ESTATE TUTU REDEVELOPMENT PHASE I DONOE SITE C O M P R E H E N S I - - PowerPoint PPT Presentation

estate tutu redevelopment
SMART_READER_LITE
LIVE PREVIEW

ESTATE TUTU REDEVELOPMENT PHASE I DONOE SITE C O M P R E H E N S I - - PowerPoint PPT Presentation

ESTATE TUTU REDEVELOPMENT PHASE I DONOE SITE C O M P R E H E N S I V E & C O A S T A L Z O N E P L A N N I N G / Z O N I N G M A P N O . S T Z - 7 D O N O E R E D E V E L O P M E N T P A R T N E R S , L L C / V I R G I N I S L


slide-1
SLIDE 1

ESTATE TUTU REDEVELOPMENT

PHASE I – DONOE SITE

V I R G I N I S L A N D S H O U S I N G A U T H O R I T Y / P E N N R O S E , L L C / J A C K S O N D E V E L O P M E N T C O M P A N Y , L L C

C O M P R E H E N S I V E & C O A S T A L Z O N E P L A N N I N G / Z O N I N G M A P N O . S T Z - 7 D O N O E R E D E V E L O P M E N T P A R T N E R S , L L C / V I R G I N I S L A N D S H O U S I N G A U T H O R I T Y P A R C E L N O . 3 B E S T A T E D O N O E , 2 A N E W Q U A R T E R , S T . T H O M A S , V I Z O N I N G A P P L I C A T I O N N O . Z A T - 2 0 - 3 M A Y 2 9 , 2 0 2 0

slide-2
SLIDE 2

REBUILDING AFFORDABLE HOUSING ON ST. THOMAS

PROPOSED PHASE 1 REDEVELOPMENT PROJECT

DONOE ANNA’S RETREAT ESTATE THOMAS TUTU RAPHUNE CHARLOTTE AMALIE EAST ROSENDAHL GRANDVIEW

2

slide-3
SLIDE 3

ORIGINAL DONOE SITE – 300 UNITS

3

  • DEMOLISHED 2001
  • PROPOSED DEVELOPMENT- DENSITY REDUCED FROM 300 UNITS

TO 84 UNITS

slide-4
SLIDE 4

4

PHASE 1 Estate Tutu Redevelopment - DONOE SITE

SITE PLAN RESIDENTIAL DEVELOPMENT – 84 UNITS PHOTOVOLTAIC FARM/ ENERGY CENTER

SITE SECTION

COMMUNITY BUILDING ENTRANCE RECREATION TRAIL

slide-5
SLIDE 5

5

PHASE 1- DONOE SITE

PROPOSED 4 STORY DESIGN PREVIOUS 3 STORY DESIGN

slide-6
SLIDE 6

RENDERING – VIEW OF RESIDENTIAL LOOP ROAD

PHASE 1 Estate Tutu Redevelopment - DONOE SITE

COMMUNITY BUILDING PARKING ENTRANCE RESIDENTIAL BUILDINGS

slide-7
SLIDE 7

RENDERING – VIEW FROM SOUTH

PHASE 1 Estate Tutu Redevelopment - DONOE SITE

COMMUNITY BUILDING RESIDENTIAL BUILDINGS RECREATION TRAIL

slide-8
SLIDE 8

8

PHASE 1- DONOE SITE

Phase I - Donoe

1 BEDROOM / 1 BATH 2 BEDROOM / 1.5 BATH 3 BEDROOM / 2 BATH TOTAL UNITS 44 24 16 84 Gross Sq. Ft. 783-807 1,166 1,347 ACCESSIBLE 3 2 1 6 H/V 1 1 1 BEDROOM / 1 BATH 2 BEDROOM / 1 BATH 3 BEDROOM / 2 BATH Gross Sq. Ft. 644 846 1,050

Former Donoe Units Sizes by Square Footages

slide-9
SLIDE 9

RESIDENTS RECOMMENDATIONS

9

PHASE 1- DONOE SITE

UNIT PLANS:

  • 1. ACCESS TO PORCH FROM MASTER BEDROOM / LIVING ROOM ONLY
  • 2. HURRICANE HARDENED EXTERIOR ENVELOPE
  • 3. AIR CONDITIONING IN UNITS - ALL BEDROOMS INCLUDE AN A/C
  • 4. ADDITIONAL BATHROOMS IN THE 2 AND 3 BEDROOM APARTMENTS
  • 5. ADDED PANTRIES IN ALL KITCHENS

SITE AND COMMUNITY BUILDING:

  • 1. COMMUNITY BUILDING INCLUDES A VARIETY OF AMENITY SPACES FOR EXERCISE, GAMING AND COMPUTER ACCESS, AND INDOOR

AND OUTDOOR RESIDENT GATHERINGS

  • 2. INCREASED PARKING FROM 90 SPACES TO 124 SPACES
  • 3. DESIGN FOR SITE SECURITY

4

CONCRETE WALLS

2 5 1 3

TYPICAL FLOOR PLAN

slide-10
SLIDE 10

10

PHASE 1- DONOE SITE

TYPICAL 1 BEDROOM UNIT PLAN

slide-11
SLIDE 11

11

PHASE 1- DONOE SITE

TYPICAL 2 BEDROOMS UNIT PLAN

slide-12
SLIDE 12

12

PHASE 1- DONOE SITE

TYPICAL 3 BEDROOMS UNIT PLAN

slide-13
SLIDE 13

COMMUNITY BUILDING AND SITE AMENITIES PLANS

GROUND FLOOR

COMMUNITY ROOM FITNESS ROOM MANAGEMENT/ SOCIAL SERVICE OFFICE

13

PHASE 1- DONOE SITE

COMMUNITY GREEN AREA COVERED PORCH RESTROOMS MAINTENANCE SHOP TEEN GAMING

slide-14
SLIDE 14

PHASE 1- DONOE SITE

SITE AMENITIES- COMMUNITY BUILDING OUTDOOR PLAYGROUND & SEATING AREA

14

D

Chess Tables & stools

C

BBQ Grill

B

Outdoor Playground (age 2-12 yrs old equipment)

A

Community center (including fitness center, gaming room and community room)

slide-15
SLIDE 15

PHASE 1- DONOE SITE

SITE AMENITIES

15

3

Community center outdoor play &seating area

1

Gateway streetscape

2

Wellness loop

WALKING LOOP

slide-16
SLIDE 16

APPROACH TO SUSTAINABILITY & RESILIENCE- ENERGY

16

PHASE 1- DONOE SITE

GOALS:

  • MAXIMIZE USE OF NATURAL RESOURCES.
  • MINIMIZE DEPENDENCE ON PUBLIC UTILITIES (ENERGY INDEPENDENCE AND HURRICANE HARDENED SYSTEMS APPROACH)

PHOTOVOLTAIC PANELS LPG TURBINES BATTERY STORAGE

slide-17
SLIDE 17

17

PHASE 1- DONOE SITE

APPROACH TO SUSTAINABILITY & RESILIENCE- BUILDING ORIENTATION GOAL:

  • OPTIMIZE FOR NATURAL VENTILATION, DAYLIGHTING

AND SOLAR RADIATION.

slide-18
SLIDE 18

PROPOSED RECREATION TRAIL

18

PHASE 1- DONOE SITE

BIKING EXERCISE NATURE RUNNING EXPLORE

slide-19
SLIDE 19

19

PHASE 1- DONOE SITE

SCHEDULE FOR CONSTRUCTION START

May 29th 2020 Legislative Session– Legislative Rezoning Hearing June 2020 Legislative Session – Vote

  • n Rezoning

Bill July 2020 - Governor Signature of Approved Rezoning Bill into law July 2020 – Permit Drawing Application to Department of Planning and Natural Resources August 2020 – Construction Start February 2022 – First buildings ready for occupancy August 2022 – 100% Construction completion

slide-20
SLIDE 20

RENDERING – VIEW OF RESIDENTIAL LOOP ROAD

PHASE 1- DONOE SITE

COMMUNITY BUILDING PARKING ENTRANCE RESIDENTIAL BUILDINGS

slide-21
SLIDE 21

RENDERING – VIEW FROM SOUTH

PHASE 1- DONOE SITE

COMMUNITY BUILDING RESIDENTIAL BUILDINGS RECREATION TRAIL

slide-22
SLIDE 22

THANK YOU