HI GHL I GHT S OF PROPOSE D UPDAT E D ZONI NG T o wn o f - - PowerPoint PPT Presentation

hi ghl i ght s of propose d updat e d zoni ng
SMART_READER_LITE
LIVE PREVIEW

HI GHL I GHT S OF PROPOSE D UPDAT E D ZONI NG T o wn o f - - PowerPoint PPT Presentation

HI GHL I GHT S OF PROPOSE D UPDAT E D ZONI NG T o wn o f C ha tha m June 6, 2018 Pro c e ss T ime L ine Co mpre he nsive Pla n Ad o pte d 9/ 2009 Zo ning Imple me nta tio n Co mmitte e (ZIC) Dra ft 2015 Co


slide-1
SLIDE 1

HI GHL I GHT S OF PROPOSE D UPDAT E D ZONI NG

T

  • wn o f C ha tha m – June 6, 2018
slide-2
SLIDE 2

Pro c e ss T ime L ine

  • Co mpre he nsive Pla n Ad o pte d

9/ 2009

  • Zo ning Imple me nta tio n Co mmitte e (ZIC) Dra ft

2015

  • Co nsulta nt Re vie w o f ZIC Dra ft

3/ 2016

  • Co mpre he nsive Pla n Imple me nta tio n Gro up F
  • rme d to wo rk with Co nsulta nt

6/ 2016

  • Ong o ing Wo rk o f CPIG (Pha se 1)

6/ 2016 to 7/ 2017

  • T
  • wn Bo a rd , Pla nning Bo a rd , ZBA, CE

O Re vie w 7/ 2017

  • CPIG Me e ting s o n Pha se 2 wo rk

10/ 2017 to 3/ 2018

  • Ro a d s Co mmitte e / Re po rt to T
  • wn Bo a rd

11/ 2017

  • T
  • wn Bo a rd Re vie w Me e ting s/ Upd a te Dra ft

3/ 2018 to 5/ 2018

slide-3
SLIDE 3

Purpo se o f Zo ning Upda te

  • T
  • ma ke zoning c onsiste nt with

a dopte d Compre he nsive Pla n

  • Cle a r purpo se s, de finitio ns,

pro c e dure s

  • Spe c ific de ve lo pme nt sta nda rds
  • Co nsiste nt with Ne w Yo rk Sta te

T

  • wn la w
  • Ade q ua te to o ls fo r Pla nning

Bo a rd& ZBA

  • E

nha nc e a dministra tio n a nd e nfo rc e me nt

  • Addre ss ‘ ho t b utto n’ ite ms o f

impo rta nc e in T

  • wn.
slide-4
SLIDE 4

Co mpre he nsive Pla n Se ts the Sta g e

  • Pre se rva tio n o f rura l c ha ra c te r
  • Pro te c tio n o f e nviro nme nta l re so urc e s
  • E

xpa nde d ho using o ptio ns

  • De nsity, sc a le a nd inte nsity o f ne w use s

ma na g e d to b e c o nsiste nt with Cha tha m’ s c ha ra c te r & e nviro nme nt

  • Pro te c tio n a nd e nha nc e me nt o f a g ric ulture
  • Plan se e ks a mor

e de taile d, pr

  • sc r

iptive appr

  • ac h in Zoning
slide-5
SLIDE 5

Re vie w/ Upda te Pro c e ss…

  • Re vie w Co mpre he nsive Pla n, Ma ps, a nd

Appe ndic e s

  • Ma de c he c klist o f ‘ to -do ’ s’ fro m

Co mpre he nsive Pla n

  • Re vie we d e xisting zo ning , re so urc e ma ps fro m

Pla n

  • Sta rte d with ZI

C e dits, the n line b y line re vie w/ upda te b y CPI G

Stra te g y # Stra te g y Re la te d to Zo ning Visio n Ma ke sure purpo se sta te me nt o f zo ning ma tc he s visio n o f pla n

X

All De fine rura l c ha ra c te r in zo ning

X

1.1 Pre se rve o pe n spa c e b y e sta b lishing a T DR (T ra nsfe r o f De ve lo pme nts Rig ht) pro g ra m 1.2 De ve lo p E PODS in ste e p slo pe s, we tla nds, stre a ms, sc e nic vie ws, ridg e line s, flo o d pla ins, wildlife re so urc e s. Re fe rs to c o mp pla n ma ps o n we b site

X

1.4 Use true de nsity in du/ a c re inste a d o f minimum lo t size a nd tha t minimum lo t size s sha ll b e use d o nly to me e t se tb a c ks se ptic a nd wa te r

X

slide-6
SLIDE 6

Re vie w/ Upda te Pro c e ss…

  • CPI

G Re vie w & Upda te

  • Built o n dra ft fro m ZI

C

  • De ve lo pe d ne w E

nviro nme nta l Pro te c tio n Ove rla y Ma ps

  • Upda te d te xt o f zo ning la w, se c tio n b y se c tio n
  • I

nc o rpo ra te d Co mp Pla n/ Ag Pla n, Hydro g e o lo g y Study, Ro a ds Re po rt

  • Atto rne y a nd T
  • wn Bo a rd re vie w

Any q ue stio ns o n re vie w/ upda te pro c e ss?

slide-7
SLIDE 7

Cla rity, Org a niza tio n, Re a da b ility E nha nc e me nts

  • De finitio ns
  • Purpo se Sta te me nts
  • Re -o rg a niza tio n o f Se c tio ns
  • T

a b le o f Co nte nts

  • Writte n in pla in E

ng lish

  • Unifie d Use T

a b le sho wing a ll distric ts in o ne ta b le

slide-8
SLIDE 8

Pro c e ss & Re vie w E nha nc e me nts

  • Ne w spe c ia l use pe rmit

pro c e dure s

  • Spe c ia l Use Pe rmits to Pla nning

Bo a rd

  • Ne w site pla n pro c e dure s
  • Adde d Mo difie d Site Pla n fo r

c e rta in a g ric ulture use s

  • Ne w ZBA se c tio n
  • Upda te d Use T

a b le fo r P, SP, SUP

  • Ne w e nfo rc e me nt/ a dmin se c tio n
  • Ne w a me ndme nt se c tio n
slide-9
SLIDE 9

De ve lo pme nt Sta nda rds E nha nc e me nts to Ma tc h Co mp Pla n

  • E

nviro nme nta l Pro te c tio n Ove rla ys

  • Ste e p Slo pe (E

PO 1) a nd Sc e nic / Ridg e line (E PO 2)

  • Site Pla n c rite ria
  • Spe c ia l Use c rite ria
  • De nsity b o nuse s fo r de sire d a me nitie s
  • F

a rmla nd pro te c tio n siting

  • Ne w se c tio n o n ho me o c c upa tio ns
  • Mino r/ Ma jo r ho me o c c upa tio ns
slide-10
SLIDE 10

Zo ning Ma ps

  • No c ha ng e pro po se d to

zo ning ma p a nd distric ts

  • Adde d E

PO1 a nd E PO 2 ma p

slide-11
SLIDE 11

E PO 1 Ste e p Slope s E PO 2 Sc e nic / Ridge line s

slide-12
SLIDE 12

De ve lo pme nt Sta nda rds E nha nc e me nts

  • Adde d re c o mme nda tio ns fro m

Ag a nd Hydro g e o lo g y Pla ns

  • So urc e wa te r pro te c tio n
  • Mo re c o nside ra tio n o f impa c ts
  • n a g ric ulture
  • 1 princ ipa l use pe r lo t inste a d o f 2
  • Upda te d no nc o nfo rming use / lo t
  • Allo ws ne t a c re a g e / a ve ra g e lo t

size s

  • Sta nda rds fo r individua l use s
slide-13
SLIDE 13

De ve lo pme nt Sta nda rds E nha nc e me nts

  • Allo ws use o f ze ro lo t line in c e rta in

lo c a tio ns

  • Co mme rc ia l de sig n sta nda rds
  • Rura l siting sta nda rds
  • Ha mle t de sig n sta nda rds
  • No ise
  • De mo litio n
slide-14
SLIDE 14

De ve lo pme nt Sta nda rds E nha nc e me nts

  • Pro visio ns fo r spe c ific use s
  • Ca mps, so la r, po rta b le sto ra g e ,

a g -to urism, multi-fa mily dwe lling s, b e d a nd b re a kfa st, e tc .

  • E

le va te s impo rta nc e o f rura l ro a ds in re vie w a nd ide ntifie s use s o nly a llo we d ha ving a c c e ss fro m Co unty o r Sta te hig hwa y

  • Ne w sig n se c tio n

About 3/ 4 of Comp Pla n Str a te gie s Addr e sse d

slide-15
SLIDE 15

Ne xt Ste ps

  • Zo ning Ado ptio n
  • Pub lic He a ring o n Zo ning Upda te s
  • E

dits a s ne e de d

  • Co unty Pla nning Bo a rd Re vie w
  • SE

QR

  • L
  • c a l Zo ning L

a w Ado ptio n

  • Ro a ds Co mmitte e Wo rking On:

Hig hwa y Sta nda rds, Ro a d Ma inte na nc e Pro g ra m

  • CPI

G Wo rking o n: Sub divisio n Upda te