Existing Commercial Structures in Residential Zones LAN D U S E - - PowerPoint PPT Presentation

existing commercial structures in residential zones
SMART_READER_LITE
LIVE PREVIEW

Existing Commercial Structures in Residential Zones LAN D U S E - - PowerPoint PPT Presentation

Existing Commercial Structures in Residential Zones LAN D U S E COM M ITTEE AP R IL 2 0 , 2 0 17 Outline 2 Why? City Comprehensive Plan Policy What/ Where? Explore Applying Existing Overlay to Other Areas How/ Who?


slide-1
SLIDE 1

LAN D U S E COM M ITTEE AP R IL 2 0 , 2 0 17

Existing Commercial Structures in Residential Zones

slide-2
SLIDE 2

Outline

2

 Why?

 City Comprehensive Plan Policy

 What/ Where?

 Explore Applying Existing Overlay to Other Areas

 How/ Who?

 Public Outreach and Engagement

 When?

 Draft Timeline

slide-3
SLIDE 3

City Comprehensive Plan Policy

 Land Use Chapter 3

 LU 1.14 Existing Uses  LU 7.3 Historic Reuse

 Economic Development Chapter 7

 ED 2.3 Reusable Buildings Inventory  ED 7.6 Developm ent Standards and Perm itting

Process

 Chapter 8, Urban Design & Historic Preservation:

 DP 4 .8 Zoning Provisions and Building Regulations  DP 4 .9 Rehabilitation of Historic Properties

10 0 3 E. Illinois Ave. Logan

slide-4
SLIDE 4

 Current Regulations

 Neighborhood scale

commercial use

 Residentially zoned area

(RSF, RTF, RMF, RHD)

 Non-residential structure

must have been in existence at the time of adoption of this section.

 Must be on arterial street

  • r listed on Spokane

Historic Register

Existing Neighborhood Commercial Structures

“Howard’s Service Station” 2425 W Broadway Ave

slide-5
SLIDE 5

Historic Streetcar Routes in West Central

(From Metro Spokane w ebsite)

Boone Ave Dean Ave

5

slide-6
SLIDE 6

6

slide-7
SLIDE 7

Broadway Cochran

 250 1 W Broadway Ave  Built 19 0 7 - Zoned RSF  24 25 W Broadway Ave  Zoned Residential Single

Fam ily (RSF)

7

slide-8
SLIDE 8

8

slide-9
SLIDE 9

“Piggly Wiggly” located on Northwest corner of Boone & Cochran 250 2 W. Boone Avenue

9

slide-10
SLIDE 10

“Piggly Wiggly” located on Northwest corner of Boone & Cochran 250 2 W. Boone Avenue

10

slide-11
SLIDE 11

11

slide-12
SLIDE 12

Allowed & Prohibited Uses

12

 Allowed Uses:

 As Described in Office Category  As Described in Retail Sales & Service Category  As Allowed within Residential Multifam ily (RMF)

Zone

 Uses Not Allowed:

 Sale or Leasing of Motorized Consum er Vehicles  Fire Arm s  Weapons  Medical Marijuana Sales

slide-13
SLIDE 13

Development and Operation Standards

 Legally Built to Accommodate a Non-Residential Use  No Expansion onto Neighboring Sites  Parking and Loading - Minus the First 5 Spaces as

Required in SMC 17C.230

 Hours of Operation – Determined by Director or Not

Permitted 10pm to 5AM

 Drive through Prohibited  Outdoor Storage Limited, Screening, Lighting

Limitations

 CC-4 Signage Standards Apply

13

slide-14
SLIDE 14

Application Process

 Planning Director Administrative Determination  Public Notice Consistent with a Type II  Fees Consistent with a Type I Fee  Appeal Consistent with a Type II, Appealable to

Hearing Examiner.

slide-15
SLIDE 15

 10 26 E Newark Ave  Zoned RSF; Adjacent to Residential

Multifam ily (RMF)

 Near South Perry Neighborhood Center

18

slide-16
SLIDE 16

19

slide-17
SLIDE 17

20

slide-18
SLIDE 18

21

slide-19
SLIDE 19

22

 60 4 W Augusta Ave  Zoned Residential High Density (RHD-55)  Em erson Garfield Neighborhood Council

slide-20
SLIDE 20

23

slide-21
SLIDE 21

24

slide-22
SLIDE 22

25

 928 E Liberty Ave  Zoned RSF  Nevada Heights Neighborhood Council

slide-23
SLIDE 23

Options for Expansion/ Limitation

 Location

 Residential Zones in East Central  Expand to Residential Zones Citywide  Location Directly on an Arterial

 Time Period/ Quantity/ Rate

 Exam ple: 2 Years, then Revisit

 Size

 Lim itation 5,0 0 0 sq.ft. Building Footprint  Threshold 3,0 0 0 – 5,0 0 0 sq.ft. for Higher Level

Process

slide-24
SLIDE 24

Public Outreach & Engagement

27

slide-25
SLIDE 25

Next Steps

 Outreach to Stakeholders

January

 GIS Inventory, Initial Analysis, Resources, Project

Webpage

 Plan Commission Workshop to Report Initial Results  Public Open Houses

 West Central Com m unity Center

Ma y 4

 East Central Com m unity Center

Ma y 9

 Plan Commission Workshop

May 10?

 Plan Commission Hearing

June?

28