Getting to Know Us Getting to Know Us July 2008 g Tarpon Systems - - PDF document

getting to know us getting to know us
SMART_READER_LITE
LIVE PREVIEW

Getting to Know Us Getting to Know Us July 2008 g Tarpon Systems - - PDF document

Getting to Know Us Getting to Know Us July 2008 g Tarpon Systems International Tarpon Systems International LLC Louisiana Location Louisiana Location 9828 Hwy 182 East, Amelia La 985-631-2000 Texas 262 N Sam Houston


slide-1
SLIDE 1

Getting to Know Us Getting to Know Us g

July 2008

slide-2
SLIDE 2

Tarpon Systems International Tarpon Systems International LLC

  • Louisiana Location

Louisiana Location

– 9828 Hwy 182 East, Amelia La – 985-631-2000

  • Texas

– 262 N Sam Houston Pkwy E., Suite 230, Houston Tx 77060 – 281-260-7500 281 260 7500

  • info@tarponsystems.com
  • www.tarponsystems.com
slide-3
SLIDE 3

TARPON SYSTEM TARPON SYSTEM

Tarpon Systems International LLC Owns Patents

51 Installations Worldwide Gulf of Mexico (41) W t Af i (5) West Africa (5)

  • S. E. Asia (5)

Right Sized Facility Capable of:

Installation in Water Depth of 60’ 350’ Installation in Water Depth of 60 - 350 Support 8-well Configuration Support Topside Weight up to 350 Tons Process Capacity – 30 MCF Designed to API RP2A to Withstand 100 Year Storm

slide-4
SLIDE 4

Right Sized Right Sized Facility for Field Development Facility for Field Development Applications:

  • High/Low Production Rates

– Right Sized for Field Production

  • Fast Track to Production

ast ac to

  • duct o

– 16 weeks Engineering through Installation

  • Extended/Short Field Production Life

P d ti Lif C id d i D i St – Production Life Considered in Design Stage

  • Minimizes Field Development Cost Without Compromising

Safety or Integrity

  • Ease of Field Abandonment
slide-5
SLIDE 5

Commercially Attractive Commercially Attractive

  • Low Capital Investment

E l P d ti A il bilit Th h St k d

  • Early Production Availability - Through Stock and

Pre-owned Equipment

  • Deployment Opportunity During Drilling Programs

Deployment Opportunity During Drilling Programs

  • Single Point Coordination

– Engineering, Fabrication and Installation g g,

slide-6
SLIDE 6

COMMERCIAL COMMERCIAL DIFFERENTIATION DIFFERENTIATION

  • Repeatable Design

g

  • Auto-Cad Drawings Already Standardized
  • Flexibility Allows Stocking of Number of Components
  • Simple Fabrication with Use of Standard Material
  • Pre-owned Equipment Available
  • Decks, Helidecks and Production Equipment
  • Ease of Abandonment
slide-7
SLIDE 7

Life Cycle Cost Advantages Life Cycle Cost Advantages

  • Low Capital Expense
  • Simple Construction
  • Ease of Installation - Through Proven

g Methods

  • Early Production Capability
  • Low Abandonment Cost
  • Recoverable/Reusable Component

p

slide-8
SLIDE 8

Ease of Installation

  • Potential Caisson Installation During Drilling

Potential Caisson Installation During Drilling Program w/ Drill Rig

  • Minimization of Offshore / Installation

Equipment through Integrated Development Planning

  • Tarpon Systems Installation Management
slide-9
SLIDE 9

Facts About Tarpon

  • 19 Structures in paths of Hurricane Ivan, Lilly,

19 Structures in paths of Hurricane Ivan, Lilly, Katrina and Rita

– No Catastrophic Damage Suffered

  • 16 Weeks Engineering thru Installation
  • More Stable Than All Other Similar Designs

g

  • Capable of Larger Deck Loads and Deeper

Water Depths Than Competition

  • Fixed Price Terms
slide-10
SLIDE 10

Helideck Deck

Boat Landing

T i ti Termination Clamp

Rod & Block Assembly

Caisson

Anchor Piles

slide-11
SLIDE 11