SLIDE 1 TUBULAR BIOREACTOR FOR HYDROGEN SULPHIDE REMOVAL FROM GEOTHERMAL POWER STATION COOLING WATER
Rob Fullerton – Beca Ltd, New Zealand
SLIDE 2 Taupo – North Island NZ
Taupo Wairakei
SLIDE 3 Wairakei Geothermal Power Station
earliest geothermal power stations in the world
1963, installed capacity 192MW
SLIDE 4 Cooling Water System
- ~17 m3/s Waikato River water for direct condenser cooling
A Station B Station CW in CW out
CW = Cooling water
SLIDE 5 Waikato River Steam Turbines Direct contact condensers Geothermal steam 0.2m3/s 17m3/s 17.2m3/s Water pumps 157MW power Waikato River
Cooling water + condensate
Cooling Water System
SLIDE 6 The Challenge
- H2S in the geothermal steam condenses into the cooling water
and is discharged back to the river – aquatic impacts
- H2S concentration in discharge about 1000mg/m3 (~1mg/L)
- Discharge Permit: H2S discharge to river
─ Prior 2012 : No consented limit - 10,000 kg/week ─ By 20 August 2012: 2,800 kg/week (72% reduction) ─ By 20 August 2016: 630 kg/week (94% reduction)
- Requires sulphide reduction to ~50 mg/m3
SLIDE 7 Waikato River Steam Turbines Direct contact condensers Geothermal steam containing H2S 0.2m3/s 17m3/s 17.2m3/s 1000ppb H2S To be reduced to 50ppb by 2012 Cooling water 157MW power Waikato River
Cooling water + condensate
The Challenge
SLIDE 8
- Need for strategy to control sulphide recognised
- Thinking started in 2000
- SOB naturally occurring – esp. in geothermal areas
- Biological sulphide oxidation - conversion of H2S to sulphate
- SOB biofilm observed on existing outfall structure
- Cooling water from power station 30 - 35oC, pH ~6,
dissolved CO2
- Could SOB be used to achieve 95% sulphide removal?
Sulphide Oxidising Bacteria - A Solution?
SLIDE 9 Initial Pilot Trials – 2000 - 2005
Algae overgrowth
SLIDE 10
Sheets – channels - Pipes
SLIDE 11
The Eureka Moment
SOBs seem to grow best in fast moving flow
SLIDE 12 Pilot Testing – Initial pipe trials
Sulphide sampling
- Biofilm established on inside of pipe – good H2S removal
- High velocity prevents excessive biomass build-up
- Lack of light prevents algal growth
- Pipe bioreactor proved in concept
SLIDE 13
Pilot Testing 2010 100mm dia. x 200m /150mm dia. X 400m
SLIDE 14 SOB Biofilm
Beginning section 100m End section 200m
SLIDE 15
100mm dia. x 200m results
SLIDE 16
150mm dia. x 400m results
SLIDE 17 𝑒𝑇 𝑒𝑢 = −𝑤𝑛 𝑇 (𝐿𝑡 + 𝑇)
dS/dt = rate of substrate change vm = maximum substrate utilisation rate ks = half saturation constant
𝑒𝑇 𝑒𝑢 = 𝜈𝑛 𝐶 𝑍 𝑇 (𝐿𝑡 + 𝑇)
S = substrate concentration µm = maximum specific growth rate Ks = half-saturation constant B = biomass concentration Y = biomass yield
B >> S
- Sulphide concentration is low
- biofilm quasi-steady state with constant
thickness, viz. growth = detachment
Sulphide Removal Model
- Calculate removal rate for each pipe segment (gH2S/m2/d)
- Fit to non-linear least squares Monod model
SLIDE 18
vm = 13.85 gH2S/m2/d Ks = 235mg/m3
Monod curve fitting
SLIDE 19 Design Curve
Minimum pipe length ~160m +25% safety factor = 200m
SLIDE 20 Power station cooling water Inlet sulphide = 1000ppb 100mm dia. x 200m Velocity 0.8m/s Flow = 6.7L/s
Sulphide
bacteria biofilm forms on pipe inside surface Outlet sulphide < 50ppb
Pipe bioreactor - process concept
100mm
SLIDE 21
Full scale pipe bioreactor concept plant
Flow = 17m3/s ~2000 pipes x 200m in parallel
390km of pipe !! 200 x pipes per layer 10 layers
SLIDE 22 Waikato River Steam Turbines Direct contact condensers Geothermal steam + H2S 17m3/s cooling water 17.2m3/s 13m3/s 50ppb H2S Waikato River 157MW power
Proposed sulphide treatment system 2012
Pipe bioreactor
4.2m3/s 1000ppb H2S 2,800kg/week 17.2m3/s
SLIDE 23 Waikato River Steam Turbines Direct contact condensers Geothermal steam + H2S 13m3/s 13.2m3/s 1000ppb H2S Cooling water <80ppb H2S Waikato River 120MW power
Proposed sulphide treatment system 2016
Pipe bioreactor
630kg/week
SLIDE 24 Full Scale design Challenges
- Design began January 2011
- Never been done before – collaboration between contractor
and designer
- Physical constraints – high groundwater + hot (60oC)
- Power station can’t stop – build off-line
- Hydraulics – available head 1.5m – require pumping
- Energy efficiency – design low head system
- How to install 380km of 100mm dia. HDPE pipe
SLIDE 25 Innovative “over – under” syphon
- Bioreactor pipe configuration
― 1890 pipes ― 5 banks of 378 pipes ― 42 pipes x 9 layers ― Magnetic flow meter each bank 100m
SLIDE 26
Bioreactor Layout
SLIDE 27
Site Overview December 2011
SLIDE 28 Construction of pipe field
─ Extruded on site ─ 100m lengths ─ No joints ─ 2.5mm wall ─ Embedded into weak cement matrix – “soilcrete” ─ 378km in 5 months
SLIDE 29
Construction of pipe field
SLIDE 30 Construction of pipe field
Soilcrete embedment made from local pumice sand
SLIDE 31
Construction of pipe field
SLIDE 32 Construction of pipe field
Return chamber – end pipe field
SLIDE 33
Pump inlet channel
SLIDE 34
Bioreactor outlet channel
SLIDE 35
Bypass weir
SLIDE 36
Bioreactor Performance
SLIDE 37
Permit Compliance
SLIDE 38 Full scale performance
- H2S concentration meeting target of >80% (~50mg/m3)
- Power station meeting sulphide mass emission limit of
2,800 kg H2S/week
- Optimisation of operating conditions to minimise power
consumption
- Current performance gives confidence to meet 2016
discharge limit of 630 kg H2S/week
SLIDE 39
The world’s largest tubular bioreactor