HVDC Underground Cables The Empire Connection Paul M Grant, Ph.D. Physicist & Writer, Principal W2AGZ Technologies Paul M. Grant Energy Science & Technology Consulting Science Fellow EPRI w2agz@pacbell.net www.w2agz.com P. M.


slide-1
SLIDE 1

Albany, NY, 2/10/04

  • P. M. Grant

HVDC Underground Cables

The Empire Connection

Paul M. Grant Science Fellow EPRI Paul M Grant, Ph.D. Physicist & Writer, Principal W2AGZ Technologies

Energy Science & Technology Consulting w2agz@pacbell.net www.w2agz.com

slide-2
SLIDE 2

Albany, NY, 2/10/04

  • P. M. Grant
slide-3
SLIDE 3

Albany, NY, 2/10/04

  • P. M. Grant

FILTER FILTER i t Iac i t Iac Sending End Receiving End Rectifier Inverter R DC Line Idc Vdc Capacitor Filter i t Idc Transformer

slide-4
SLIDE 4

Albany, NY, 2/10/04

  • P. M. Grant
slide-5
SLIDE 5

Albany, NY, 2/10/04

  • P. M. Grant
slide-6
SLIDE 6

Albany, NY, 2/10/04

  • P. M. Grant
slide-7
SLIDE 7

Albany, NY, 2/10/04

  • P. M. Grant
slide-8
SLIDE 8

Albany, NY, 2/10/04

  • P. M. Grant
slide-9
SLIDE 9

Albany, NY, 2/10/04

  • P. M. Grant

www.empireconnection.com

Total Capacity 2000 MW DC

slide-10
SLIDE 10

Albany, NY, 2/10/04

  • P. M. Grant

Substation 1 Substation 2

Pole 1 500 MW Pole 2 500 MW 500 kV Lines / Cables

Bipole 1 - 1000 MW

F F

HVDC Circuit Details as Substation 1

F F F F F F F F F F F F F F F F

Substation 1 Substation 2

Pole 1 500 MW Pole 2 500 MW 500 kV Lines / Cables

Bipole 2 - 1000 MW

F F

HVDC Circuit Details as Substation 1

F F F F F F F F F F F F F F F F

slide-11
SLIDE 11

Albany, NY, 2/10/04

  • P. M. Grant

Leeds New Scotland Gilboa Athens Alps Long Mountain Hurley Marcy Edic Fraser Roseton Rock Tavern Buchanan S Buchanan N Pleasant Valley FishKill Dunwoodie Rainey Astoria West 49th Street Farragut Coeymans Tremont Circuit #1: 1,000 MW, +/- 500 KV HVDC Millwood

SprainBrook

Empire Connection & UPNY/SENY 345 KV Transmission Grid

Athens Spuyten Duyvil Circuit #2: 1,000 MW, +/- 500 KV HVDC Oak Point November 5, 2003 (4.4 m) (9.0 m) (15.9 m) (117.5 m) (117.5 m) (8.3 m) 15th Street

slide-12
SLIDE 12

Albany, NY, 2/10/04

  • P. M. Grant
  • Decreases pollution from power plants in and near

New York City.

  • Lessens the demand for new power plants in and

near New York City.

  • Helps budget-stretched Metropolitan Transportation

Authority, New York State Thruway Authority and Amtrak by paying significant annual fees.

  • Creates large number of union jobs during

installation.

  • Pays substantial taxes.
  • Encourages the development of clean and

renewable power upstate.

  • Sets a precedent for underground invisible

transmission.

Benefits

slide-13
SLIDE 13

Albany, NY, 2/10/04

  • P. M. Grant

Cost Return

  • $ 750 M ($ 400 M “banked”)
  • To Be Commissioned by Summer 2006
  • Loan Payment (4%, 40 yrs, 750 M$) =

35 M$/yr

  • Labor, Overhead, Maintenance =

5 M$/yr

  • Tariff =

0.5 ¢/kWh

  • Capacity =

2000 MW

  • Profit @ 50% Capacity =

4 M$/yr

  • Profit @ Full Capacity =

48 M$/yr