Ernie Lewis elewis@bnl.gov Atmospheric System Research (ASR) - - PowerPoint PPT Presentation

ernie lewis elewis bnl gov atmospheric system research
SMART_READER_LITE
LIVE PREVIEW

Ernie Lewis elewis@bnl.gov Atmospheric System Research (ASR) - - PowerPoint PPT Presentation

Ernie Lewis elewis@bnl.gov Atmospheric System Research (ASR) Science Team Meeting Potomac, MD Wednesday, March 20, 2013, 7:00-8:30 pm Agenda MAGIC Overview and Status Ernie Lewis Logistics and Layout of AMF2 during MAGIC Nicki Hickmon


slide-1
SLIDE 1
slide-2
SLIDE 2

Ernie Lewis elewis@bnl.gov

Atmospheric System Research (ASR) Science Team Meeting Potomac, MD Wednesday, March 20, 2013, 7:00-8:30 pm

slide-3
SLIDE 3

Agenda

MAGIC Overview and Status Ernie Lewis Logistics and Layout of AMF2 during MAGIC Nicki Hickmon Correcting Radar Data for Ship Motion Karen Johnson A First Look at MAGIC Cloud Radar Doppler Spectra Ed Luke Preliminary Analysis of Cloud, Precipitation, and Boundary-Layer Structure Observations during MAGIC Pavlos Kollias Early Results from the MAGIC Radiosonde Data Maureen Dunn Energy Fluxes during MAGIC Mike Reynolds How Can Shortwave Hyperspectral Observations Complement Phase II of MAGIC? Patrick McBride

slide-4
SLIDE 4

Overview and Status

Ernie Lewis

slide-5
SLIDE 5

MAGIC: Marine ARM GPCI Investigation of Clouds

MAGIC route with annual average low-level cloud cover, GPCI transect, & CGILS points.

From Teixeira et al., J. Climate, 2011

slide-6
SLIDE 6

Models Exhibit Some Disagreement

from Teixeira et al., 2011

For JJA 1998 along GPCI Ensemble results from 23 models; mean plus or minus standard deviation Range extends from minimum to maximum values.

slide-7
SLIDE 7

70% of Earth’s surface is covered by oceans

slide-8
SLIDE 8

70% of Earth’s surface is covered by oceans

slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11

Mark, Tom, Brett, Pat

slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16

Sonde Launch Spreadsheet

slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
  • 1000

1000 2000 3000

CAPE (+) and CIN (-), J/kg

Leg 03 Leg 04 Leg 05 Leg 06 Leg 07 Leg 08 Leg 09

Convective Available Potential Energy (CAPE) and Convective INhibition (CIN)

  • 160 -150 -140 -130 -120

Longitude (degrees)

Graph courtesy Tami Toto

slide-20
SLIDE 20

Instruments 03A 03B 04A 04B 05A 05B 06A 06B 07A 07B 08A 08B 09A 1290rwp M C M C 1 n c c s

  • a

M C 2 7 7 3 c p c s

  • a

aoshtdma CM Comms CM CM M C M C M C r g d i m u h s

  • a

aosmet M C e n

  • z
  • s
  • a

M C M C M C w 3 p a s p s

  • a

M C s m m

  • C

M C s a s h u s

  • a

assist csphot irt kazr M C M C M C c e p s r z a k MWACR MWACR M C M C c e p S met mplpols mwr M C c 3 r w m nav No/Go No/GNo/GNo/Go prp Comm Comms rph rpy sasze sonde M C i s t vceil25k Parsivals M C R A S I

Instrument Status by Leg

slide-21
SLIDE 21
slide-22
SLIDE 22

Average Particle Radius (UHSAS)

Gunnar Senum

slide-23
SLIDE 23

Average Radius from UHSAS

slide-24
SLIDE 24

Atmospheric Rivers

Marty Ralph Julian Day 334 (AM) – 29 Nov 2012

331 332 333 334

g/cm3

1 2 3 4 5 6

slide-25
SLIDE 25

Disdrometer Results

Mary Jane Bartholomew Parsivel 2 Particle, size, velocity

slide-26
SLIDE 26

Disdrometer Comparison

Mary Jane Bartholomew

w These results are based upon 1 minute drop counts with a minimum of 60 drops observed.

slide-27
SLIDE 27

MAGIC Data Products – Prioritization Needed

Jennifer Comstock

MAGIC-Specific (requires development):

Motion-corrected Doppler spectra (Karen Johnson) IRT Sea Surface Temperature (L. Riihimaki) Bulk Aerodynamic Fluxes Motion-corrected MPL data Geolocation Best Estimate

Standard VAPs

Cloud boundaries (ARSCL; MPLCMASK) Doppler moments analysis (MICROARSCL) MWR LWP & PWV QC radiation data CCN profiles PBL height SW flux best estimate

slide-28
SLIDE 28

MAGIC Timetable

Sept, 2012 start setup on Spirit Oct, 2012 MAGIC deployment officially begins Jan, 2013 uninstall May, 2013 re-install July, 2013 IOP Sept., 2013 MAGIC deployment finishes

slide-29
SLIDE 29

MAGIC Timetable

Sept, 2012 start setup on Spirit Oct, 2012 MAGIC deployment officially begins Jan, 2013 uninstall May, 2013 re-install July, 2013 IOP Sept., 2013 MAGIC deployment finishes Oct., 2013 onward MAGIC-Lite? (PRP, met, VCeil, MWR, ISAR) MAGIC-2?

slide-30
SLIDE 30

Thank you.

slide-31
SLIDE 31

Thanks to: Horizon

DOE/Wanda and crew Techs Argonne AMF2 team Mentors Data people Others

slide-32
SLIDE 32

Additional Information

Ernie Lewis: elewis@bnl.gov Updates (~bi-weekly) Websites:

http://www.bnl.gov/envsci/ARM/MAGIC http://www.arm.gov/campaigns/amf2012magic http://www.rmrco.com/cruise/magic/

Posters: #17 – Rich Coulter #62 – Vic Morris #35 – Maureen Dunn #63 – Mary Jane Bartholomew #60 - Mike Ritsche #64 – Donna Holdridge #61 – David Troyan #168 – Pavlos Kollias

slide-33
SLIDE 33