F. Bosi - M. Massa INFN-Pisa on behalf of the - - PowerPoint PPT Presentation

f bosi m massa infn pisa on behalf of the superb svt group
SMART_READER_LITE
LIVE PREVIEW

F. Bosi - M. Massa INFN-Pisa on behalf of the - - PowerPoint PPT Presentation

F. Bosi - M. Massa INFN-Pisa on behalf of the SuperB-SVT Group


slide-1
SLIDE 1

1

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

  • F. Bosi - M. Massa

INFN-Pisa

  • n behalf of the SuperB-SVT Group
slide-2
SLIDE 2

2

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

  • Mechanical Engineering Group Organization

Mechanical Design work Status Main design Activities Conclusion

slide-3
SLIDE 3

3

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

  • !

"# $ %#%# & %#'() * +,-.

  • /#%'"(%'
slide-4
SLIDE 4

4

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

  • !

0#+1. 23,, #4 " 0"+1. 235"

  • $

%#6 #7 &'' ## # #80- 9

slide-5
SLIDE 5

5

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

  • &

%'(## 3 3)9 4 %'-.4#3" #!%' * +,

  • #%'

#4:# +;

slide-6
SLIDE 6

6

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

slide-7
SLIDE 7

7

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

  • +

1!$ 3,,4,,-. 3 ) 1&%'4 ) ) 1*3/

  • .-. +<06

"+<0 ) /

  • 1
  • .

+

slide-8
SLIDE 8

8

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009 ! "#$%&# ' ( )*+* ( ",-.,/" ( # 0!.,/" # 1%

slide-9
SLIDE 9

9

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

2%/%

slide-10
SLIDE 10

10

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

2%/%

tungsten

slide-11
SLIDE 11

11

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

"+!

!

slide-12
SLIDE 12

12

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

2%/%

slide-13
SLIDE 13

13

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009 % 2%/%+*

  • 2%/%3+*
slide-14
SLIDE 14

14

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009 Mechanics First thermal and mechanical characterization of Layer0 module support for hybrid pixel, realized with CF microchannels and the additive method: June 2009 Hydraulic flanges prototype for layer0 modules & conclude R&D on Layer0 module support: from June to Oct 2009 Full layer0 support design: June 2009-Sept 2010 Solid modeling of IR based on present design: first iteration by June 4 2009 Recover all design from BaBar SVT by June 2009 First design of the mechanical support , based on BaBar SVT (modules, space frame, support cones or other similar solutions) with the new SuperB IR: Dec 2009 Possible alternative Mechanical Support design to allow fast L0/SVT dismounting: Oct 2009-Sept.2010 Beam Pipe design: June 2009-Sept2010

TDR work schedule & Milestones (II)

P r e l i m i n a r y

slide-15
SLIDE 15

15

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

!.

( 16,,

  • ( =%'

( )

  • .3
slide-16
SLIDE 16

16

F.Bosi, M.Massa, SuperB Workshop IX - Perugia, June 16-20, 2009

Back up