hozhoni automated art easel team 27
play

HOZHONI AUTOMATED ART EASEL Team 27 Abdulrahman Almarri ( Project - PowerPoint PPT Presentation

HOZHONI AUTOMATED ART EASEL Team 27 Abdulrahman Almarri ( Project Manager ) Aly Alharbi ( Web Master) Jarrah Al Bathali ( Contact Client ) Yongzhen Li ( Documentary ) Rakan Alhajraf ( Budget Liaison ) 1 Date: 4/28/2017 Client: Terri Engel


  1. HOZHONI AUTOMATED ART EASEL Team 27 Abdulrahman Almarri ( Project Manager ) Aly Alharbi ( Web Master) Jarrah Al Bathali ( Contact Client ) Yongzhen Li ( Documentary ) Rakan Alhajraf ( Budget Liaison ) 1 Date: 4/28/2017 Client: Terri Engel

  2. ● Overview : ● Project Description. ● Changes made to the project. ● Design Requirement. ● Bill of Materials. ● Customer Requirement. ● Manufacturing. ● Engineering Requirement. ● What we added functionality. ● Designs Considered. ● Testing. ● Design Selected. ● Project Outcome. April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  3. ● Project Description: ● Main Idea : ➢ Make a device that help adults with disability to draw and paint. ➢ Give them wide options to do their hobby. Support them to be more professional. ➢ ● Sponsor : ➢ Hozhoni Foundation. ● Client: ➢ Terri Engel. 2 April 28 ,2017 , Hozhoni Art B, Team 27, Yongzhen Li

  4. ● Project Description: ● Project supports people with disabilities in artwork. ● Project can be useable by many people with saving electric. ● Project will help them in a creative way. ● Project will let them determine the height that the user want. ● Project is easy to charge and can be in a daily use. ● Project is one of a kind that has never been done in this foundation before. 3 April 28 ,2017 , Hozhoni Art B, Team 27, Abdulrahman Almarri

  5. ● Design Requirements: Design supports people with disabilities while creating art. ● Solution must be comfortable to users. ● Give people with disabilities more options in drawing and painting. ● Provide more opportunities for people with disabilities to explore other art forms. ● 4 April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  6. Customer Requirements ● Customer Requirements: Safety Easy to store Light weight adjustable Easy To use Comfortable Easy to clean Size Saving time Low cost 5 April 28 ,2017 , Hozhoni Art B, Team 27, Aly Alharbi

  7. ● Engineering Engineering Requirements Requirements : No Sharp Parts Movable Light Material < (20lb) Flexible Simple Design Muscle Less Cleanable Easy to handle Time Low Cost < $600 6 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  8. ● Designs Considered: 7 April 28 ,2017 , Hozhoni Art B, Team 27, Abdulrahman Almarri

  9. ● Design Selected : 8 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  10. ● Design Selected : Before After 9 April 28 ,2017 , Hozhoni Art B, Team 27, Abdulrahman Almarri

  11. ● Design Selected: 11 April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  12. ● Changes Made to the project: ● We have changed the whole idea from Rotational Easel to a Window Regulator Easel. ● We have met some problems with the brake of the rotational easel so we decided to change it by the approve of our client and our instructor. 10 April 28 ,2017 , Hozhoni Art B, Team 27, Yongzhen Li

  13. ● Bill of Material Cost Battery w\ charger $ 76.24 Materials: Tires $ 15.92 Electrical stuff $ 106.05 Wall sticker $ 10.95 Electrical tester $ 15.82 Window Regulator $ 195.72 Screws $ 20.38 Easel $ 13.47 Wood $ 49.3 Corner Brace $ 40.3 Total of expenses $ 544.15 12 April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  14. ● Manufacturing: We started collecting the parts in the beginning of this semester. ● We started building the base with the stand together. ● Then we started to build the electrical circuit of the regulator. ● ● 13 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  15. ● Manufacturing: ● Then we did connect the regulator to the stand ● Then we did connect all the wires from the battery to the regulator. ● Then we hid all the wires with the inductors. ● Then we had the wallpaper on the project to give it another look. 14 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  16. ● What has been added functionality: ● Built a full project, then added the following: ● The battery level tester ● The wallpaper sticker to it. ● The cover of the wires to make it safe for users. ● The University, the Foundation, and the team name to it. ● There were no changes have been done to the project after finishing it. 15 April 28,2017 , Hozhoni Art B, Team27, Aly Alharbi

  17. ● Testing : 16 April 28, 2017 , Hozhoni Art B,Team27, Abdulrahman Almarri

  18. ● Project Outcomes: All the goals of the project were met as demanded. ● The project was working perfect for all the conditions in the foundation. ● Project was built on time. ● Budget was under budget by $600. ● Team met the challenge of advanced mechanical system solution. ● 17 April 28 ,2017 , Hozhoni Art B, Team 27, Aly Alharbi

  19. Questions? 18

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.