Estero Boulevard I Improvements Project t P j t Lee County DOT - - PowerPoint PPT Presentation

Estero Boulevard I Improvements Project t P j t Lee County DOT In Cooperation with Town of Fort Myers Beach February 18, 2014 Draft 30% Plan Status Summary Estero Blvd ROW Survey y Estero Blvd. l d Analysis & Town of Fort Design


slide-1
SLIDE 1

Estero Boulevard I t P j t Improvements Project

Lee County DOT In Cooperation with Town of Fort Myers Beach

February 18, 2014 Draft 30% Plan Status Summary

slide-2
SLIDE 2

l d Estero Blvd ROW Survey Estero Blvd. Analysis & Design Phase 1 Segment 1 Final Design Town of Fort Myers Beach Incorporated y S 19?? 1995 2008 2000 2013 2015 2014 Segment 1 2007 2010 Streetscape Master Plan Adopted Preliminary Plan Segment 1 Construction Joint T/FMB – BOCC Meeting BOCC Meeting Begin Estero Blvd Project

slide-3
SLIDE 3
  • Currently in Preliminary Design Process
  • Picked up from 2008 effort that was halted in

Picked up from 2008 effort that was halted in

  • rder to complete the ROW survey
  • Based on cross sections in Town’s
  • Based on cross sections in Town s

Streetscape Master Plan with changes approved by Town Council in August 2013 approved by Town Council in August 2013

slide-4
SLIDE 4
  • Will result in 30% Design Plans for entire six

miles from Crescent Street to Big Carlos Pass Bridge

  • Public Workshop held on Beach in Feb 2013

p

  • Based on Comments, presented
  • ptions/limitations to Town Council August
  • ptions/limitations to Town Council August

2013

slide-5
SLIDE 5
  • Town Council provided direction on Plans

Town Council provided direction on Plans in August 30, 2013 letter:

– Sidewalks-both sides entire length Sidewalks both sides entire length – Dedicated bike lanes where Right-of-Way allows – Use shared bicycle lanes “Sharrows” and wider sidewalks where separate bike lane can’t be provided – Center lane/three lane section entire length Mi i i i t ti d i t i t – Minimize interruption during tourist season

slide-6
SLIDE 6
  • Sidewalks – Both sides entire length

Sidewalks Both sides entire length

Included, Widths vary – 9’ to 6’

  • Dedicated Bike Lanes where ROW allows

I l d d i ll t t f th 1 4 Included in all segments except for the 1.4 miles of the Core/Civic Section

slide-7
SLIDE 7
  • Shared Bicycle Lanes “Sharrows” with

Shared Bicycle Lanes Sharrows with wider sidewalks where Bike Lanes can’t be provided be provided

Included Sharrows in Core/Civic Section 9’ sidewalks typically 9 sidewalks typically

slide-8
SLIDE 8
  • Center-Lane/3 Lane Section Entire Length

Center Lane/3 Lane Section Entire Length

Included except for:

  • Locations where Chicanes used for Trolley Stops

Locations where Chicanes used for Trolley Stops

  • Quiet Center 50’ ROW section – Avenida

Pescadore to Lazy Way (1/3 mile approx.)

  • Minimize Interruption during Tourist

Season

– Will be a goal, but Construction will carry into season

slide-9
SLIDE 9
  • Drainage

Drainage

  • Trolley Stops

St t Li hti

  • Street Lighting
  • Landscaping
  • Overhead Utilities
  • ROW Encroachments

ROW Encroachments

slide-10
SLIDE 10
  • Issues can be resolved in subsequent

Issues can be resolved in subsequent design phases.

  • Assistance from Construction Manager at
  • Assistance from Construction Manager at

Risk Will i i ifi t di ti ith

  • Will require significant coordination with

Town, possible amendments of Interlocal A t Agreement

slide-11
SLIDE 11
  • Sequential Design and Construction for

Sequential Design and Construction for each segment, starting at north and working south. working south.

  • Funding every other year

I t d t hi C t ti M t

  • Intend to hire a Construction Manager at

Risk to oversee efforts, ensure di ti coordination

slide-12
SLIDE 12
  • Finalize Preliminary Design Plans

Finalize Preliminary Design Plans

  • Segment 1 selection consistent with Town

Council 2008 recommendation Council 2008 recommendation

  • Funding for Segment 1 Design and

C t ti Ph i C t Fi l Construction Phases in Current Fiscal Year

slide-13
SLIDE 13
  • Contract with TYLin allows issuing STA to

Contract with TYLin allows issuing STA to proceed with Final Design of first segment

  • Design Scope drafted being finalized
  • Design Scope drafted, being finalized
  • STA Requires BOCC approval

– 2 months – Funds remaining in Preliminary Design allows TYLi t t t t d hil iti STA TYLin to get started while awaiting STA approval

slide-14
SLIDE 14
  • Proceed with advertising for and hiring

Proceed with advertising for and hiring Construction Manager at Risk

– Process can take 6 months between Process can take 6 months between advertising/selection/approval process

  • Want them to participate in the Segment 1

Want them to participate in the Segment 1 Design Process

  • Scope for RFQ drafted and being refined
  • Scope for RFQ drafted, and being refined
  • Will hire for Segment 1 with option to add

dditi l t additional segments

slide-15
SLIDE 15
slide-16
SLIDE 16

(Wilson Miller)

North End Civic Complex High Rise Resort Quiet Center Core Area South End

slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21