Assistive device art Team 27 : Abdulrahman Almarri , Aly Alharbi, - - PowerPoint PPT Presentation

assistive device art
SMART_READER_LITE
LIVE PREVIEW

Assistive device art Team 27 : Abdulrahman Almarri , Aly Alharbi, - - PowerPoint PPT Presentation

Assistive device art Team 27 : Abdulrahman Almarri , Aly Alharbi, Jarrah Albathali, Yongzhen Li, Rakan Alhajraf 1 Date: 2/1/2017 Project Description: Hozhoni Art Foundation that support all the aspects of arts for the disabled adults


slide-1
SLIDE 1

Assistive device art

Team 27 : Abdulrahman Almarri , Aly Alharbi, Jarrah Albathali, Yongzhen Li, Rakan Alhajraf Date: 2/1/2017

1

slide-2
SLIDE 2
  • Project Description:
  • Hozhoni Art Foundation that support all the aspects of arts for the disabled adults who doesn’t

have any income to draw in their foundation.

  • Many teams in the previous years had served a project for this foundation to help them get a new

design for the artists.

  • The goal of this project is to help them draw with a safe project that can let them work easily.
  • We think about building a new creative project that has never been done in this foundation.

Feb,2,2017 , Hozhoni Art B, Team 27, Yongzhen Li

2

slide-3
SLIDE 3
  • Updates:
  • We have changed the whole idea from Rotational Easel to a Window

Regulator Easel.

  • We have met some problems with the brake of the rotational easel so we

decided to change it by the approve of our client and our instructor.

Feb,2,2017 , Hozhoni Art B, Team27, Abdulrahman Almarri

3

slide-4
SLIDE 4
  • Updates:
  • Window Regulator of Jeep 2002.
  • Battery 12V that stays for 50-150 cycles.
  • Wiring for the system that is connected with the window regulator.
  • Charger that can charge the battery when it is empty.
  • Connectors for the wires.
  • A switch to move the system up and down for the user.

Feb,2,2017 , Hozhoni Art B,Team27, Jarrah Albathali

4

slide-5
SLIDE 5
  • Manufacturing:
  • Our Plans until next presentation:
  • We are still looking for the device that shows the level of the battery.
  • We will hide all the wires so no one can get an access to them.
  • We will change the paint of the project from the original color .
  • We will make test for the battery and the window regulator.

Feb,2,2017 , Hozhoni Art B, Team27, Abdulrahman Almarri

5

slide-6
SLIDE 6
  • Manufacturing:
  • Who is responsible for what?
  • Jarah - Electricity and Wiring.
  • Abdulrahman & Rakan - Easel and Window regulator.
  • Ali & Li - Base and Tires.

6

Feb,2,2017 , Hozhoni Art B, Team27, Aly Alharbi

slide-7
SLIDE 7
  • Budget:

Material Cost Quantity Image Battery w\ charger 76.24$ 1 Tires 15.92$ 4 Electrical stuff 106.05$ 3

Feb,2,2017 , Hozhoni Art B, Team27, Rakan Alhajraf

7

slide-8
SLIDE 8
  • Budget:

Window Regulator 195.72$ 1 Screws 20.38$ 3 Easel 13.47$ 1 Wood 49.3$ 10 Corner Brace 40.3$ 12 Total 517.38 Remaining 982.62$

Feb,2,2017 , Hozhoni Art B, Team27, Rakan Alhajraf

8

slide-9
SLIDE 9
  • Schedule:

Feb,2,2017 , Hozhoni Art B, Team27, Aly Alharbi