GRENFELL: The fallout an Edinburgh Napier University perspective Welcome Robert Taylor GIFireE Fire Safety Adviser Edinburgh Napier University (ENU) [Note: all views and opinions expressed are my own and not my employer] 14 th June 2017


slide-1
SLIDE 1

Welcome

Robert Taylor GIFireE Fire Safety Adviser Edinburgh Napier University (ENU)

GRENFELL:

The fallout – an Edinburgh Napier University perspective

[Note: all views and opinions expressed are my own and not my employer]

slide-2
SLIDE 2

Grenfell – the fallout: an Edinburgh Napier University perspective

14th June 2017

slide-3
SLIDE 3

Grenfell – the fallout: an Edinburgh Napier University perspective

Disbelief !!!!!!!!

slide-4
SLIDE 4

Grenfell – the fallout: an Edinburgh Napier University perspective

Media: mainstream and social media

Before midday on the day of the fire, reports first suggest that the cladding placed on the tower during its recent refurbishment was a significant factor in the rapid spread of fire that engulfed the premises.

slide-5
SLIDE 5

Grenfell – the fallout: an Edinburgh Napier University perspective

The cladding

A C M

lu lumi minium nium

  • m
  • mpo

posite site at ater erial ial

slide-6
SLIDE 6

Grenfell – the fallout: an Edinburgh Napier University perspective

Cladding type

  • Reynobond PE (LDPE)
  • Description
slide-7
SLIDE 7

Grenfell – the fallout: an Edinburgh Napier University perspective

National guidance / advice

  • Recommends that owners / occupiers and landlords review

their fire risk assessments

  • In particular to carry out specific checks on premises above

18m with reference to any rain cladding utilising the particular ACM (Reynobond PE)

slide-8
SLIDE 8

Grenfell – the fallout: an Edinburgh Napier University perspective

ENU approach

  • Desktop exercise

– Warrant drawings – O&M manuals – Premises H&S file under CDM – Other certification

  • Identified areas for concern to be flagged for follow up physical

inspection

slide-9
SLIDE 9

Grenfell – the fallout: an Edinburgh Napier University perspective

Certification

  • First conflict in the paperwork at one site between

– The Approved Warrant granted by City of Edinburgh Council – British Board of Agrément (BBA) Certification

  • Warrant states that Reynolux were to be used as the approved

cladding material

  • BBA cert notes the material as Reynobond PE
  • Friday night phone call from Property & Facilities Director
  • On site survey with relevant people

– Surveyor – Fire, H&S advisers – Cladding specialists

slide-10
SLIDE 10

Grenfell – the fallout: an Edinburgh Napier University perspective

Bainfield student residencies

Fountainbridge, Edinburgh

slide-11
SLIDE 11

Grenfell – the fallout: an Edinburgh Napier University perspective

Property description

  • Mixed height development between 5-8 floors

– in part over 18m

  • Design and build, leased on a full repair basis for 25

years by ENU

  • Purpose built student accommodation

– 117 flats – 778 students; individual study bedrooms and shared social space

  • Single 2 hour protected escape stair from each block
  • Approached from a ventilated firefighting lobby
  • Subject to HMO Licence from City of Edinburgh,

renewed March 2017

slide-12
SLIDE 12

Grenfell – the fallout: an Edinburgh Napier University perspective

Elevations

slide-13
SLIDE 13

Grenfell – the fallout: an Edinburgh Napier University perspective

slide-14
SLIDE 14

Grenfell – the fallout: an Edinburgh Napier University perspective

On site survey

  • Concerns re blue/green panels
  • Specialist contractor provides some assurance
  • Identifies the timber veneer panels as the potential

ACM cladding

  • These panels cover approx. 25% of the structure:

500 - 600 approx.

slide-15
SLIDE 15

Grenfell – the fallout: an Edinburgh Napier University perspective

slide-16
SLIDE 16

Grenfell – the fallout: an Edinburgh Napier University perspective

Survey: next step

  • Random audit of each elevation
  • Looking in particular at:

– panel – fixing – insulation behind – cavity barriers

  • Confirms presence of ACM “Reynobond PE” cladding
  • Confirms blue/green panels are of a cassette type only:

non combustible

slide-17
SLIDE 17

Grenfell – the fallout: an Edinburgh Napier University perspective

ACM cladding panel

slide-18
SLIDE 18

Grenfell – the fallout: an Edinburgh Napier University perspective

Carrier system and insulation

slide-19
SLIDE 19

Grenfell – the fallout: an Edinburgh Napier University perspective

Fire barriers

  • Important to ascertain if installed correctly
slide-20
SLIDE 20

Grenfell – the fallout: an Edinburgh Napier University perspective

The way forward for ENU

Priority task group set up by University to oversee project

prio iori rity y task sk grou

  • up

Communication strategy produced

comm mmun unica catio ion

Plan of works produced to rectify situation

plan an of works ks

Property Director takes decision to replace panels:  reputational  potential risk to staff and students  low appetite for risk at University  although premises empty at present over 400 14- 16 year old due to arrive within a week  financial loss

deci cisi sion n to repl plac ace panel els

slide-21
SLIDE 21

Grenfell – the fallout: an Edinburgh Napier University perspective

Fire Adviser tasking

  • Early contact with Scottish Fire & Rescue Service (SFRS)
  • Review of existing fire risk assessments (FRA) for premises (5 in

total)

  • Produce appendix to all FRA’s detailing current state – end

state c/w action plan of works

  • Assign a risk rating to the project: increased from previous
  • Informal discussions with Senior Fire Officer re what

compensatory measures we have detailed and in place to reduce the risk

  • Submission of FRA’s to Fire Service and request to continue to
  • ccupy whilst remedial works are undertaken
slide-22
SLIDE 22

Grenfell – the fallout: an Edinburgh Napier University perspective

Cladding specific Fire Risk Assessment

  • Measures to consider for continued use of premises

– means of escape – securing the MoE – warning/detection in case of fire – firefighting equipment – emergency lighting – signage – training incl. mandatory evacuation drills – maintenance – compensatory features

slide-23
SLIDE 23

Grenfell – the fallout: an Edinburgh Napier University perspective

SFRS response

  • Received an email response 26th June
  • Confirms and agrees with our FRA and allows us to continue to
  • perate during the remedial works
  • Inspection by two auditing and enforcement officers on 27th

June

– comprehensive testing / maintenance records going back 3 years were requested – officers confirm that we can occupy and continue to operate

  • An additional fire appliance is added to the pre-determined

attendance to every call: 4 pumps and a height till works are completed

slide-24
SLIDE 24

Grenfell – the fallout: an Edinburgh Napier University perspective

Progression

  • Delay to start due to procurement
  • 4 week replacement when work begins early July
  • Maintenance of safe work site as building occupied
  • Regular H&S Adviser audits
  • Complications with access
  • Works complete in just over 3 weeks at a cost of £100K
slide-25
SLIDE 25

Grenfell – the fallout: an Edinburgh Napier University perspective

Additional pressures during project

slide-26
SLIDE 26

Grenfell – the fallout: an Edinburgh Napier University perspective

slide-27
SLIDE 27

Grenfell – the fallout: an Edinburgh Napier University perspective