I-5 North Coast Corridor Project Phase 1 (CM/GC) Flatiron-Skanska-Stacy and Witbeck (FSSW) FSSW Joint Venture is comprised of nationally recognized contractors: Flatiron West, Inc. Skanska USA Civil West California District Inc.
Flatiron-Skanska-Stacy and Witbeck (FSSW)
FSSW Joint Venture is comprised of nationally recognized contractors:
- Flatiron West, Inc.
- Skanska USA Civil West California District Inc.
- Stacy and Witbeck, Inc.
Flatiron-Skanska-Stacy and Witbeck (FSSW)
- Local Contractors
- Leading CMGC experienced firms
- Significant CALTRANS and SANDAG contracting experience
- Dedicated to supporting small, local and minority business
North Coast Corridor Project Overview
- 14 Miles of HOV between L. Santa Fe and Hwy 78
- New Sound and Retaining Walls
- Bridge Reconstruction
- Pavement Widening and Reconstruction
- 4 Miles of LOSSAN Double Track
- Rail Bridge replacement
- Lagoon Enhancement
5
NCC PHASE 1
- CM/GC team selected based on qualifications and experience
- CM/GC consults with Owner during the design phase
- CM/GC evaluates costs, schedule and constructability
- Multiple segment GMPs issued for bid
What is CM/GC
Minority Goals
- I-5 Highway and Lagoon Work: DBE Goal for Pre-Construction
Services: 5.1 percent
- LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent
- DBE Goals for Construction Services will be determined near
completion of Pre-Construction Services
Potential Opportunities Construction Phase
- Articulated Concrete Block
- GRE Wall Materials
- Quality Control
- Asphalt Paving
- Grind Existing Concrete Pavement
- Railroad Signals
- Biological Monitoring
- Ground Anchors and Soil Nails
- Railroad Track Materials
- Bridge Concrete Barrier
- Guardrail
- Reinforcing Steel
- Bridge Demolition
- Habitat Restoration
- Revegetation and Planting
- Channel Lining
- Hydrographic Surveys
- Rip Rap
- CIDH Pile
- Jack and Bore
- Roadside Signs
- Clear and Grub
- Joint Seal
- Roadway Concrete Barrier
- Cold Plane Asphalt
- Landscape and Irrigation
- Shotcrete
- Concrete Supply
- Masonry
- Slope Protection
- Construction Area Signs
- Minor Concrete
- Striping
- Driven Pile
- Miscellaneous Metal
- Survey
- Electrical
- Miscellaneous Iron and Steel
- SWPPP
- Environmental Compliance Officer
- Overhead Signs
- Transparent Soundwalls
- Erosion Control
- Pipe Supply
Assistance to DBE/UDBE/SBE Firms
- FSSW is committed to helping Caltrans and SANDAG meet/exceed its
- verall U/DBE goals
- Work packages will be broken down into economically feasible portions of
work
- FSSW is available to assist subcontractors in obtaining bonding, lines of
credit, and insurance as required
- Project website to facilitate communication of project opportunities and
events
PROJECT WEBSITE – i5northcoast.com