Georgian Railway Transit Potential 1 Content Middle Corridor - PowerPoint PPT Presentation

Georgian Railway Transit Potential 1 Content Middle Corridor South West Route Best Practices Planned and on-going projects Whats Next? Middle Corridor Lianyungang Growth of TEUs From China 302 % TITR


  1. Georgian Railway Transit Potential 1

  2. Content • Middle Corridor • South West Route • Best Practices • Planned and on-going projects • What’s Next?

  3. Middle Corridor Lianyungang Growth of TEU’s From China 302 % TITR Development The First Block Train from TITR TITR TITR Rebranded as Coordination Committee China to Tbilisi Consortium Association Middle Corridor 50 % 2016 2017 2019 2014 2015 2018

  4. South-West Route Odessa Astara China Iran, Azerbaijan, Georgia, Ukraine and Poland sides elaborated new tariff policy for the Bandar Abbas development of South-West Route. Nowadays, transportation of cargo by the sea from the Persian Gulf and the region of India in the direction of Europe requires 30-40 days. And the transportation of the same freight by the railway of Georgia, Azerbaijan and Iran will be Mumbai possible for rather a short time. Elaboration of Signing on Development The First test train Through Rates of South West Route from Slavkov to Astara 2018 2019 2016 2017

  5. Different routes for specific markets and their interoperability facilitators Tbilisi-Poti/Batumi-Black Sea Baku-Tbilisi-Kars (BTK) • Off-dock terminals • New Infrastructure • GRLT Terminal • Bogie exchange point • Specifically high safety standards • Transshipment Equipment • Transshipment dock • Agreed Tariffs • Container handling facilities Effects of interoperability Poti and Batumi are gateways to sea freight for Since BTK is completely new line therefore it Georgia and landlocked Central Asian countries. needed tight collaboration between Azerbaijan, Connectivity of Georgian Railway network and Georgia and Turkey to make it operational. Georgian ports is crucial for entire region and Recommended route for trade between Turkey- transcontinental multimodal railway based corridors. Central Asia and East Asia

  6. Railway track modernization project • Increasing capacity from 27.5M Bottleneck tons to 100M tons Mitigation • Speed increase from 60 to 80km/h for freight • Construction carried out by China Project Railway 23 RD construction Bureau details • Full automatic blocking system • 46% completed Status • Completion year: 2019

  7. Completion Year: 2021 Anaklia Throughput capacity: 100M tons Deep Berth can accommodate Panamax sized container ships Sea construction work is already underway Port Georgian government already invested GEL 100M 18 km new railway track connecting Anaklia Port to GR network

  8. Development of corridors requires scheduled departures of trains from potentially viable areas China (Urumqi, Lianyungang etc.) Central Asian Countries & Iran Europe At first adding scheduled service from Urumqi to Georgia will be tremendous step forward benefiting countries on Middle Corridor and other stakeholders. Organizations such as UNESCAP, UIC should support such endeavors.

  9. Thank You Contact: Rati.devadze@railway.ge 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.