i 5 north coast corridor project phase 1 cm gc flatiron
play

I-5 North Coast Corridor Project Phase 1 (CM/GC) - PowerPoint PPT Presentation

I-5 North Coast Corridor Project Phase 1 (CM/GC) Flatiron-Skanska-Stacy and Witbeck (FSSW) FSSW Joint Venture is comprised of nationally recognized contractors: Flatiron West, Inc. Skanska USA Civil West California District Inc.


  1. I-5 North Coast Corridor Project Phase 1 (CM/GC)

  2. Flatiron-Skanska-Stacy and Witbeck (FSSW) FSSW Joint Venture is comprised of nationally recognized contractors: Flatiron West, Inc. • Skanska USA Civil West California District Inc. • Stacy and Witbeck, Inc. •

  3. Flatiron-Skanska-Stacy and Witbeck (FSSW) Local Contractors • Leading CMGC experienced firms • Significant CALTRANS and SANDAG contracting experience • Dedicated to supporting small, local and minority business •

  4. North Coast Corridor Project Overview • 14 Miles of HOV between L. Santa Fe and Hwy 78 • New Sound and Retaining Walls • Bridge Reconstruction • Pavement Widening and Reconstruction • 4 Miles of LOSSAN Double Track • Rail Bridge replacement • Lagoon Enhancement

  5. NCC PHASE 1 5

  6. What is CM/GC • CM/GC team selected based on qualifications and experience • CM/GC consults with Owner during the design phase • CM/GC evaluates costs, schedule and constructability • Multiple segment GMPs issued for bid

  7. Minority Goals • I-5 Highway and Lagoon Work: DBE Goal for Pre-Construction Services: 5.1 percent • LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services will be determined near completion of Pre-Construction Services

  8. Potential Opportunities Construction Phase • Articulated Concrete Block • GRE Wall Materials • Quality Control • Asphalt Paving • Grind Existing Concrete Pavement • Railroad Signals • Ground Anchors and Soil Nails • Railroad Track Materials • Biological Monitoring • Bridge Concrete Barrier • Guardrail • Reinforcing Steel • Bridge Demolition • Habitat Restoration • Revegetation and Planting • Channel Lining • Rip Rap • Hydrographic Surveys • CIDH Pile • Roadside Signs • Jack and Bore • Clear and Grub • Joint Seal • Roadway Concrete Barrier • Cold Plane Asphalt • Landscape and Irrigation • Shotcrete • Concrete Supply • Masonry • Slope Protection • Construction Area Signs • Minor Concrete • Striping • Driven Pile • Miscellaneous Metal • Survey • Miscellaneous Iron and Steel • Electrical • SWPPP • Environmental Compliance Officer • Overhead Signs • Transparent Soundwalls • Erosion Control • Pipe Supply

  9. Assistance to DBE/UDBE/SBE Firms FSSW is committed to helping Caltrans and SANDAG meet/exceed its • overall U/DBE goals Work packages will be broken down into economically feasible portions of • work FSSW is available to assist subcontractors in obtaining bonding, lines of • credit, and insurance as required Project website to facilitate communication of project opportunities and • events

  10. PROJECT WEBSITE – i5northcoast.com

  11. REGISTER ON THE WEBSITE TO STAY INFORMED

  12. DBE RESOURCES AND WORKSHOPS

  13. Contact Information Flatiron-Skanska-Stacy and Witbeck, a Joint Venture (FSSW) 1770 La Costa Meadows Drive San Marcos, CA 92078 Email: info@i5northcoast.com Phone: (760) 916-9151 FAX: (760) 471-4860

  14. Questions ????

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend