Fall Protection RMMMA Members Our First Walkway First Walkway - - PowerPoint PPT Presentation

fall protection
SMART_READER_LITE
LIVE PREVIEW

Fall Protection RMMMA Members Our First Walkway First Walkway - - PowerPoint PPT Presentation

Fall Protection RMMMA Members Our First Walkway First Walkway Finished Product Fuel Tank Modification Part 1 Fuel Tank Modification Parts 2 Added Fuel Capacity (40 gallons) Tank Mod Finished Skid Tape and Slots Cut to see Ripper Step Dozer


slide-1
SLIDE 1

Fall Protection

RMMMA Members

slide-2
SLIDE 2

Our First Walkway

slide-3
SLIDE 3

First Walkway Finished Product

slide-4
SLIDE 4

Fuel Tank Modification Part 1

slide-5
SLIDE 5

Fuel Tank Modification Parts 2 Added Fuel Capacity (40 gallons)

slide-6
SLIDE 6

Tank Mod Finished

slide-7
SLIDE 7

Skid Tape and Slots Cut to see Ripper

slide-8
SLIDE 8

Step

slide-9
SLIDE 9

Dozer Tie Off

slide-10
SLIDE 10

D Ring Front Tie Off

slide-11
SLIDE 11

Top View

slide-12
SLIDE 12

D8

slide-13
SLIDE 13

Slots

slide-14
SLIDE 14

Dozer With Rear Window Guard

slide-15
SLIDE 15

D8N Finished

slide-16
SLIDE 16

D7 Tank Mod With a Camera

slide-17
SLIDE 17

Rear Veiw Camera From Brake Supply

slide-18
SLIDE 18

D Ring on the Cab

slide-19
SLIDE 19

First Attempt at Fall Prevention

slide-20
SLIDE 20

637E Railing

slide-21
SLIDE 21

Mounting to the Cab Skin

slide-22
SLIDE 22

637E Rear Tie off Cable

slide-23
SLIDE 23

Track Hoe

slide-24
SLIDE 24

D Ring Tie Off’s

slide-25
SLIDE 25

D Rings

slide-26
SLIDE 26

8 D Rings on our 637’s

slide-27
SLIDE 27

Blade Guarding

slide-28
SLIDE 28

Blade Access

slide-29
SLIDE 29

D11 Guarding

slide-30
SLIDE 30

D11R Full View

slide-31
SLIDE 31

Labeled Tie off Points

slide-32
SLIDE 32

Scraper Tie Off

slide-33
SLIDE 33

Tom Will Explain

slide-34
SLIDE 34

More for Tom

slide-35
SLIDE 35

Tom’s

slide-36
SLIDE 36

Tom’s

slide-37
SLIDE 37

Another D11R

slide-38
SLIDE 38

Nice Over the Hood Tie Off

slide-39
SLIDE 39

Another View

slide-40
SLIDE 40

Pull Tester

slide-41
SLIDE 41

Don’t forget the Recovery System And the Recovery Plan and Training

slide-42
SLIDE 42

637G Before access Improvement

slide-43
SLIDE 43

637G Access and Egress Modification

slide-44
SLIDE 44

Finishing the Welding

slide-45
SLIDE 45

Finished Platform

slide-46
SLIDE 46

Finished Project

slide-47
SLIDE 47
slide-48
SLIDE 48
slide-49
SLIDE 49

MSHS regulation

  • Subpart M
  • Machinery and Equipment
  • .14130 Roll-Over Protective Structures
  • (2) Alterations or Repair on ROPS shall be

performed only with approval from the ROPS manufacturer or under the instruction of a registered professional engineer with knowledge

  • f and experience on ROPS design. The

manufacture or engineer shall certify that the ROPS meets the applicable performance requirements

slide-50
SLIDE 50

Engineering Company the Certified all

  • ur Modifications
  • Consolidated Engineers Inc
  • 316 S Gillette Avenue
  • PO Box 1035
  • Gillette, WY 82716-1035
  • Phone: (307) 682-0768
  • Edward S. Scott P.E.
  • escott@ceincorp.com
slide-51
SLIDE 51

HD Steps Hand Rail Was Also Added.

slide-52
SLIDE 52

HD Rear Steps

slide-53
SLIDE 53

Work Platform

slide-54
SLIDE 54

Cab Access

slide-55
SLIDE 55

637 Hitch Rebuild

slide-56
SLIDE 56

637G Hitch Rebuild.

slide-57
SLIDE 57

Our New Drill Truck