  1. Andrew Haswell Green Park Phase 3 Conceptual Plan Kick-Off

  2. Andrew Haswell Green Park – Phase 3 Existing Conditions

  3. Existing Conditions

  4. Existing Conditions

  5. Existing Conditions

  6. Existing Conditions *

  7. Existing Conditions *

  8. * Existing Conditions

  9. Existing Conditions *

  10. Existing Conditions *

  11. Existing Conditions *

  12. Existing Conditions *

  13. Existing Conditions *

  14. Existing Conditions *

  15. Existing Conditions *

  16. Existing Conditions *

  17. Existing Conditions *

  18. Existing Conditions *

  19. Existing Planning Document Existing Conditions • Community Board 8 | 197-A Plan for the Queensboro Bridge Area • Summer 2006

  20. Existing Conditions

  21. 197-A Plan | Queensboro Bridge Area Existing Conditions • Over 30 years of planning “to improve and regenerate precious and vastly underutilized waterfront and open spaces.” • “The potential exists to create a significant extension to the East River Esplanade, incorporating the former sanitation station structure.”

  22. 197-A Plan | Queensboro Bridge Area Existing Conditions • “the concrete-framed structure would create a well-lit and undercover space” • “the rear portion of the structure for park maintenance uses, including storage space and a parking area for maintenance vehicles” • “A seasonal café should also be considered”

  23. Existing Conditions

  24. Existing Conditions

  25. Andrew Haswell Green Park – Phase 3 Precedent Examples

  26. Design Considerations Precedent Examples • Human Scale Elements • Accommodate Bicycle and Pedestrian Access • Accommodate Vehicular Access and Maintenance • Flexibility (of Public Program) • Resiliency to Sea Level Rise • Pedestrian Amenities • Public Art • Lighting Within Structure • Mitigate Sound and Fumes from the FDR • Public Safety

  27. MAKE IT ABOUT LEISURE Precedent Examples Aarhus, Denmark – Waterfront Promenade

  28. MAKE IT A DESTINATION Precedent Examples Miami – The Underline Bike Repair Kiosk

  29. MAKE IT UNIQUE Precedent Examples Chicago – South Pond Pavilion

  30. MAKE IT UNEXPECTED Precedent Examples Boston – Southeast Expressway Park

  31. MAKE IT A VIBRANT PLACE Precedent Examples Vancouver – JJ Bean Coffee

  32. MAKE IT YEAR ROUND Precedent Examples Washington, D.C. – Watergate Hotel

  33. MAKE IT WELCOMING Precedent Examples Brazil – Atelie Wals Brewery

  34. MAKE IT AN EXPERIENCE Precedent Examples France – New Vieux Port Pavilion

  35. MAKE IT ARTISTIC Precedent Examples Iowa – High Trestle Trail

  36. Next Steps in Planning Next Steps • 6/27: CB8 meeting (EMG project update) � Present overview and solicit feedback on program • Late July � Present (1) draft conceptual plan and solicit feedback • Early September � Present final conceptual plan

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.