I-5 North Coast Corridor Project Phase 1 (CM/GC) Flatiron-Skanska-Stacy and Witbeck (FSSW) FSSW Joint Venture is comprised of nationally recognized contractors: Flatiron West, Inc. Skanska USA Civil West California District Inc.


slide-1
SLIDE 1

I-5 North Coast Corridor Project Phase 1 (CM/GC)

slide-2
SLIDE 2

Flatiron-Skanska-Stacy and Witbeck (FSSW)

FSSW Joint Venture is comprised of nationally recognized contractors:

  • Flatiron West, Inc.
  • Skanska USA Civil West California District Inc.
  • Stacy and Witbeck, Inc.
slide-3
SLIDE 3

Flatiron-Skanska-Stacy and Witbeck (FSSW)

  • Local Contractors
  • Leading CMGC experienced firms
  • Significant CALTRANS and SANDAG contracting experience
  • Dedicated to supporting small, local and minority business
slide-4
SLIDE 4

North Coast Corridor Project Overview

  • 14 Miles of HOV between L. Santa Fe and Hwy 78
  • New Sound and Retaining Walls
  • Bridge Reconstruction
  • Pavement Widening and Reconstruction
  • 4 Miles of LOSSAN Double Track
  • Rail Bridge replacement
  • Lagoon Enhancement
slide-5
SLIDE 5

5

NCC PHASE 1

slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
  • CM/GC team selected based on qualifications and experience
  • CM/GC consults with Owner during the design phase
  • CM/GC evaluates costs, schedule and constructability
  • Multiple segment GMPs issued for bid

What is CM/GC

slide-14
SLIDE 14

Minority Goals

  • I-5 Highway and Lagoon Work: DBE Goal for Pre-Construction

Services: 5.1 percent

  • LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent
  • DBE Goals for Construction Services will be determined near

completion of Pre-Construction Services

slide-15
SLIDE 15

Potential Opportunities Construction Phase

  • Articulated Concrete Block
  • GRE Wall Materials
  • Quality Control
  • Asphalt Paving
  • Grind Existing Concrete Pavement
  • Railroad Signals
  • Biological Monitoring
  • Ground Anchors and Soil Nails
  • Railroad Track Materials
  • Bridge Concrete Barrier
  • Guardrail
  • Reinforcing Steel
  • Bridge Demolition
  • Habitat Restoration
  • Revegetation and Planting
  • Channel Lining
  • Hydrographic Surveys
  • Rip Rap
  • CIDH Pile
  • Jack and Bore
  • Roadside Signs
  • Clear and Grub
  • Joint Seal
  • Roadway Concrete Barrier
  • Cold Plane Asphalt
  • Landscape and Irrigation
  • Shotcrete
  • Concrete Supply
  • Masonry
  • Slope Protection
  • Construction Area Signs
  • Minor Concrete
  • Striping
  • Driven Pile
  • Miscellaneous Metal
  • Survey
  • Electrical
  • Miscellaneous Iron and Steel
  • SWPPP
  • Environmental Compliance Officer
  • Overhead Signs
  • Transparent Soundwalls
  • Erosion Control
  • Pipe Supply
slide-16
SLIDE 16

Assistance to DBE/UDBE/SBE Firms

  • FSSW is committed to helping Caltrans and SANDAG meet/exceed its
  • verall U/DBE goals
  • Work packages will be broken down into economically feasible portions of

work

  • FSSW is available to assist subcontractors in obtaining bonding, lines of

credit, and insurance as required

  • Project website to facilitate communication of project opportunities and

events

slide-17
SLIDE 17

PROJECT WEBSITE – i5northcoast.com

slide-18
SLIDE 18

REGISTER ON THE WEBSITE TO STAY INFORMED

slide-19
SLIDE 19

DBE RESOURCES AND WORKSHOPS

slide-20
SLIDE 20

Contact Information

Flatiron-Skanska-Stacy and Witbeck, a Joint Venture (FSSW) 1770 La Costa Meadows Drive San Marcos, CA 92078 Email: info@i5northcoast.com Phone: (760) 916-9151 FAX: (760) 471-4860

slide-21
SLIDE 21

Questions ????