F OL L OW UP F o r info rma tio n S OURCE Je a n Sc hwe itze - - PDF document

f
SMART_READER_LITE
LIVE PREVIEW

F OL L OW UP F o r info rma tio n S OURCE Je a n Sc hwe itze - - PDF document

Gas quality CE N/ AF NOR / WG197 Da te : Do c . numb e r: 2011-02-24 N 244 Assistant: Your c ontac t: Pe rla MANKE SSI Sylvie F E RNANDE Z Dire c t line : + 33 (0)1 41 62 87 20 Dire c t line : + 33 (0)1 41 62 86 59


slide-1
SLIDE 1

Assoc iation F r anç aise de Normalisation 11, rue F ra nc is de Pré sse nsé F – 93 571 L a Pla ine Sa int De nis c e de x http :/ / www.a fno r.fr SI RE T 775 724 818 00205

Pr esentation of Gasqual

C OMME NT S F OL L OW UP F

  • r info rma tio n

S

OURCE Je a n Sc hwe itze r

« Gas quality »

CE N/ AF NOR / WG197

Da te :

2011-02-24

Do c . numb e r:

N 244

Assistant: Pe rla MANKE SSI Dire c t line : + 33 (0)1 41 62 87 20 marie .b o urb ig o t@ afno r.o rg Your c ontac t: Sylvie F E RNANDE Z Dire c t line : + 33 (0)1 41 62 86 59 sylvie .fe rnande z@ afno r.o rg

slide-2
SLIDE 2

CEN BT WG 197 February 2011

GASQUAL points 6‐1 Testing protocol evolution 6‐2 Testing situation 6‐3 Presentation of the results obtained so far

Gasqual presentation 23-11-2010

slide-3
SLIDE 3
  • Resolution 25/2010 Testing protocol

WG 197 suggests that GASQUAL tries to simplify the testing protocol in order to allow for the maximum number of appliances to be tested. A proposal will be circulated to WG 197 liaison experts for approval as according to resolution 37/2009. Done no further simplification is suggested

Gasqual presentation 23-11-2010

slide-4
SLIDE 4

Immediate changes proposed

1)Voltage: 2)Pressure: 3)F6 influence of density: 4)For appliances that are adjustable: at B1 setting. 5)For appliances that are adjustable: at G1 setting. Start the test with A1 and stop the tests if there is no safety or operational problems (no test with E1). Otherwise continue with the next gas as described in the protocol.

Gasqual presentation 23-11-2010

GQWP5_38_Protocol_shorteningv01

slide-5
SLIDE 5

Gasqual presentation

TARGET 75,00 Done 34,70 Identified 7,00 Missing 33,30 Proposed 22,60 Still missing 10,70

TESTING SITUATION Testing progress: see status sent in January: GQWP5_29 Test Status 2011_01_10 Overall situation: We have today identified ca 90 equivalent, 2 or 3 are not fully identified yet. 10 new equivalent will need to be defined asap (= now) ( conclusion of the per segment analysis) There will be an uncertainty on the n_equivalent until the end (expect +/- 2 ?)

slide-6
SLIDE 6

Gasqual presentation 23-11-2010

Purchase of appliances Purchase of UK appliances:

slide-7
SLIDE 7
  • GQWP5_29 Test Status 2011_02_04

Gasqual presentation 23-11-2010

slide-8
SLIDE 8
  • Long term test, Presentation of the results
  • btained so far

Gasqual presentation 23-11-2010

slide-9
SLIDE 9

Gasqual presentation 23-11-2010

slide-10
SLIDE 10

Gasqual presentation 23-11-2010

slide-11
SLIDE 11

Gasqual presentation 23-11-2010

slide-12
SLIDE 12

Gasqual presentation 23-11-2010

slide-13
SLIDE 13
  • Test pattern

Graphs Feb4_9

Gasqual presentation 23-11-2010

slide-14
SLIDE 14
  • Resolution 36/2010: Long term testing
  • WG 197 restated that appliances to be long

term tested are adjustable ones plus two cookers and one space heater due to sooting

  • issue. The testing scheme for adjustable

appliances is that they are tested by pair with

  • ne adjusted to simulate the E1‐A1 gap and
  • ne adjusted to simulate the G1‐A1 gap.
  • Gasqual presentation

23-11-2010

slide-15
SLIDE 15

Gasqual presentation 23-11-2010

For cost reasons all test are carried with Danish natural gas

slide-16
SLIDE 16

Gasqual presentation 23-11-2010

DK gas + Butan

slide-17
SLIDE 17
  • Results overview

Gasqual presentation 23-11-2010

slide-18
SLIDE 18

Gasqual presentation 23-11-2010

slide-19
SLIDE 19

CEN BT WG 197 February 2011

GASQUAL points 6‐1 Testing protocol evolution 6‐2 Testing situation 6‐3 Presentation of the results obtained so far

Gasqual presentation 23-11-2010

slide-20
SLIDE 20
  • Resolution 25/2010 Testing protocol

WG 197 suggests that GASQUAL tries to simplify the testing protocol in order to allow for the maximum number of appliances to be tested. A proposal will be circulated to WG 197 liaison experts for approval as according to resolution 37/2009. Done no further simplification is suggested

Gasqual presentation 23-11-2010

slide-21
SLIDE 21

Immediate changes proposed

1)Voltage: 2)Pressure: 3)F6 influence of density: 4)For appliances that are adjustable: at B1 setting. 5)For appliances that are adjustable: at G1 setting. Start the test with A1 and stop the tests if there is no safety or operational problems (no test with E1). Otherwise continue with the next gas as described in the protocol.

Gasqual presentation 23-11-2010

GQWP5_38_Protocol_shorteningv01

slide-22
SLIDE 22

Gasqual presentation

TARGET 75,00 Done 34,70 Identified 7,00 Missing 33,30 Proposed 22,60 Still missing 10,70

TESTING SITUATION Testing progress: see status sent in January: GQWP5_29 Test Status 2011_01_10 Overall situation: We have today identified ca 90 equivalent, 2 or 3 are not fully identified yet. 10 new equivalent will need to be defined asap (= now) ( conclusion of the per segment analysis) There will be an uncertainty on the n_equivalent until the end (expect +/- 2 ?)

slide-23
SLIDE 23

Gasqual presentation 23-11-2010

Purchase of appliances Purchase of UK appliances:

slide-24
SLIDE 24
  • GQWP5_29 Test Status 2011_02_04

Gasqual presentation 23-11-2010

slide-25
SLIDE 25
  • Long term test, Presentation of the results
  • btained so far

Gasqual presentation 23-11-2010

slide-26
SLIDE 26

Gasqual presentation 23-11-2010

slide-27
SLIDE 27

Gasqual presentation 23-11-2010

slide-28
SLIDE 28

Gasqual presentation 23-11-2010

slide-29
SLIDE 29

Gasqual presentation 23-11-2010

slide-30
SLIDE 30
  • Test pattern

Graphs Feb4_9

Gasqual presentation 23-11-2010

slide-31
SLIDE 31
  • Resolution 36/2010: Long term testing
  • WG 197 restated that appliances to be long

term tested are adjustable ones plus two cookers and one space heater due to sooting

  • issue. The testing scheme for adjustable

appliances is that they are tested by pair with

  • ne adjusted to simulate the E1‐A1 gap and
  • ne adjusted to simulate the G1‐A1 gap.
  • Gasqual presentation

23-11-2010

slide-32
SLIDE 32

Gasqual presentation 23-11-2010

For cost reasons all test are carried with Danish natural gas

slide-33
SLIDE 33

Gasqual presentation 23-11-2010

DK gas + Butan

slide-34
SLIDE 34
  • Results overview

Gasqual presentation 23-11-2010

slide-35
SLIDE 35

Gasqual presentation 23-11-2010