hvdc underground cables
play

HVDC Underground Cables The Empire Connection Paul M Grant, Ph.D. - PowerPoint PPT Presentation

HVDC Underground Cables The Empire Connection Paul M Grant, Ph.D. Physicist & Writer, Principal W2AGZ Technologies Paul M. Grant Energy Science & Technology Consulting Science Fellow EPRI w2agz@pacbell.net www.w2agz.com P. M.


  1. HVDC Underground Cables The Empire Connection Paul M Grant, Ph.D. Physicist & Writer, Principal W2AGZ Technologies Paul M. Grant Energy Science & Technology Consulting Science Fellow EPRI w2agz@pacbell.net www.w2agz.com P. M. Grant Albany, NY, 2/10/04

  2. P. M. Grant Albany, NY, 2/10/04

  3. Sending Receiving End End DC Line Rectifier Inverter R Transformer V dc I dc FILTER FILTER Capacitor Filter i i i I dc I ac I ac t t t P. M. Grant Albany, NY, 2/10/04

  4. P. M. Grant Albany, NY, 2/10/04

  5. P. M. Grant Albany, NY, 2/10/04

  6. P. M. Grant Albany, NY, 2/10/04

  7. P. M. Grant Albany, NY, 2/10/04

  8. P. M. Grant Albany, NY, 2/10/04

  9. www.empireconnection.com Total Capacity 2000 MW DC P. M. Grant Albany, NY, 2/10/04

  10. Bipole 1 - 1000 MW Lines / Substation 1 Substation 2 Cables 500 kV F F F F F F F F Pole 1 F 500 MW HVDC Circuit Details as Substation 1 Pole 2 F 500 MW F F F F F F F F Bipole 2 - 1000 MW Lines / Substation 1 Substation 2 Cables 500 kV F F F F F F F F Pole 1 F 500 MW HVDC Circuit Details as Substation 1 Pole 2 F 500 MW F F F F F F F F P. M. Grant Albany, NY, 2/10/04

  11. Marcy New Alps Edic Scotland Fraser Gilboa (15.9 m) Coeymans Athens Leeds Athens (117.5 m) Long (117.5 m) Mountain Pleasant Valley Hurley Circuit #2: 1,000 MW, +/- 500 KV HVDC Circuit #1: 1,000 MW, +/- 500 KV HVDC Roseton Rock Tavern FishKill Buchanan S Millwood Buchanan N SprainBrook Dunwoodie Oak Point Tremont (8.3 m) Spuyten (4.4 m) Rainey (9.0 m) Duyvil West 49 th Street Astoria 15 th Street Farragut Empire Connection & UPNY/SENY 345 KV Transmission Grid November 5, 2003 P. M. Grant Albany, NY, 2/10/04

  12. Benefits • Decreases pollution from power plants in and near New York City. • Lessens the demand for new power plants in and near New York City. • Helps budget-stretched Metropolitan Transportation Authority, New York State Thruway Authority and Amtrak by paying significant annual fees. • Creates large number of union jobs during installation. • Pays substantial taxes. • Encourages the development of clean and renewable power upstate. • Sets a precedent for underground invisible transmission. P. M. Grant Albany, NY, 2/10/04

  13. Cost • $ 750 M ($ 400 M “banked”) • To Be Commissioned by Summer 2006 Return • Loan Payment (4%, 40 yrs, 750 M$) = 35 M$/yr • Labor, Overhead, Maintenance = 5 M$/yr • Tariff = 0.5 ¢/kWh • Capacity = 2000 MW • Profit @ 50% Capacity = 4 M$/yr • Profit @ Full Capacity = 48 M$/yr P. M. Grant Albany, NY, 2/10/04

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.