Estero Grande DESIGN REVIEW BOARD PRESENTATION APRIL 26, 2017 - - PowerPoint PPT Presentation

estero grande
SMART_READER_LITE
LIVE PREVIEW

Estero Grande DESIGN REVIEW BOARD PRESENTATION APRIL 26, 2017 - - PowerPoint PPT Presentation

Estero Grande DESIGN REVIEW BOARD PRESENTATION APRIL 26, 2017 Developer/Applicant: ESTERO GRANDE, LLC STEVE HAGENBUCKLE & MICHAEL DAVIS Project Team Steve Hagenbuckle Owner Estero Grande, LLC Joe McHarris Project


slide-1
SLIDE 1

Estero Grande

DESIGN REVIEW BOARD PRESENTATION APRIL 26, 2017 Developer/Applicant: ESTERO GRANDE, LLC STEVE HAGENBUCKLE & MICHAEL DAVIS

slide-2
SLIDE 2

Project Team

  • Steve Hagenbuckle – Owner – Estero Grande, LLC
  • Joe McHarris – Project Architect – McHarris Planning & Design
  • Sabrina McCabe, PLA – Landscape Architect – Waldrop Engineering
  • Steven Hartsell – Attorney – Pavese Law Firm
  • David Willems, P.E. – Professional Engineer – Waldrop Engineering

April 26, 2017 SLIDE 2

slide-3
SLIDE 3

Presentation Outline

  • Project Background
  • Development Order Application
  • Landscape Buffers
  • Architecture & Pattern Book

November 9, 2016 SLIDE 3

slide-4
SLIDE 4

Project Overview

Site Information:

  • 29.6-acre project site
  • No existing wetlands

Location:

  • Intersection of S. Tamiami Trail

& Estero Parkway

  • Adjacent to Breckenridge, Terra

Vista, and Trailside

SLIDE 4

slide-5
SLIDE 5

Zoning Overview

Approved Resolution Z-14-028

  • Rezoned from RS-1 to Mixed-

Use Planned Development (MPD)

  • 285 Multi-Family Units

(includes up to 108 bonus density units)

  • 9.6 du/ac
  • 100,000 SF of Commercial

Space

  • 45’ Max. Building Height

SLIDE 5

slide-6
SLIDE 6
  • Platting Purposes:
  • Two (2) Commercial Out-Parcels
  • One (1) Multi-Family Tract
  • One (1) Preserve Tract
  • One (1) Lake Tract
  • One (1) Roadway Tract
  • Construction Includes:
  • Limited Clearing
  • Entrance road
  • Off-site improvements (traffic signal and turn lanes)
  • Installation of master utility & drainage infrastructure

Development Order Overview

SLIDE 6

slide-7
SLIDE 7

Development Order Application

SLIDE 7

slide-8
SLIDE 8

Drainage Overview – Existing Conditions

SLIDE 8

slide-9
SLIDE 9

Drainage Overview – Proposed Conditions

SLIDE 9

slide-10
SLIDE 10
  • SFWMD ERP Approved 2/14/17
  • SFWMD Irrigation Permit Approved 10/24/16
  • SFWMD Dewatering Permit Approved 2/15/17
  • Lee County LDO (turn lanes) Approved 4/4/17
  • FDOT Connection Permits Under Review

Other Permit Status

SLIDE 10

slide-11
SLIDE 11

Sabrina McCabe, PLA Waldrop Engineering, P.A.

Landscape B e Buffers

slide-12
SLIDE 12

Landscape Buffer Diagram - MCP

slide-13
SLIDE 13

SLIDE 13

Buffers/Landscape Design Standards

slide-14
SLIDE 14

SLIDE 14

Buffers/Landscape Design Standards

slide-15
SLIDE 15

Materials/Landscape Design Standards

slide-16
SLIDE 16

SLIDE 16

Pedestrian Interface Standards

slide-17
SLIDE 17

SLIDE 17

slide-18
SLIDE 18

Hardscape/Landscape Design Standards cont’d.

slide-19
SLIDE 19

Signage

slide-20
SLIDE 20

Joe McHarris McHarris Planning & Design

Ar Archit itectu ecture & e & Pattern Book

  • k
slide-21
SLIDE 21
slide-22
SLIDE 22
slide-23
SLIDE 23
slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29
slide-30
SLIDE 30
slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33
slide-34
SLIDE 34
slide-35
SLIDE 35
slide-36
SLIDE 36
slide-37
SLIDE 37
slide-38
SLIDE 38
slide-39
SLIDE 39
slide-40
SLIDE 40
slide-41
SLIDE 41
slide-42
SLIDE 42
slide-43
SLIDE 43
slide-44
SLIDE 44
slide-45
SLIDE 45

THANK YOU