Getting to Know Us Getting to Know Us July 2008 g Tarpon Systems - PDF document

Getting to Know Us Getting to Know Us July 2008 g Tarpon Systems International Tarpon Systems International LLC Louisiana Location Louisiana Location 9828 Hwy 182 East, Amelia La 985-631-2000 Texas 262 N Sam Houston


  1. Getting to Know Us Getting to Know Us July 2008 g

  2. Tarpon Systems International Tarpon Systems International LLC • Louisiana Location Louisiana Location – 9828 Hwy 182 East, Amelia La – 985-631-2000 • Texas – 262 N Sam Houston Pkwy E., Suite 230, Houston Tx 77060 – 281-260-7500 281 260 7500 • info@tarponsystems.com • www.tarponsystems.com

  3. TARPON SYSTEM TARPON SYSTEM Tarpon Systems International LLC Owns Patents 51 Installations Worldwide Gulf of Mexico (41) W West Africa (5) t Af i (5) S. E. Asia (5) Right Sized Facility Capable of: Installation in Water Depth of 60’ Installation in Water Depth of 60 - 350 350’ Support 8-well Configuration Support Topside Weight up to 350 Tons Process Capacity – 30 MCF Designed to API RP2A to Withstand 100 Year Storm

  4. Right Sized Right Sized Facility for Field Development Facility for Field Development Applications: • High/Low Production Rates – Right Sized for Field Production • Fast Track to Production ast ac to oduct o – 16 weeks Engineering through Installation • Extended/Short Field Production Life – Production Life Considered in Design Stage P d ti Lif C id d i D i St • Minimizes Field Development Cost Without Compromising Safety or Integrity • Ease of Field Abandonment

  5. Commercially Attractive Commercially Attractive • Low Capital Investment • Early Production Availability - Through Stock and E l P d ti A il bilit Th h St k d Pre-owned Equipment • Deployment Opportunity During Drilling Programs Deployment Opportunity During Drilling Programs • Single Point Coordination – Engineering, Fabrication and Installation g g,

  6. COMMERCIAL COMMERCIAL DIFFERENTIATION DIFFERENTIATION • Repeatable Design g • Auto-Cad Drawings Already Standardized • Flexibility Allows Stocking of Number of Components • Simple Fabrication with Use of Standard Material • Pre-owned Equipment Available • Decks, Helidecks and Production Equipment • Ease of Abandonment

  7. Life Cycle Cost Advantages Life Cycle Cost Advantages • Low Capital Expense • Simple Construction • Ease of Installation - Through Proven g Methods • Early Production Capability • Low Abandonment Cost • Recoverable/Reusable Component p

  8. Ease of Installation • Potential Caisson Installation During Drilling Potential Caisson Installation During Drilling Program w/ Drill Rig • Minimization of Offshore / Installation Equipment through Integrated Development Planning • Tarpon Systems Installation Management

  9. Facts About Tarpon • 19 Structures in paths of Hurricane Ivan, Lilly, 19 Structures in paths of Hurricane Ivan, Lilly, Katrina and Rita – No Catastrophic Damage Suffered • 16 Weeks Engineering thru Installation • More Stable Than All Other Similar Designs g • Capable of Larger Deck Loads and Deeper Water Depths Than Competition • Fixed Price Terms

  10. Helideck Deck Boat Landing T Termination i ti Clamp Rod & Block Assembly Caisson Anchor Piles

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.