ENKA IN GEORGIA

Engineering for a Better Future

slide-2
SLIDE 2

2

  • f 9

PROJECTS in georgia

slide-3
SLIDE 3

3

  • f 9

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Project Location Client Commence Date Completion Date Contract Price Details SCPX Early Works & Facilities Project ENKA - Bechtel JV Multiple Locations – Georgia South Caucasus Pipeline Company (SCP Co.-Consortium between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO) February 2014 October 2019 US$ 878,000,000 Early works, the construction of compressor stations Georgia 1 & 2 and the pressure reduction, and metering facility SCPX Early Works & Facilities Project CIMTAS Pipe - CİMTAŞ Module & Shipyard Multiple Locations – Georgia ENKA - Bechtel (USA) JV 2015 2017 Euro 36,759,763 Piping Layout and Spool Fabrication, Engineering, Procurement and Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81) Namakhvani Hydro Power Plant Cascade Project ENKA - Clean Energy Group Namakhvani - Georgia Georgian Government 40 Months US$ 750,000,000 Develop, construct, own and operate Gardabani 2-Unit 1 (System 6FA) CIMTAS Ningbo Gardabani - Georgia GE Energy Products Europe May 2018 (Shipment Date) Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing Gardabani 2-Unit 2 (System 6FA) CIMTAS Ningbo Gardabani - Georgia GE Energy Products Europe May 2018 (Shipment Date) Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing Poti Port Petroleum Products Storage & Handling Terminal Project Kasktaş Poti - Georgia ÜSTAY Construction- Contracting and Trading Company December 2001 December 2002 US$ 1,000,000 Soil Improvement Works

Projects ın Georgıa

slide-4
SLIDE 4

4

  • f 9

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

  • Location: Georgia
  • Client: South Caucasus Pipeline Company Ltd. Consortium

between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO)

  • Construction Period: Feb 2014 – Oct 2019
  • Project Value: US$ 878 Million
  • Project Description:

A joint venture between Bechtel and ENKA was awarded the SCPX Early Works and Facilities contract and responsible for the construction of two Compressor Stations (CSG-1 and CSG-2) and a Pressure Reduction and Metering Station (AREA 81) at three different locations within Georgia, and for all related early civil works and facilities. The early works stage for Compressor Station 2 (CSG-2) includes the construction of a 15 km access road between the existing Millennium Highway and the compressor station. The Bechtel-ENKA Joint Venture’s scope of works also includes the supply and fabrication of all structural steel and fabrication of all piping including the pipeline connection sections to the South Caucasus Pipeline.

SCPX – Area 81 Project was awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”

SCPX Early Works and Facilities Project - Georgia

Not by ENKA Partially by ENKA Fully by ENKA Main Work Item Quantity Unit FEED Engineering Procurement Transport & Logistic Fabrication Construction Process Buildings 20,900 m² Non-process Buildings 2,700 m² Concrete works 74,000 m³ Steel works 14,500 ton Pipe works 7,400 ton

slide-5
SLIDE 5

5

  • f 9

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

  • Client : Bechtel – ENKA JV
  • Construction Period : 2015-2017
  • Project Value : Euro 37 Million
  • ÇİMTAŞ’s Scope of Works : Piping Layout and Spool Fabrication, Engineering, Procurement and

Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81)

  • Scope Details :

Pipe Spool : 5,700 tons Steel Structure : 8,400 tons

South Caucasus Pıpelıne (SCPX)

slide-6
SLIDE 6

6

  • f 9

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Namakhvani HPP Cascade - Georgia

On April 25, 2019, the Build-Operate Agreement was signed with the Government of Georgia for the development, construction, ownership and

  • peration of the Namakhvani Cascade HEPP Project

in Georgia, where 90% of it is owned by ENKA. Namakhvani Cascade HEPP Project consists of two separate hydroelectric power plants, namely Namakhvani HEPP (333 MW) and Tvishi HEPP (100 MW) on the Rioni River of Georgia and a total investment of 750 million US Dollars is projected. After the plant is operative, with the 15-year Power Purchase Agreement, the production will be done under the state guarantee for the eight months period between September and April of the year. Following the completion of the necessary permits, the construction of the project will begin and the plant is planned to be commissioned in 2023.

Location : Kutaisi - Georgia Scope : EPC, Lump Sum Turnkey Commencement : 2019 Completion : 2023 Client : Clean Energy Group Georgia

slide-7
SLIDE 7

7

  • f 9

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

Human Resources (SCPx Project)

Technical Staff 49 Administrative Staff 44 Craft 653 Total 746

21% 2% 7% 23% 34% 12% 1%

% of Construction Machinery & Equipment & Marine fleet

LIFTING EQUIPMENT CONCRETE PRODUCTION AND MATERIAL PREPERATION EARTH MOVING MACHINES TRANSPORTATION EQUIPMENT ENERGY GENERATION AND DISTRIBUTION EQUIPMENT SUPPORT EQUIPMENT OTHER MACHINERY,FACILITIES FOR CONSTRUCTION SITES

Resources ın Georgia

slide-8
SLIDE 8

8

  • f 9

Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349

ENKA received the 2018 ENR Global Best Project Award under Power / Industrial Category for its SCPX Area 81 Project, located in Georgia SPCX – Area 81 Project has been awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”; which clearly demonstrates the project’s commitment to the health, safety and wellbeing of its workforce Compressor Stations Georgia-1 and Compressor Stations Georgia-2 sites of SCPX project both achieved 6,000,000 man-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety Award 2017 was presented to ENKA-Bechtel JV in recognition of good

  • verall safety performance

Award & Achıevements