+32 479 727 905 +32 483 68 25 34 evin@amia-systems.com - - PowerPoint PPT Presentation

32 479 727 905 32 483 68 25 34
SMART_READER_LITE
LIVE PREVIEW

+32 479 727 905 +32 483 68 25 34 evin@amia-systems.com - - PowerPoint PPT Presentation

Emmanuelle VIN Martine Houyoux CEO & Founder Sales & Marketing +32 479 727 905 +32 483 68 25 34 evin@amia-systems.com mho@amia-systems.com 10/03/2017 SIMOGGA Planner Advanced Scheduling & Planning OPTIMIZE YOUR GOALS


slide-1
SLIDE 1

10/03/2017

Emmanuelle VIN Martine Houyoux CEO & Founder Sales & Marketing +32 479 727 905 +32 483 68 25 34 evin@amia-systems.com mho@amia-systems.com

slide-2
SLIDE 2

SIMOGGA Planner Advanced Scheduling & Planning

  • OPTIMIZE YOUR GOALS

– Maximize Productivity – Maximize On Time delivery – Minimize your ecological footprint

  • WITH LIMITED RESOURCES

– Assets: machine, building, vehicle – Employees – Time & Budget

  • UNDER CONSTRAINTS

– Working hours – Skills and Affinity – Logistics conflicts

2

slide-3
SLIDE 3

Excel Tables SIMOGGA Planner Visualize, Quantify, Optimize the schedule and the planning

3

Magnetic Planning Boards Various Data Bases Project management software

SIMOGGA Planner

slide-4
SLIDE 4

SIMOGGA Planner Case Study

4

Constraints

  • Linear line with subparts desassembly

and assembly

  • Washing machine combining multiple

products

  • 15 days lead time constraint

Questions

  • Can the production be sustained with 2

shifts ?

  • Can we reduce the lead time ?
  • Is there any bottleneck machine ?
  • What is the optimal batch size ?
slide-5
SLIDE 5

SIMOGGA Planner Configuring the planner - Shifts

5

Setting two shifts for the whole factory

slide-6
SLIDE 6

SIMOGGA Planner Configuring the planner - Orders

6

Setting the due date of each order 15 days after the release date Base the ordering on the due date of each order

slide-7
SLIDE 7

SIMOGGA Planner Configuring the planner - Operations

7

slide-8
SLIDE 8

SIMOGGA Planner Configuring the planner - Machines

8

Setting the washing machine to handle 4 items simultaneously

slide-9
SLIDE 9

SIMOGGA Planner Analyzing initial results

9

Incremental lead time Most of orders will not be ready within 15 days

slide-10
SLIDE 10

SIMOGGA Planner Analyzing initial results

10

Production Timeline  WIP

slide-11
SLIDE 11

SIMOGGA Planner Finding the bottleneck machine(s)

11

Machine M26 is the first bottleneck: Cumulated waiting time = 3116 min (52h)

slide-12
SLIDE 12

SIMOGGA Planner Finding the bottleneck machine(s)

12

Machine M26 is also the most used one.

slide-13
SLIDE 13

SIMOGGA Planner Resolving the case

13

Set the M26 as the bottleneck machine Set the M26 on 3 shifts instead of 2

slide-14
SLIDE 14

SIMOGGA Planner Comparing solutions – Lead time

14

Schedule1 is the initial schedule Schedule2 takes into account the bottleneck machine Each order is now ready within the 15 days time limit

slide-15
SLIDE 15

SIMOGGA Planner Comparing solutions – Bottleneck

15

Schedule1 is the initial schedule Schedule2 takes into account the bottleneck machine The waiting time in front of M26 has been drastically lowered

slide-16
SLIDE 16

SIMOGGA Planner Resolving the case

16

Modifying the batch size for the products

slide-17
SLIDE 17

SIMOGGA Planner Resolving the case – Comparing KPIs

17

Schedule for different batch size on the main line 1 : batch size = 2 2 : batch size = 4 3 : batch size = 8

slide-18
SLIDE 18

SIMOGGA Planner In-depth analysis - Visualize the bottlenecks in details

18

slide-19
SLIDE 19

SIMOGGA Planner In-depth analysis

19

Number of items waiting in the system (minute by minute)

slide-20
SLIDE 20

SIMOGGA Planner In-depth analysis - Orders lateness

20

slide-21
SLIDE 21

SIMOGGA Planner In-depth analysis - Gantt Chart

21

slide-22
SLIDE 22

SIMOGGA Planner In-depth analysis - Details of each order

22

Op1 Sub-assembly Op2 Op3 Op4 Op5

Red color when “Planned Start Date” or the “Current Date” > “Critical Start Date” Detailed information when the user drags the mouse over an operation

slide-23
SLIDE 23

SIMOGGA Planner In-depth analysis - Schedule a new orderline

  • The Planner will re-plan the orders

– by stabilizing the previous scheduled orders – by taking into account the new order or the new priority

  • Add the financial aspects in the order panel to help the

Order processor to chose the right priority for the

  • rders (= Decision Aid Solution)

23

slide-24
SLIDE 24

SIMOGGA Planner In-depth analysis – Gantt in function of the priority of orders

24

slide-25
SLIDE 25

SIMOGGA Planner In-depth analysis - Details of each operation (TODO List)

25

Filters available by machine, product, order

slide-26
SLIDE 26

SIMOGGA Planner In-depth analysis – Units per day

26