“IF IT AIN’T BROKE...”
AND OTHER SAFETY LESSONS Kendra Schenk, PE, PTOE, RSP
IF IT AINT BROKE... AND OTHER SAFETY LESSONS Kendra Schenk, PE, - - PowerPoint PPT Presentation
IF IT AINT BROKE... AND OTHER SAFETY LESSONS Kendra Schenk, PE, PTOE, RSP Safety Lessons If i f it t aint aint br broke, d dont f fix ix it it Rul ules es a are e made t de to o be br brok oken Get yo
AND OTHER SAFETY LESSONS Kendra Schenk, PE, PTOE, RSP
ALTERNATIVE 4 – PARCLO
2015 – 2017 2 Fixed Object Crashes 1 Backing Crash 0 Injuries
be based on data
NORTH
Gemini Parkway
EXISTING 74’ ALTERNATIVE 1 80’ ALTERNATIVE 2 74’ ALTERNATIVE 3 74’
PREDICTED CRASH FREQUENCY How the site/location should perform EXPECTED CRASH FREQUENCY How the site/location is actually performing Class Average Grade of Individual Student
6.87 26.90 31.81 134.05 199.63 5.87 23.64 27.59 96.18 153.29 5.97 23.98 27.96 96.74 154.65 6.02 24.13 28.13 97.91 156.19 50 100 150 200 250 KA B C O Total Crash Frequency (Crashes per Year) Existing Alt 1 Alt 2 Alt 3
Alternative 1 Alternative 2 Alternative 3 Fatal and Serious Injury
Injury
Total Crashes
Construction Costs $7.44 M $5.48 M $5.48 M Safety B/C 2.07 2.61 2.49
ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3
widths
ALTERNATIVE 2 PREFERRED ALTERNATIVE
In the past, designers sought to assure good traffic operational and safety performance for the design of specific projects primarily by meeting the dimensional design criteria in this policy. This approach was appropriate in the past because the relationship between the design dimensions and future performance was poorly understood. Traditional applications of this policy took the approach that, if the geometric design of a project met or exceeded specific design dimensional design criteria, it would likely to perform well. In some cases, this may have led to overdesign, constructing projects that were more costly than they needed to be, or were inappropriate for the roadway context.
it’s “safe”
5.5 mile segment
6
86 Crashes between January 1, 2012 to December 31, 2016
HSM Analysis for Existing Conditions – 2018 through 2037 HSM Analysis Comparison– 2018 through 2037
Spot Improvement 1 1.8 mile segment
Spot Improvement 5 0.9 mile segment
HSM Analysis for Existing Conditions – 2018 through 2037
HSM Analysis Comparison– 2018 through 2037
64% of the Benefit 57% of the Cost COST SAVINGS
improvements or overall projects
Kendra Schenk, PE, PTOE, RSP 614-459-2050 Kendra.Schenk@BurgessNiple.com