Hot Forming Line Isgec Solution for g Hot Forming Line Composition : g p 1. De-Stacking and Marking Station (Cell # 1) 2. Furnace Loading and Unloading (Cell # 2) 3. Press Loading (Cell # 3) 4. Hydraulic Press (Isgec) 5 5. End of


slide-1
SLIDE 1

Isgec Solution g for Hot Forming Line

slide-2
SLIDE 2

Hot Forming Line Composition : g p

1. De-Stacking and Marking Station (Cell # 1) 2. Furnace Loading and Unloading (Cell # 2) 3. Press Loading (Cell # 3) 4. Hydraulic Press (Isgec) 5 End of Line (EOL) Station with Racking (Cell # 4) 5. End of Line (EOL) Station with Racking (Cell # 4)

slide-3
SLIDE 3

Hot Forming Line Layout

Oven 4 Stacks of 4 Ovens (4 load and unload locations, highest at 12’)

Pa P

Load/Unload Load/Unload

Con P

  • alletized

Parts 1 Press Cycle Time = 8 sec ntainer 1 Pick from 1

  • r 2

Centeri ng table Containe r2 1 Palletiz Parts

Load/Unload

zed 2

Load/Unload After Pick-up Stamp part with date and time stamp

slide-4
SLIDE 4

Hot Forming Line details : g

  • Cycle time of Press

: 8 sec. without Hold (Dwell) time

  • Press sequence

: Fast Closing Fast Initial Pressing Final Pressing Hold (Dwell) Fast Return

  • Blank Material

: Steel coated Hot Stamp Material

  • Single blank dimensions
  • Width (Flow direction)

: 1220 mm (48”)

  • Length

: 1830 mm (72”)

  • Twin blank dimensions
  • Width (Flow direction)

: 1220 mm (48”)

  • Length

: 1830 mm (72”)

  • Blank thickness

: 0.635-2.54 mm (0.025”-0.10”)

  • Single Blank weight

: 20 kg Maximum

  • Twin Blank weight

: 10+10 kg Maximum

slide-5
SLIDE 5

De-Stacking and Marking Station (Cell # 1) : g g ( )

Consist up of :

  • 1 no. Robot for De-Stacking
  • 2 nos. Moving Carts on Rails / Tables

(both options available)

  • Magnets to avoid Double blank pick up
  • 1 no. Conveyor with Centering station (Vision system)
  • Cart Transfer speed : 0 25 m/s with Positional
  • Cart Transfer speed : 0.25 m/s with Positional

accuracy of +/- 3 mm

Options :

  • Marking Machine
  • Automatic Positioning system for Magnets
slide-6
SLIDE 6

Furnace Loading and Unloading (Cell # 2) : g g ( )

Consist up of :

  • 4 nos. Electric Heated Furnace suitable for Batch System with 4 Cubicles each one

(t t l 16 ll ) (total 16 cells)

  • Suitable for heating blanks upto 920 Deg.C and Blank Size 2200 mm x 2200 mm x 3 mm

(86.6” x 86.6” x 0.11”)

  • Maximum load per cycle per chamber : 35 Kg
  • Opening and Closing by Pneumatic cylinders automatically operated

p g g y y y p

  • 2 nos. Robots for Loading and Unloading blanks

Options :

  • Fifth Chamber
slide-7
SLIDE 7

Temperature Profile of Furnace

Temperature Profile of Typical Chamber

  • Blank is 1.2 mm
  • Heats up to 950 Deg. C
  • Approx. 200 sec.

Chamber Uniformity

  • Better than +/- 10 Deg. C
slide-8
SLIDE 8

Floor Mounted Heating Elements, Bottom Access

slide-9
SLIDE 9

Heating Elements

slide-10
SLIDE 10

Common w ired elements to rear

slide-11
SLIDE 11

Multi Chamber, Atmosphere,Development Unit

slide-12
SLIDE 12

Proto Unit,3 chamber, Atmosphere Side

slide-13
SLIDE 13

Atmosphere Flow Stand, Control Panels

slide-14
SLIDE 14

7 Chamber System, 2 Piece Sections

slide-15
SLIDE 15

Fork Load Chambers

slide-16
SLIDE 16

Chamber Interior

  • Removable Roof
  • Multiple Zones-Frt-Rear
  • Atmosphere Capability
  • Piers selected based on
  • Piers selected based on

automation

  • Modular Design for maintenance
slide-17
SLIDE 17

Press Loading (Cell # 3) : g ( )

Consist up of :

  • 1 no Robot for Loading blanks inside the Press
  • 1 no. Robot for Loading blanks inside the Press
  • Pyrometer inside press measure blank temperature
  • Interact with Press for checking blank temperature
  • If blank temperature low, Robot pick the blank and put it in garbage container
slide-18
SLIDE 18

Robots :

MAIN TECHNICAL FEATURES AXIS / PART DATA Robot model COMAU SMART NJ 100-3.2 Structure Articulated Parallelogram A tit 6 Axes quantity 6 Maximum Static Load on Wrist 100 kg(220.46 lb) Additional Maximum Load on Axis #3 50 kg (110.23 lb) Total Maximum Load 150 kg (330.69 lb) T A i 4 638 N Torque on Axis 4 5 6 638 Nm 638 Nm 280 Nm Axes Stroke (Speed) 1+7 2 3 ± 180° (120°/s)

  • 49° to +95 °(108 °/s)

222° t 68° (120 °/ ) 3 4 5 6

  • 222° to -68° (120 °/s)

± 200° (190 °/s) ± 120° (190 °/s) ± 200° (250 to 275 °/s) Repeatability ± 0,20 mm Maximum Reach Horizontal 3209 mm (10.53 ft) Weight Robot 1250 kg (2755.77 lb) Programming language COMAU PDL2 Control unit weight C5G 125 Kg g (C5G base only) g

slide-19
SLIDE 19

Smart IP : A powerful software with a “user-friendly” interface and “Windows-like” icons. It reduces the robot start-on-production time and manages the line production parameters,

calculating the cycle-time of the robots and synchronizing them with the press line during loading/unloading and transfer of the parts.

Immediate productivity display Total parameterization of the performances.

slide-20
SLIDE 20

Hydraulic Press (Isgec) : y ( g )

Major Technical parameters of the Press :

  • Capacity

: 12000 kN (1330 US Ton)

  • Daylight

: 2000 mm (78 7”)

  • Daylight

: 2000 mm (78.7 )

  • Stroke

: 1500 mm (59”)

  • Slide/Bolster Size

: 3000 mm x 2200 mm (118.1” x 86.6”)

  • Fast Approach

: 800 mm/s

  • Pressing @ 6000 kN

: 250 mm/s Pressing travel : 250 mm (9.84”)

  • Pressing @ 12000 kN

: 75 mm/s Pressing travel : 10 mm (0.39”)

  • Fast Return

: 800 mm/s

  • No. of Moving Bolster

: 2 nos.

  • No. of Moving Bolster

: 2 nos.

  • Direction of Moving Bolster : Center to Left &

Center to Right

slide-21
SLIDE 21

Hydraulic Press (Isgec) : y ( g )

Major Bought-outs used in the Press :

  • Main Pumps

: Parker / Rexroth

  • Major Hydraulic Valves

: Parker / Rexroth / Oilgear

  • Pressing & Safety Module

: Rexroth

  • Seals & Packing

: Merkel -Simrit / Parker / Buchak Shamban

  • Pipe & Pipe Fittings

: Parker / Legris / Hyloc

  • Main Motor

: Siemens / ABB Main Motor : Siemens / ABB

  • PLC & HMI

: Allen Bradley / Siemens

  • Lubrication System

: Woerner / Voegel

slide-22
SLIDE 22

End of Line (EOL) Station w ith Racking (Cell # 4) : ( ) g ( )

Consist up of :

  • 1 no Robot for Unloading of blank from the Press and place it in container
  • 1 no. Robot for Unloading of blank from the Press and place it in container.
  • 2 nos. Racking Containers
  • 2 nos. Automatic roll doors
slide-23
SLIDE 23

Isgec Reference Installations : g

12000 kN (1330 US Tons) Hydraulic Hot Forming Press installed at MARTINREA FABCO, Detroit, USA (Formerly Thyssen Krupp Fabco)

slide-24
SLIDE 24

Isgec Reference Installations : g

25000 kN (2780 US Ton) Hydraulic Hot Forming Press installed at AXLE INDIA LIMITED, India

slide-25
SLIDE 25

Isgec Reference Installations : g

20000 kN (2220 US Ton) Hydraulic Hot Forming Press installed at BHARAT FORGE LIMITED, India

  • First machine supplied in 1991
  • Repeat order received in 1999
  • Repeat order received in 1999
  • Used for Calibration & Padding Application
  • In 24 x 7 continuous operation with CLAMA robot
slide-26
SLIDE 26

Comau Robotics Reference Installations :

Hot Forming Press Line installed in Cassino Italy

slide-27
SLIDE 27

Comau Robotics Reference Installations :

Hot Forming Press installed in Clinton, TN

slide-28
SLIDE 28

Project Organisation : j g

Responsible for Project

Supplier of Hydraulic Press Supplier of Robotic Automation

Responsible for Project

Supplier of Furnace

(After Sales Support) (Line Integration, Prove Out & Component Trial)