Denton ISD Fine Arts Potential Project Report November, 2017 LED Lighting Systems to replace incandescent systems Campus spend about $2- 3k per year on lamps. None needed for LEDs. Cost for lamps continues to increase as transfer to LED.


slide-1
SLIDE 1

Denton ISD Fine Arts Potential Project Report

November, 2017

slide-2
SLIDE 2

LED Lighting Systems to replace incandescent systems

Campus spend about $2-3k per year on lamps. None needed for LED’s. Cost for lamps continues to increase as transfer to LED. Cost to run 15 incandescent per hour is 97.5 cents. Cost to run 15 LED’s per hour is 19.5 cents.

Rodriguez has LED instruments, but lack acks compet etitive ve control

  • l console.

le.

slide-3
SLIDE 3

Kiln Concern

Kilns on some campuses are aging Kiln rooms are not dedicated (doubling as storage is a safety concern)

slide-4
SLIDE 4

Counterweight system (There is not a full loft at Denton HS)

slide-5
SLIDE 5

Denton HS Band Hall (lacking in storage space)

slide-6
SLIDE 6

Denton HS Band Hall Storage

slide-7
SLIDE 7

Denton HS Hallway

Used for storage of percussion

slide-8
SLIDE 8

Denton HS Jazz Band rehearses in a regular classroom

slide-9
SLIDE 9

Denton HS Jazz Band sound in the library next to the classroom

slide-10
SLIDE 10

Band Towers

Denton ton HS is the only HS that doesn’t have a tower for marching band. Ry Ryan an HS has an aged tower that has been moved twice and needs to be replaced.

slide-11
SLIDE 11

Denton HS Choir

Ensemble and practice rooms used for storage due to lack of space.

slide-12
SLIDE 12

Ryan HS Band Hall (Lacks storage and has carpet)

slide-13
SLIDE 13

Ryan HS Band Dressing Rooms (Two small rooms serve 250-300 kids)

slide-14
SLIDE 14

Ryan HS Choir Robe Storage Room

slide-15
SLIDE 15

Overflow robes taking space in practice rooms

slide-16
SLIDE 16

Ryan HS Art Department

2 rooms have no sinks and no storage No storage for 3D programs Kiln rooms used for storage

slide-17
SLIDE 17

Ryan HS Auditorium

550 seat house is too small to accommodate concerts. Concerts have to be livestreamed into the library for overflow seating.

slide-18
SLIDE 18

Middle School Lighting System Control in Denton ISD

slide-19
SLIDE 19

Typical Middle School Lighting Control System

slide-20
SLIDE 20

Navo MS Sound System (typical in Denton ISD)

No working mics Cassette Players Obsolete 5 Disc Changer Can not play digital audio (iPod, etc)

slide-21
SLIDE 21

Guyer HS Theatre

Lacking storage (Hallway used for scenery storage) Computer in counterweight system not working

slide-22
SLIDE 22

Ryan HS & Braswell Dance/Drill Team

Lacking space in locker room (Girls have to share lockers) Braswell HS Dance/Drill team rehearsal space is much smaller than any other campus, limiting potential for program growth.

slide-23
SLIDE 23

Updated numbers are coming soon

slide-24
SLIDE 24

Denton ISD Athletic Department

Athletic Facility Planning 2018 Bond Project Considerations

slide-25
SLIDE 25

Building Champions For Life! Our Mission: We are committed to excellence in athletics as part of a larger commitment to excellence and education.

slide-26
SLIDE 26

Building Champions For Life! Our Vision: We are a highly effective organization serving the ever-evolving needs of the youth of our community.

slide-27
SLIDE 27

Building Champions For Life! Our Values: Excellence-Relentless pursuit of excellence Integrity-Acting with honor in all situations Humility-Promoting others before self

slide-28
SLIDE 28

Denton ISD Athletic Program Objectives

1. Involve as many students as possible in a positive athletic environment. 2. Instill in students an exemplary work ethic and the qualities of: accountability, citizenship and a high degree of sportsmanship. 3. Play everyone on all sub-varsity levels if eligible and in good standing with the team. 4. Develop and maintain a comprehensive off-season program. 5. Establish successful programs so that all participants enjoy a positive learning experience. 6. Have all programs represent excellence, integrity, and humility. 7. Demonstrate that each of our teams are well coached, highly disciplined, and very well organized. 8. Establish a district-wide alliance that promotes loyalty and pride that reflects the principles and attitudes of the Denton ISD. 9. Create an atmosphere of success by properly respecting and maintaining all athletic facilities, equipment, and uniforms. 10. Ensure that the Denton ISD Athletic Department objectives support the total mission of the Denton ISD.

slide-29
SLIDE 29

Denton ISD Athletic Department Long Range Facility Objectives and Vision

2018 Bond Project Considerations

  • Create championship facilities that will

promote pride and ownership for the student athlete and the community

  • Provide Athletic Department input and

collaboration with the end user in mind

  • Embrace equity among DISD facilities by

implementing athletic department specifications

  • Implement a strategic athletic facilities

plan that embraces growth, equity and durability.

slide-30
SLIDE 30

Why Invest in Athletics?

Cost Benefit:

  • At a cost of only one to three

percent (or less in many cases) of an overall high school’s budget, high school athletic programs are

  • ne of today’s best bargains.
slide-31
SLIDE 31

Why Invest in Athletics?

Academic Mission:

  • Athletics supports the Academic

Mission of the school district.

  • Students who participate in

athletic programs tend to have higher grade point averages, better attendance records and lower dropout rates and fewer discipline problems that students generally.

slide-32
SLIDE 32

Why Invest in Athletics?

Promote Health and Well Being:

  • Self-concept, self-image, physical

activity and weight management are a few of the health benefits realized by athletic participation.

slide-33
SLIDE 33

Why Invest in Athletics?

Athletics Foster Success in Later Life:

  • Participation in high school

athletics if often a predictor of later success in college, a career and becoming a contributing healthy member of society.

slide-34
SLIDE 34

Why Invest in Athletics?

  • Better Educational Outcomes
  • Enhanced School Engagement

and Sense of Belonging

  • Positive Youth Development/Life

Skills

  • Healthier Behaviors
  • Post High School Positive Results
  • Developing Better Citizens
  • School and Community Benefits
slide-35
SLIDE 35

48 Minutes To Play, A Lifetime To Remember

slide-36
SLIDE 36

Denton High School

  • Renovate Bronco Field
  • Renovate Track and Practice Field
  • Additional 2 Tennis Courts
  • Renovate Baseball Field
slide-37
SLIDE 37

Ryan High School

  • 500 Visitor Seats Competition

Field

  • Relocate Tennis Courts (8)
  • Renovate Baseball Field
  • New Synthetic Turf Practice Field
  • 60 yd Synthetic Turf Field
  • Renovate Gymnasium
slide-38
SLIDE 38

Guyer High School

  • Relocate Softball Field
  • New Fieldhouse - Football
  • Additional 2 Tennis Courts
  • Renovate Baseball Field
  • New Synthetic Turf Practice Field
  • Gym - Locker Room Renovations
  • Renovate existing fieldhouse
slide-39
SLIDE 39

Braswell High School

  • Third Gym
  • New synthetic turf practice field
  • 60 yard synthetic turf field between

east and west fieldhouse

  • Cover baseball/softball batting cages
  • Upgrade baseball and softball

scoreboards

  • Additional 2 Tennis Courts
slide-40
SLIDE 40

Calhoun Middle School

  • Laundry Room
  • Renovate Dressing Rooms/Weight

Room

  • Renovate Practice Field
  • New Bleachers Gym (2)
slide-41
SLIDE 41

Strickland Middle School

  • Laundry Room
  • Renovate Dressing Rooms/Weight

Room

  • Renovate Practice Field
  • New Bleachers Gym (2)
  • Scoreboards (4)
slide-42
SLIDE 42

McMath Middle School

  • Laundry Room
  • Renovate Practice Field
  • New Bleachers Gym (2)
  • Scoreboards (4)
slide-43
SLIDE 43

Crownover Middle School

  • Laundry Room
  • Renovate Practice Field
  • Scoreboards (4)
  • Shot Put/Discus
slide-44
SLIDE 44

Navo Middle School

  • Laundry Room
  • Renovate Practice Field
  • Scoreboards (4)
slide-45
SLIDE 45

Harpool Middle School

  • Renovate Practice Field
slide-46
SLIDE 46

Myers Middle School

  • Renovate Practice Field
slide-47
SLIDE 47

C.H. Collins Athletic Complex

  • Paint Stadium and Parking
  • Replace Plumbing Fixtures
  • Renovate Office/Hall of Honor
  • Signage - Front Pressbox
  • Enlarge officials dressing