13
SLIDE 13

Federal Storm Water Federal Storm Water Regulations Regulations

  • Code of Federal Regulations

Code of Federal Regulations

  • 40 CFR 122.26

40 CFR 122.26

slide-14
SLIDE 14
  • Administer Clean Water Act

Administer Clean Water Act

  • Issue National Pollutant Discharge

Issue National Pollutant Discharge Elimination System (NPDES) permits Elimination System (NPDES) permits

State of Michigan State of Michigan DNRE DNRE

slide-15
SLIDE 15
  • II. Who Needs Permit Coverage?
  • II. Who Needs Permit Coverage?

1. 1. Standard Industrial Classification Standard Industrial Classification

2. 2. Discharge to Surface Waters of the State Discharge to Surface Waters of the State 3. 3. “ “Exposure Exposure” ”

slide-16
SLIDE 16
  • Complete List

Complete List

  • 40 CFR 122.26

40 CFR 122.26

  • DNRE Website

DNRE Website

  • Industries include

Industries include… …

Standard Industrial Classification Standard Industrial Classification

slide-17
SLIDE 17

Manufacturing Manufacturing

slide-18
SLIDE 18

Warehousing Warehousing

slide-19
SLIDE 19

Transportation Transportation

slide-20
SLIDE 20

Mining Mining

slide-21
SLIDE 21

Landfills Landfills

slide-22
SLIDE 22

Power Plants Power Plants

slide-23
SLIDE 23

Recycling Facilities Recycling Facilities

slide-24
SLIDE 24

Waste Water Treatment Plants Waste Water Treatment Plants

slide-25
SLIDE 25

Hazardous Waste Treatment, Hazardous Waste Treatment, Storage and Disposal facilities Storage and Disposal facilities

slide-26
SLIDE 26

Who needs a permit? Who needs a permit?

1. 1. Standard Industrial Classification Standard Industrial Classification

2. 2. Discharge to Surface Waters of Discharge to Surface Waters of the State the State

3. 3. “ “Exposure Exposure” ”

slide-27
SLIDE 27

Surface Waters of the State Surface Waters of the State

  • Rivers, lakes, streams, and wetlands

Rivers, lakes, streams, and wetlands

slide-28
SLIDE 28

Point Source Discharges Point Source Discharges

Pipe Pipe Ditch Ditch Channel Channel

slide-29
SLIDE 29

Point Source Discharges Point Source Discharges

Conduit Conduit Conveyance Conveyance Tunnel Tunnel

slide-30
SLIDE 30

Grading Grading

slide-31
SLIDE 31

Receiving waters receive the point Receiving waters receive the point source discharge source discharge

slide-32
SLIDE 32

Municipal Storm Sewer System Municipal Storm Sewer System

Separate or combined? Separate or combined?

slide-33
SLIDE 33

Separate Sewer System Separate Sewer System

WWTP WWTP

  • Storm Sewer

Storm Sewer

  • Sanitary Sewer

Sanitary Sewer

slide-34
SLIDE 34

Combined Sewer System Combined Sewer System

WWTP WWTP

  • Storm Sewer

Storm Sewer

  • Sanitary Sewer

Sanitary Sewer

slide-35
SLIDE 35

Who needs a permit? Who needs a permit?

1. 1. Standard Industrial Classification Standard Industrial Classification 2. 2. Discharge to Surface Waters of the State Discharge to Surface Waters of the State

3. 3. “ “Exposure Exposure” ”

slide-36
SLIDE 36

Material Handling Material Handling

slide-37
SLIDE 37

Equipment / Machinery Equipment / Machinery

slide-38
SLIDE 38

Raw Materials Raw Materials

slide-39
SLIDE 39

Intermediate Products and Byproducts Intermediate Products and Byproducts

slide-40
SLIDE 40

Waste Materials Waste Materials

slide-41
SLIDE 41

Finished products designed for outdoor use Finished products designed for outdoor use are not considered are not considered “ “exposure exposure” ”. .

slide-42
SLIDE 42

No Exposure of Industrial Materials No Exposure of Industrial Materials

slide-43
SLIDE 43

No Exposure Certification Form No Exposure Certification Form

slide-44
SLIDE 44

No exposure form must be No exposure form must be submitted every submitted every 5 years 5 years

slide-45
SLIDE 45
slide-46
SLIDE 46

Summary Summary

Standard Industrial Classification Standard Industrial Classification By

By SIC code and narrative description SIC code and narrative description

Point source discharge to surface Point source discharge to surface waters of the state waters of the state Exposure of industrial materials to Exposure of industrial materials to storm water storm water

slide-47
SLIDE 47
  • III. How to apply for
  • III. How to apply for

storm water discharge storm water discharge permit coverage permit coverage

slide-48
SLIDE 48

Types of Coverage Types of Coverage

Integrated into current NPDES Permit Integrated into current NPDES Permit General Permit General Permit General Permit with Monitoring General Permit with Monitoring

slide-49
SLIDE 49

For new facilities For new facilities

1.

  • 1. Obtain an industrial storm water certified

Obtain an industrial storm water certified

  • perator
  • perator

2.

  • 2. Develop a Storm Water Pollution Prevention

Develop a Storm Water Pollution Prevention Plan Plan 3.

  • 3. Ensure there are no illicit discharges

Ensure there are no illicit discharges

slide-50
SLIDE 50

Obtain an industrial Obtain an industrial storm water storm water certified operator certified operator

slide-51
SLIDE 51

Develop a Storm Water Pollution Develop a Storm Water Pollution Prevention Plan Prevention Plan

slide-52
SLIDE 52

Certify that there are no illicit Certify that there are no illicit discharges discharges

slide-53
SLIDE 53

For existing facilities For existing facilities

Sign a Certificate of Entry (COE) Sign a Certificate of Entry (COE) Permit applicant must pay a fine Permit applicant must pay a fine equivalent to 2x the annual permit fee and equivalent to 2x the annual permit fee and the annual permit fee (currently the annual permit fee (currently $520+ 260) $520+ 260)

slide-54
SLIDE 54

After signing the After signing the Certificate of Entry Certificate of Entry within 60 days

within 60 days 1.

  • 1. Obtain an industrial storm water certified

Obtain an industrial storm water certified

  • perator
  • perator

2.

  • 2. Develop a Storm Water Pollution Prevention

Develop a Storm Water Pollution Prevention Plan Plan 3.

  • 3. Implement the Storm Water Pollution

Implement the Storm Water Pollution Prevention Plan Prevention Plan 4.

  • 4. Certify that there are no illicit discharges

Certify that there are no illicit discharges

slide-55
SLIDE 55

Storm Water Permit NOI Storm Water Permit NOI

slide-56
SLIDE 56

Signing the application certifies that the Permit Signing the application certifies that the Permit Requirements have been completed Requirements have been completed

slide-57
SLIDE 57
  • IV. Permit Requirements
  • IV. Permit Requirements
slide-58
SLIDE 58

Meeting SWPPP Requirements Meeting SWPPP Requirements

  • Source Identification

Source Identification

– – Site Map Site Map

  • Non

Non-

  • Structural Controls Requirements

Structural Controls Requirements

  • Structural Controls Requirements

Structural Controls Requirements

  • Keeping Plans Current

Keeping Plans Current

  • Certified Operator Update

Certified Operator Update

  • Signature and Plan Review

Signature and Plan Review

slide-59
SLIDE 59

Clean pallets Plastic Pellet Hopper in secondary containment

Material Handling & Loading / Unloading Area Material Handling & Loading / Unloading Area Double Walled Diesel and Gasoline Tanks Fuel Island with curbing

2 Covered 20 yrd roll-off dumpsters Crystal Clear Creek

slide-60
SLIDE 60

Other Requirements Other Requirements

slide-61
SLIDE 61

Keep records for Keep records for three years three years

slide-62
SLIDE 62

Records Retention Records Retention

1. 1. Inspection Reports Inspection Reports 2. 2. Employee Training Documentation Employee Training Documentation 3. 3. Spills Spills 4. 4. Annual reports Annual reports

slide-63
SLIDE 63

Receiving waters shall not have any Receiving waters shall not have any unnatural unnatural physical physical properties as a result of the discharge properties as a result of the discharge

slide-64
SLIDE 64

Injurious to fish Injurious to fish

Fish kill Fish kill

slide-65
SLIDE 65

Unnatural Turbidity Unnatural Turbidity

slide-66
SLIDE 66

Unnatural Color Unnatural Color

slide-67
SLIDE 67

Unnatural Unnatural Oil Film Oil Film

slide-68
SLIDE 68

Noncompliance Noncompliance

Floating Solids Floating Solids

  • Ryan(oil

Ryan(oil picture) and picture) and Mindy(plastic Mindy(plastic pellets) pellets)

Unnatural Flo Unnatural Floating Solids ating Solids

slide-69
SLIDE 69

Unnatural Unnatural Foams Foams

slide-70
SLIDE 70

Unnatural Unnatural Settleable Settleable Solids Solids

slide-71
SLIDE 71

Unnatural Unnatural Suspended Solids Suspended Solids

slide-72
SLIDE 72

Unnatural Unnatural Deposits as a Deposits as a result of the discharge result of the discharge

slide-73
SLIDE 73

Unnatural Color Unnatural Color

slide-74
SLIDE 74

Reporting Reporting

slide-75
SLIDE 75

Spill Reporting Spill Reporting

  • 24

24-

  • Hour Reporting

Hour Reporting

  • Endangers Human

Endangers Human Health or the Health or the Environment Environment

  • Other Reporting

Other Reporting

  • Written Reporting

Written Reporting

slide-76
SLIDE 76

Spill Notification Spill Notification

Business hours call the MDNRE District Office Business hours call the MDNRE District Office Do not leave a voice mail message Do not leave a voice mail message After hours call After hours call MDNRE MDNRE’ ’s s 24 hour emergency 24 hour emergency response telephone number response telephone number 1 1-

  • 800

800-

  • 292

292-

  • 4706

4706

slide-77
SLIDE 77
  • V. MDNRE Inspections
  • V. MDNRE Inspections
slide-78
SLIDE 78

1) Indoor and outdoor facility tour 1) Indoor and outdoor facility tour

slide-79
SLIDE 79

2) SWPPP and storm water 2) SWPPP and storm water program file audit program file audit

slide-80
SLIDE 80

Along with the SWPPP the following Along with the SWPPP the following paperwork is reviewed: paperwork is reviewed:

  • All inspection reports

All inspection reports

  • Preventative maintenance

Preventative maintenance reports reports

  • Annual SWPPP reviews

Annual SWPPP reviews

slide-81
SLIDE 81

Paperwork Paperwork “ “continued continued” ”

  • Employee training

Employee training logs logs

  • Spill reports

Spill reports

  • And any other

And any other pertinent documents pertinent documents

slide-82
SLIDE 82

Non Non-

  • storm water discharges

storm water discharges

slide-83
SLIDE 83

Focus on areas that impact the Focus on areas that impact the storm water discharge storm water discharge

slide-84
SLIDE 84

Evaluation will be conducted at the Evaluation will be conducted at the following areas: following areas:

Loading, unloading, and other material handling Loading, unloading, and other material handling areas areas

slide-85
SLIDE 85

Outdoor and indoor industrial material storage Outdoor and indoor industrial material storage areas areas

slide-86
SLIDE 86

Outdoor manufacturing and process areas Outdoor manufacturing and process areas

slide-87
SLIDE 87

Discharge areas for vents, stacks, and other Discharge areas for vents, stacks, and other emission controls emission controls

slide-88
SLIDE 88

On On-

  • site waste disposal areas

site waste disposal areas

slide-89
SLIDE 89

Maintenance and cleaning areas for vehicles, Maintenance and cleaning areas for vehicles, machines, and equipment machines, and equipment

slide-90
SLIDE 90

Areas of exposed and / or erodible soils Areas of exposed and / or erodible soils

slide-91
SLIDE 91

Point source discharge to the surface waters Point source discharge to the surface waters

slide-92
SLIDE 92

Structural controls Structural controls

slide-93
SLIDE 93

Internal floor drains Internal floor drains

slide-94
SLIDE 94

Observations will be discussed Observations will be discussed during the closing meeting during the closing meeting

slide-95
SLIDE 95

Once the inspection is complete Once the inspection is complete… …

  • The DNRE inspector will issue a letter

The DNRE inspector will issue a letter

  • A written response will generally be

A written response will generally be required by the facility required by the facility

slide-96
SLIDE 96

Industrial Storm Water Resources Industrial Storm Water Resources

  • Contact your local MDNRE District Office

Contact your local MDNRE District Office Storm Water Staff Storm Water Staff

  • Loacate

Loacate the storm water web page on the MDNRE web the storm water web page on the MDNRE web site.

  • site. http://www.michigan.gov/dnre

http://www.michigan.gov/dnre

– – Guidance Documents Guidance Documents – – General Permits General Permits – – Application Application – – Operator Certification Info Operator Certification Info

  • Call Mr. Mark Fife, Industrial Storm Water Program

Call Mr. Mark Fife, Industrial Storm Water Program Coordinator (517) 241 Coordinator (517) 241-

  • 8993

8993

slide-97
SLIDE 97

Any Questions? Any Questions?