SLIDE 1 10/03/2017
Emmanuelle VIN Martine Houyoux CEO & Founder Sales & Marketing +32 479 727 905 +32 483 68 25 34 evin@amia-systems.com mho@amia-systems.com
SLIDE 2 SIMOGGA Planner Advanced Scheduling & Planning
– Maximize Productivity – Maximize On Time delivery – Minimize your ecological footprint
– Assets: machine, building, vehicle – Employees – Time & Budget
– Working hours – Skills and Affinity – Logistics conflicts
2
SLIDE 3
Excel Tables SIMOGGA Planner Visualize, Quantify, Optimize the schedule and the planning
3
Magnetic Planning Boards Various Data Bases Project management software
SIMOGGA Planner
SLIDE 4 SIMOGGA Planner Case Study
4
Constraints
- Linear line with subparts desassembly
and assembly
- Washing machine combining multiple
products
- 15 days lead time constraint
Questions
- Can the production be sustained with 2
shifts ?
- Can we reduce the lead time ?
- Is there any bottleneck machine ?
- What is the optimal batch size ?
SLIDE 5
SIMOGGA Planner Configuring the planner - Shifts
5
Setting two shifts for the whole factory
SLIDE 6
SIMOGGA Planner Configuring the planner - Orders
6
Setting the due date of each order 15 days after the release date Base the ordering on the due date of each order
SLIDE 7
SIMOGGA Planner Configuring the planner - Operations
7
SLIDE 8
SIMOGGA Planner Configuring the planner - Machines
8
Setting the washing machine to handle 4 items simultaneously
SLIDE 9
SIMOGGA Planner Analyzing initial results
9
Incremental lead time Most of orders will not be ready within 15 days
SLIDE 10
SIMOGGA Planner Analyzing initial results
10
Production Timeline WIP
SLIDE 11
SIMOGGA Planner Finding the bottleneck machine(s)
11
Machine M26 is the first bottleneck: Cumulated waiting time = 3116 min (52h)
SLIDE 12
SIMOGGA Planner Finding the bottleneck machine(s)
12
Machine M26 is also the most used one.
SLIDE 13
SIMOGGA Planner Resolving the case
13
Set the M26 as the bottleneck machine Set the M26 on 3 shifts instead of 2
SLIDE 14
SIMOGGA Planner Comparing solutions – Lead time
14
Schedule1 is the initial schedule Schedule2 takes into account the bottleneck machine Each order is now ready within the 15 days time limit
SLIDE 15
SIMOGGA Planner Comparing solutions – Bottleneck
15
Schedule1 is the initial schedule Schedule2 takes into account the bottleneck machine The waiting time in front of M26 has been drastically lowered
SLIDE 16
SIMOGGA Planner Resolving the case
16
Modifying the batch size for the products
SLIDE 17
SIMOGGA Planner Resolving the case – Comparing KPIs
17
Schedule for different batch size on the main line 1 : batch size = 2 2 : batch size = 4 3 : batch size = 8
SLIDE 18
SIMOGGA Planner In-depth analysis - Visualize the bottlenecks in details
18
SLIDE 19
SIMOGGA Planner In-depth analysis
19
Number of items waiting in the system (minute by minute)
SLIDE 20
SIMOGGA Planner In-depth analysis - Orders lateness
20
SLIDE 21
SIMOGGA Planner In-depth analysis - Gantt Chart
21
SLIDE 22 SIMOGGA Planner In-depth analysis - Details of each order
22
Op1 Sub-assembly Op2 Op3 Op4 Op5
Red color when “Planned Start Date” or the “Current Date” > “Critical Start Date” Detailed information when the user drags the mouse over an operation
SLIDE 23 SIMOGGA Planner In-depth analysis - Schedule a new orderline
- The Planner will re-plan the orders
– by stabilizing the previous scheduled orders – by taking into account the new order or the new priority
- Add the financial aspects in the order panel to help the
Order processor to chose the right priority for the
- rders (= Decision Aid Solution)
23
SLIDE 24
SIMOGGA Planner In-depth analysis – Gantt in function of the priority of orders
24
SLIDE 25
SIMOGGA Planner In-depth analysis - Details of each operation (TODO List)
25
Filters available by machine, product, order
SLIDE 26
SIMOGGA Planner In-depth analysis – Units per day
26
SLIDE 27
Contact Us!
AMIA Systems, The “most innovative startup in Brussels” by Innoviris