Improved Approaches to Site Finding Jerry Randall – jerry@wind-pioneers.com Wind Pioneers Engineering Ltd. | UK registered company 10272203 | www.wind-pioneers.com Engineering Office: #5, 39/1, 7 th Main, Indiranagar, Bangalore, 560038, India
Introduction Wind Pioneers is a new venture with a new business model to bring highly innovative, flexible and cost- effective technical services to wind farm developers.
Introduction Wind analyses from site finding to energy assessments… Wind Pioneers is a new venture with a new business model to bring highly innovative, flexible and cost- effective technical services to wind farm developers.
Why Two sites, identical except for wind resource SITE A SITE B • 7.0 m/s • 6.5 m/s • 33.5% PLF • 29% PLF Huge additional value and profitability for Site B at no extra cost
Current Weakness Map predicts highest wind Highest wind will be in shadow of mountain at top of mountain
Current Weakness Wind Map Accuracy: >0.5m/s @ 50% sites Insufficient alone
A New Approach STEP 1 Characterise a perfect site STEP 2 Find sites matching characterisation
A New Approach What is a Inputs perfect site? • Good exposure • Moderate terrain Prevailing Winds • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability AND • Windy
Good Exposure What is a perfect site? • Good exposure • Moderate terrain • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability AND Distance to higher land • Windy
Moderate Terrain What is a perfect site? • Good exposure • Moderate terrain • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability Slopes > 17 ° AND • Windy
Speedups What is a perfect site? • Good exposure • Moderate terrain • Speedups • Ridges ∟ to wind • Highway Access Height gain • Grid Access • Land Availability AND • Windy
Ridges ∟ to Wind What is a perfect site? • Good exposure • Moderate terrain • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability AND Wind roses • Windy
Highway Access What is a perfect site? • Good exposure • Moderate terrain • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability AND Distance to Roads • Windy
Grid Access What is a perfect site? • Good exposure Closest Substation • Moderate terrain • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability AND • Windy
Land Availability What is a perfect site? • Good exposure Protected Forest • Moderate terrain • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability AND • Windy
Windy What is a Combine multiple meso maps to reduce errors perfect site? • Good exposure • Moderate terrain + • Speedups • Ridges ∟ to wind • Highway Access • Grid Access • Land Availability AND • Windy
Multiple Development Constraints • Highway < 20km • Rivers > 1km • Terrain < 20 deg slope • National Parks excluded • Forestry excluded • Agricultural land use • Within 1 province • Airports > 20km • Substations < 20 km • Urban Areas > 10km • Habitations > 1km Map of Buildable Areas • Neighbouring Wind Farms > 5km
Site Scoring How Perfect is That Site?
Conclusion • Find better sites • Find different sites to your competitors • Save costs on unviable sites
Improved Approaches to Site Finding Jerry Randall – jerry@wind-pioneers.com Wind Pioneers Engineering Ltd. | UK registered company 10272203 | www.wind-pioneers.com Engineering Office: #5, 39/1, 7 th Main, Indiranagar, Bangalore, 560038, India