GREAT VALLEY SCHOOL DISTRICT DISTRICT-WIDE FACILITY STUDY & MASTER PLAN FINANCE COMMITTEE DISCUSSION 04 MAY 2020 1 K-5 ELEMENTARY SCHOOLS CURRENT capacity analysis OPERATING CAPACITY TARGET 90% 2019 OPERATING CAPACITY CURRENT USE


  1. GREAT VALLEY SCHOOL DISTRICT DISTRICT-WIDE FACILITY STUDY & MASTER PLAN FINANCE COMMITTEE DISCUSSION 04 MAY 2020 1

  2. K-5 ELEMENTARY SCHOOLS CURRENT capacity analysis OPERATING CAPACITY – TARGET 90% 2019 OPERATING CAPACITY CURRENT USE CAPACITY FUNCTIONAL CAPACITY CHARLESTOWN ES 80% 73% GWES Functional Capacity GENERAL WAYNE ES 87% 69% repurposes rooms internally for program to capture K.D. MARKLEY ES 84% 81% additional capacity SUGARTOWN ES 92% 85% The K-5 Elementary Schools can individually and together accommodate the current enrollments GREAT VALLEY SCHOOL DISTRICT 2

  3. 6-8 MIDDLE SCHOOL CURRENT OPERATING capacity analysis CAPACITY – TARGET 85% 2019 OPERATING CAPACITY PDE CAPACITY FUNCTIONAL CAPACITY GREAT VALLEY MS 86% 122% Great Valley Middle School is currently over capacity CURRENTLY NEED 14 ADDITIONAL GENERAL INSTRUCTIONAL SPACES (14 x 28 STUDENTS/CLRM = CAPACITY INCREASE OF 392) TO ACHIEVE THE TARGETED 85% UTILIZATION AT THE MIDDLE SCHOOL ( Does not include space needs for additional support rooms such as Art, Music, Special Education, etc., plus spaces needs at the Cafeteria) GREAT VALLEY SCHOOL DISTRICT 3

  4. 9-12 HIGH SCHOOL CURRENT OPERATING capacity analysis CAPACITY – TARGET 80% 2019 OPERATING CAPACITY GREAT VALLEY HS 60% Great Valley High School currently has additional space CURRENTLY HAS APPROX. 18 CLASSROOMS OF SURPLUS CAPACITY (540 SEATS AT 30 STUDENTS/CLRM. OF AVAILABLE CAPACITY) TO BE WITHIN THE TARGETED 80% UTILIZATION AT THE HIGH SCHOOL ( Does not include space needs for additional support rooms such as Art, Music, Special Education, etc., plus spaces needs at the Cafeteria) GREAT VALLEY SCHOOL DISTRICT 4

  5. MASTER PLANNING – CONCLUSIONS REACHED master planning 1. ELEMENTARY SCHOOLS – As a whole, are at capacity, however renovation to “Middle School” type spaces within General Wayne ES would allow for increased capacity 2. MIDDLE SCHOOL – Is currently over capacity. If the building is utilized as originally planned then it greatly exceeds capacity 3. HIGH SCHOOL – Has additional capacity within GREAT VALLEY SCHOOL DISTRICT 5

  6. MASTER PLANNING - TWO OPTIONS master planning 1. Delay activating the master planning, provide short-term solutions and “weather the storm”. Possible short-term solutions presented as part of this presentation. 2. Begin the planning process in order to be underway to manage the student capacity issues. GREAT VALLEY SCHOOL DISTRICT 6

  7. MASTER PLANNING – DELAYED master planning Possible recession duration according to 24 months some economists 18 months Planning, Design and Permitting Time 18-24 months Construction Time TOTAL TIME UNTIL MASTER PLAN 60-66 month s IMPLEMENTATION COULD BE RECOGNIZED TO ADDRESS CAPACITY ISSUES GREAT VALLEY SCHOOL DISTRICT 7

  8. WHAT WILL GVSD LOOK LIKE IN FIVE YEARS IF WE DO NOTHING 8

  9. enrollment projections DISTRICT-WIDE ENROLLMENT PROJECTIONS IN 5 YEARS +350 students +203 students +273 students GREAT VALLEY SCHOOL DISTRICT 9

  10. K-5 ELEMENTARY SCHOOLS PROJECTED capacity analysis OPERATING CAPACITY – TARGET 90% Existing and Functional Use Compared to Projected Enrollments - By School and Grade Level PRIMARY SCHOOLS GRADE E BUIL ILDIN DING 2025- 2025-26 DI 26 DI CURRENT U T USE CURRENT U T USE FUNCT NCTIONA NAL FUNCT NCTIONA NAL STR TRUCTU TURE ENR NROLLME MENT NT CAPACIT ITY Y PROJECTE TED USE C CAPACIT ITY Y USE SE PROJECTI TION (2019-20) (2019- 20) OPERATI TING (2019- (2019-20) 20) PROJECTE TED CAP APAC ACITY OPERATI TING CAP APAC ACITY K-5 Charlestown ES 375 454 83% 502 75% K-5 General Wayne ES 722 654 110% 110% 820 88% K-5 Kathryn D. Markley ES 658 686 96% 96% 712 92% 92% K-5 Sugartown ES 618 554 112% 112% 600 103% 103% TOTAL AL AV AVERAG AGE K K-5 C CAP APAC ACITY 2373 2373 2348 2348 101% 101% 2634 2634 90% 90% General Wayne Elementary School  The Functional Capacity includes converting former “Middle School” program areas to additional classroom space Sugartown and K.D. Markley Elementary Schools • Sugartown, and to a lesser extent K.D. Markley, will be over capacity in 5 years based on the projected enrollments 10

  11. ELEMENTARY SCHOOL SOLUTIONS IN 5 YEARS No District Changes master planning Operating as the buildings currently do, solutions to address capacity may include:  Renovations/Additions  General Wayne: Convert “Middle School-type” spaces to additional instructional space  Redistrict K-5 to re-apportion populations  Modular classrooms in lieu of renovations to GWES or in lieu of re-districting GREAT VALLEY SCHOOL DISTRICT 11

  12. SECONDARY SCHOOL PROJECTED capacity analysis OPERATING CAPACITY Existing and Functional Use Compared to Projected Enrollments - By School and Grade Level SECONDARY SCHOOLS GRADE E BUIL ILDIN DING 2025-26 DI 2025- 26 DI CURRENT U T USE CURRENT U T USE FUNCT NCTIONA NAL FUNCT NCTIONA NAL STR TRUCTU TURE ENR NROLLME MENT NT CAPACIT ITY Y PROJECTE TED USE C CAPACIT ITY Y USE SE PROJECTI TION (2019-20) (2019- 20) OPERATI TING (2019- (2019-20) 20) PROJECTE TED CAP APAC ACITY OPERATI TING CAP APAC ACITY 6-8 Great Valley MS 1275 1306 98% 98% 876 146% 146% 9-12 Great Valley HS 1610 2228 72% - - Middle School – Target 85%  The Middle School is currently over capacity and will further exceed it’s capacity in 5 years based on projected enrollments High School – Target 80%  The High School can accommodate the projected 5-year enrollments and would require no changes as it currently operates GREAT VALLEY SCHOOL DISTRICT 12

  13. MIDDLE SCHOOL SOLUTIONS IN 5 YEARS No District Changes master planning Operating as the building currently does, solutions to address capacity may include:  Additions  Add 22 general instruction classrooms (22 x 28 students/classroom = 616 seats; functional capacity 876 + 616 = 1492 x 85% occupancy = 1268 capacity to accommodate projected enrollments in 5 years)  Plus add classroom space for learning support or specials rooms  Plus expand kitchen/cafeteria for increased population  Modular classrooms in lieu of additions  Same notes as above  Move 8 th grade into the High School (Grades 8-12)  Although the number of 8 th grade general instruction classrooms and learning support classrooms can be accommodated in the high school, the high school department structure would integrate 8 th grade throughout the school, or modifications to the high school would be required to accommodate the 8 th grade teams including Science.  Specials, kitchen/cafeteria and athletics would need to be addressed to accommodate the increased population.  Note: teachers would likely not have their own classrooms. The function would need to be modified to act as a “community college” setting where every space is programmed the majority of the day. GREAT VALLEY SCHOOL DISTRICT 13

  14. GREAT VALLEY SCHOOL DISTRICT THANK YOU!

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.