Conceptual Plan Kick-Off Andrew Haswell Green Park Phase 3 - - PowerPoint PPT Presentation

conceptual plan kick off
SMART_READER_LITE
LIVE PREVIEW

Conceptual Plan Kick-Off Andrew Haswell Green Park Phase 3 - - PowerPoint PPT Presentation

Andrew Haswell Green Park Phase 3 Conceptual Plan Kick-Off Andrew Haswell Green Park Phase 3 Existing Conditions Existing Conditions Existing Conditions Existing Conditions Existing Conditions * Existing Conditions * *


slide-1
SLIDE 1

Andrew Haswell Green Park Phase 3

Conceptual Plan Kick-Off

slide-2
SLIDE 2

Existing Conditions

Andrew Haswell Green Park – Phase 3

slide-3
SLIDE 3

Existing Conditions

slide-4
SLIDE 4

Existing Conditions

slide-5
SLIDE 5

Existing Conditions

slide-6
SLIDE 6

Existing Conditions

*

slide-7
SLIDE 7

Existing Conditions

*

slide-8
SLIDE 8

Existing Conditions

*

slide-9
SLIDE 9

Existing Conditions

*

slide-10
SLIDE 10

Existing Conditions

*

slide-11
SLIDE 11

Existing Conditions

*

slide-12
SLIDE 12

Existing Conditions

*

slide-13
SLIDE 13

Existing Conditions

*

slide-14
SLIDE 14

Existing Conditions

*

slide-15
SLIDE 15

Existing Conditions

*

slide-16
SLIDE 16

Existing Conditions

*

slide-17
SLIDE 17

Existing Conditions

*

slide-18
SLIDE 18

Existing Conditions

*

slide-19
SLIDE 19

Existing Planning Document

  • Community Board 8 | 197-A Plan for the Queensboro Bridge Area
  • Summer 2006

Existing Conditions

slide-20
SLIDE 20

Existing Conditions

slide-21
SLIDE 21

197-A Plan | Queensboro Bridge Area

  • Over 30 years of planning

“to improve and regenerate precious and vastly underutilized waterfront and open spaces.”

  • “The potential exists to

create a significant extension to the East River Esplanade, incorporating the former sanitation station structure.”

Existing Conditions

slide-22
SLIDE 22

197-A Plan | Queensboro Bridge Area

  • “the concrete-framed

structure would create a well-lit and undercover space”

  • “the rear portion of the

structure for park maintenance uses, including storage space and a parking area for maintenance vehicles”

  • “A seasonal café should

also be considered”

Existing Conditions

slide-23
SLIDE 23

Existing Conditions

slide-24
SLIDE 24

Existing Conditions

slide-25
SLIDE 25

Precedent Examples

Andrew Haswell Green Park – Phase 3

slide-26
SLIDE 26

Design Considerations

  • Human Scale Elements
  • Accommodate Bicycle and Pedestrian Access
  • Accommodate Vehicular Access and Maintenance
  • Flexibility (of Public Program)
  • Resiliency to Sea Level Rise
  • Pedestrian Amenities
  • Public Art
  • Lighting Within Structure
  • Mitigate Sound and Fumes from the FDR
  • Public Safety

Precedent Examples

slide-27
SLIDE 27

Precedent Examples

MAKE IT ABOUT LEISURE

Aarhus, Denmark – Waterfront Promenade

slide-28
SLIDE 28

Precedent Examples

MAKE IT A DESTINATION

Miami – The Underline Bike Repair Kiosk

slide-29
SLIDE 29

Precedent Examples

MAKE IT UNIQUE

Chicago – South Pond Pavilion

slide-30
SLIDE 30

Precedent Examples

MAKE IT UNEXPECTED

Boston – Southeast Expressway Park

slide-31
SLIDE 31

Precedent Examples

MAKE IT A VIBRANT PLACE

Vancouver – JJ Bean Coffee

slide-32
SLIDE 32

Precedent Examples

MAKE IT YEAR ROUND

Washington, D.C. – Watergate Hotel

slide-33
SLIDE 33

Precedent Examples

MAKE IT WELCOMING

Brazil – Atelie Wals Brewery

slide-34
SLIDE 34

Precedent Examples

MAKE IT AN EXPERIENCE

France – New Vieux Port Pavilion

slide-35
SLIDE 35

Precedent Examples

MAKE IT ARTISTIC

Iowa – High Trestle Trail

slide-36
SLIDE 36

Next Steps in Planning

  • 6/27: CB8 meeting (EMG project update)

Present overview and solicit feedback on program

  • Late July

Present (1) draft conceptual plan and solicit feedback

  • Early September

Present final conceptual plan

Next Steps