Facility visit September 2007 Agenda Agenda Safety Safety - - PDF document

facility visit
SMART_READER_LITE
LIVE PREVIEW

Facility visit September 2007 Agenda Agenda Safety Safety - - PDF document

Facility visit September 2007 Agenda Agenda Safety Safety Ore body re body O Mining methods Mining methods Production Production Operating costs Operating costs Capital


slide-1
SLIDE 1

Facility visit

September 2007

slide-2
SLIDE 2

Agenda Agenda

  • Safety

Safety

  • O

Ore body re body

  • Mining methods

Mining methods

  • Production

Production

  • Operating costs

Operating costs

  • Capital expenditure

Capital expenditure

  • Human resources

Human resources

  • Key business issues

Key business issues

slide-3
SLIDE 3

Locality – Modikwa Platinum Mine

slide-4
SLIDE 4

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Act/F_cast 0.51 2.34 2.34 2.42 1.82 1.64 2002 2003 2004 2005 2006 H1 2007

Lost time injury frequency rate

Higher than target due to poor safety during Industrial Action

  • Safety programs are aimed at continuous improvement to achieve zero

accidents

slide-5
SLIDE 5

Fatalities

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Act/F_cast 3 3 1 1 2003 2004 2005 2006 H1 2007

Achieved 2 million Fatality Free Shifts in July 2007

slide-6
SLIDE 6

Modikwa Platinum Mine – lease area

Total lease area 14 278 ha Total lease area 14 278 ha

Mpumalanga Province

slide-7
SLIDE 7

50

58 61

20 -45 30 25 8 21 17 3 7 10 10 4 8 8 5

56

4

21 21 21

NORTH SHAFT SOUTH SHAFT HILL ADITS 107 Planned 101 Planned 97 Planned TRC BRC UG2 Leuconorite Unit 10 20 16

Optimal Stoping Cut (per shaft area)

Mine average planned at 102 cm – Currently 103cm

slide-8
SLIDE 8

Vertical grade distribution in UG2

South Shaft North Shaft

Reef channel Hanging wall Foot wall

Average g/t 4E: North 5.91 South 5.86 Total 5.89

slide-9
SLIDE 9

Measured Resource Indicated Resource Inferred Resource

2006 UG2 resource categories (Data Mine model)

slide-10
SLIDE 10

444.9 248.1 (55.8%) 109.6 (24.6%) 87.2 (19.6%) Total 96.1 (42.3%) 152.0 (69.9%) Inferred 227.4 217.5 Total 62.8 (27.6%) 46.8 (21.5%) Indicated 68.5 (30.1%) 18.7 (8.6%) Measured UG2 Merensky

Resource Classification – Tonnage 100 % JV (Millions)

  • Excluding proved and probable ore reserves
  • Resource discounted for Geological losses
slide-11
SLIDE 11

Footwall Drive

ASG PILLARS

Footwall Drive

200 m 4 m 210 m

105 m 8 m 1 m 4 m

Enlargement

Mining Direction Mining Direction

Mined Out Area Unmined Area See Enlargement 30 m Cross Cut Travelling Way & SO Muck Bay

Final Layout

Breast stoping layout with footwall development

slide-12
SLIDE 12

Modikwa Development Ends

Large Ends – Reef Drives vs Footwall Drives

5 10 15 20 25 30

No of Ends

Reef Drives 26 18 8 6 5 FW HLGE 1 7 12 15 15 Dec-04 Dec-05 Dec-06 'Aug 07 'Dec 08

  • All large ends will be in footwall by 2010

Move from Reef Drives to Footwall

slide-13
SLIDE 13

Modikwa

20 40 60 80 100 120 'Dec 07 'Dec 08 'Dec 09 'Dec 10

  • No. of Panels

Standard Final Breast spacing at 210 m Interim Breast spacing at 100m Breast from Dip spacing at 70m

Conversion from Dip to Breast Mining

  • Only breast mining is taking place (dip mining completely phased out)
  • All panels are expected to be on the standard 210m breast spacing by 2010
slide-14
SLIDE 14

14

Conversion to footwall strike development & breast stoping

Lower development profile required to generate ore reserves for breast mining

Dip mining Twin raise & reef drives Breast mining Footwall drives 83 22 17

m²/metre

602 472 106

m²/ Prim.- Large Ends

2 272 467 107

m²/ Prim.- R/W, TW, BH & Diag

2 941 943 53

m²/ Total Dev Required to replace 50 000 m² Required to replace 50 000 m² m²/metre

slide-15
SLIDE 15

UG2 Investment Centres

N3# N1# N2# S1# S2# S3#

Merensky Investment Centres

N3# N1# N2# S2# S1#

Both Reefs under continuous evaluation

slide-16
SLIDE 16

16

Production sources

(000’s tons per month)

South 2 & 3 Shaft North 2 & 3 Shaft 90 240

  • 120

120 Steady state 207 190 TOTAL 10 9 Mid Shaft 75 63 South 1 Shaft Life in Years 27 32 Hill 96 86 North 1 Shaft 2006 2005 Production area

  • Evaluation of possible expansion underway
  • Possible inclusion of Merensky
slide-17
SLIDE 17

2006 Merensky resource categories (Data Mine model)

Measured Resource Indicated Resource Inferred Resource

131 boreholes have been drilled with 242 reef intersections

slide-18
SLIDE 18

Upper Pyx Norite Bottom Chrome FW Pegmatoid Top Chrome

slide-19
SLIDE 19

Production

slide-20
SLIDE 20

Total primary development metres / month (Excludes # Sinking)

At steady state breast requires less development than dip to generate the

same ore reserves

H1 2007 affected negatively due to strike Planned between 1 900 to 2 000 m per month into the future

500 1,000 1,500 2,000 2,500 3,000 3,500

Metres

History 3,184 1,912 2,123 2,045 1444 '03 '04 '05 '06 H1 '07

slide-21
SLIDE 21

0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0

Months

History 7.7 12.1 14.2 16.0 Target 18 '04 '05 '06 '07

18 month reserve expected to be achieved in 2008 Transition to 100% underground production Excludes Temporary Non Available Reserves

Immediately Available Reserves

slide-22
SLIDE 22

Monthly area mined (m2)

H1 2007 affected negatively due to strike In steady state the production is planned at 50 000m2 / month to be achieved in 2008

5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000

History 22,195 34,842 38,320 44,391 33,828 '03 '04 '05 '06 H1 '07

slide-23
SLIDE 23

Stoping width

Steady state mine average planned at 103cm for 2008 and 2009

80.0 85.0 90.0 95.0 100.0 105.0 110.0 115.0 120.0

cm

History 113.4 106.3 104.2 101.6 103.0 '03 '04 '05 '06 H1 '07

slide-24
SLIDE 24

50000 100000 150000 200000 250000

Tons Milled

Other Sources 75,545 44323 22886 28094 4,843 8,956 HG UG2 119,455 157,427 174,114 189,156 205,824 160,211 '02 '03 '04 '05 '06 H1 '07

Average Tons Milled per Month

Merensky trial mining

H1 2007 affected negatively due to strike In steady state the production is planned at 240 kt/ month to be achieved in 2008

slide-25
SLIDE 25

Built-up Headgrade

1 2 3 4 5

g/t 4E

UG2 HG BUH 3.22 4.28 4.47 4.46 4.36 '03 '04 '05 '06 H1 '07

Head grade at 4.5 g/t will be achieved when stoping reaches full production

slide-26
SLIDE 26

Equivalent refined Pt oz / annum

6.00 26.00 46.00 66.00 86.00 106.00 126.00 146.00

Pt Oz's (000's)

History 91.00 114.20 129.00 135.20 51.8 '03 '04 '05 '06 H1 '07

H1 2007 affected negatively due to strike In steady state the Platinum profile is planned between 150 and 155 koz/annum

slide-27
SLIDE 27

Cash cost / ton milled

100 200 300 400 500 600

R/Ton Milled

Cash Cost/Tons Milled 303 363 372 442 567 '03 '04 '05 '06 H1 '07

H1 2007 affected negatively due to strike

slide-28
SLIDE 28

Lower platinum content of Modikwa ore results in higher unit cost per Pt oz,

comparable cost per PGM oz (44.46% Platinum)

H1 2007 affected negatively due to strike

Cash cost / equivalent refined Pt oz

1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000

R/Pt Oz

Cash Cost/Pt Oz 8,057 7,515 7,532 8,261 11,095 '03 '04 '05 '06 H1 '07

slide-29
SLIDE 29

Operating costs

Current cash costs per ton milled and Pt oz high as

build up continues.

Drivers of cost reduction Volume increase 4 mining areas to 2 1,5m of equipped face per m face blasted Novice workforce moving up learning curve Less development required Cost reduction initiatives

slide-30
SLIDE 30

Capital expenditure (R000’s)

100 200 300 400 500

Thousands

Total Modikwa 438,241 147,212 234,183 186,288 79,563 '03 '04 '05 '06 H1 '07

R100m/100koz of platinum production life of mine average. Approximately R200m/100koz per annum for the next 4 years as capex profile is

‘lumpy’ when deepening

slide-31
SLIDE 31

Capital expenditure

Main Items for 2007

Replacement or refurbishment of mechanised fleet

– R89 million

Merensky Trial Mining – R31 million North Shaft Deepening – R51 million Ore Reserves – R27 million

slide-32
SLIDE 32

Employee and Community Relations

Community relations improving with more challenges in

some community groupings than others

The 25 day strike and delayed return to Sunday work around

February 2007 heightened tensions but situation is back to normal

Training programmes for learner miners and supervisors

resulting in improved supervision

Implemented and achieved 38% of the HDSA in

management positions

SED expenditure of approximately R 8m in 2007

slide-33
SLIDE 33

Key business issues

Improved safety performance Achieve planned volume increase Smooth transition from down dip to breast

stoping and moving drives into footwall

Further improve efficiency of the mechanised

development and tramming

Improve efficiencies of stoping teams Steady state production will be achieved in

2008

slide-34
SLIDE 34

END