ENKA IN GEORGIA
Engineering for a Better Future
ENKA IN GEORGIA PROJECTS in georgia of 9 2 Projects n Georga - - PowerPoint PPT Presentation
Engineering for a Better Future ENKA IN GEORGIA PROJECTS in georgia of 9 2 Projects n Georga Commence Completion Date Contract Project Location Client Details Date Price SCPX Early Works & Multiple Locations South
Engineering for a Better Future
2
3
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349
Project Location Client Commence Date Completion Date Contract Price Details SCPX Early Works & Facilities Project ENKA - Bechtel JV Multiple Locations – Georgia South Caucasus Pipeline Company (SCP Co.-Consortium between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO) February 2014 October 2019 US$ 878,000,000 Early works, the construction of compressor stations Georgia 1 & 2 and the pressure reduction, and metering facility SCPX Early Works & Facilities Project CIMTAS Pipe - CİMTAŞ Module & Shipyard Multiple Locations – Georgia ENKA - Bechtel (USA) JV 2015 2017 Euro 36,759,763 Piping Layout and Spool Fabrication, Engineering, Procurement and Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81) Namakhvani Hydro Power Plant Cascade Project ENKA - Clean Energy Group Namakhvani - Georgia Georgian Government 40 Months US$ 750,000,000 Develop, construct, own and operate Gardabani 2-Unit 1 (System 6FA) CIMTAS Ningbo Gardabani - Georgia GE Energy Products Europe May 2018 (Shipment Date) Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing Gardabani 2-Unit 2 (System 6FA) CIMTAS Ningbo Gardabani - Georgia GE Energy Products Europe May 2018 (Shipment Date) Euro 41,000 Pipe and pipe fittings procurement and receiving inspection, Cutting and drilling, Fit-up and welding, Visual check, Non-destructive examination and Inspection, Pressure test, Pickling & Passivation, Corrosion Protection, Painting and Coating, Preservation and Packing Poti Port Petroleum Products Storage & Handling Terminal Project Kasktaş Poti - Georgia ÜSTAY Construction- Contracting and Trading Company December 2001 December 2002 US$ 1,000,000 Soil Improvement Works
4
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349
between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO)
A joint venture between Bechtel and ENKA was awarded the SCPX Early Works and Facilities contract and responsible for the construction of two Compressor Stations (CSG-1 and CSG-2) and a Pressure Reduction and Metering Station (AREA 81) at three different locations within Georgia, and for all related early civil works and facilities. The early works stage for Compressor Station 2 (CSG-2) includes the construction of a 15 km access road between the existing Millennium Highway and the compressor station. The Bechtel-ENKA Joint Venture’s scope of works also includes the supply and fabrication of all structural steel and fabrication of all piping including the pipeline connection sections to the South Caucasus Pipeline.
SCPX – Area 81 Project was awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”
Not by ENKA Partially by ENKA Fully by ENKA Main Work Item Quantity Unit FEED Engineering Procurement Transport & Logistic Fabrication Construction Process Buildings 20,900 m² Non-process Buildings 2,700 m² Concrete works 74,000 m³ Steel works 14,500 ton Pipe works 7,400 ton
5
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349
Fabrication of Steel Structure for Compressor Station Georgia-1 & 2 (CSG-1 & CSG-2) and the Pressure Reduction and Metering Facility (AREA 81)
Pipe Spool : 5,700 tons Steel Structure : 8,400 tons
6
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349
On April 25, 2019, the Build-Operate Agreement was signed with the Government of Georgia for the development, construction, ownership and
in Georgia, where 90% of it is owned by ENKA. Namakhvani Cascade HEPP Project consists of two separate hydroelectric power plants, namely Namakhvani HEPP (333 MW) and Tvishi HEPP (100 MW) on the Rioni River of Georgia and a total investment of 750 million US Dollars is projected. After the plant is operative, with the 15-year Power Purchase Agreement, the production will be done under the state guarantee for the eight months period between September and April of the year. Following the completion of the necessary permits, the construction of the project will begin and the plant is planned to be commissioned in 2023.
Location : Kutaisi - Georgia Scope : EPC, Lump Sum Turnkey Commencement : 2019 Completion : 2023 Client : Clean Energy Group Georgia
7
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349
Human Resources (SCPx Project)
Technical Staff 49 Administrative Staff 44 Craft 653 Total 746
21% 2% 7% 23% 34% 12% 1%
% of Construction Machinery & Equipment & Marine fleet
LIFTING EQUIPMENT CONCRETE PRODUCTION AND MATERIAL PREPERATION EARTH MOVING MACHINES TRANSPORTATION EQUIPMENT ENERGY GENERATION AND DISTRIBUTION EQUIPMENT SUPPORT EQUIPMENT OTHER MACHINERY,FACILITIES FOR CONSTRUCTION SITES
8
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69 Web: www.enka.com E-mail: enka@enka.com Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10 Besiktas, Istanbul, Turkey 34349
ENKA received the 2018 ENR Global Best Project Award under Power / Industrial Category for its SCPX Area 81 Project, located in Georgia SPCX – Area 81 Project has been awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”; which clearly demonstrates the project’s commitment to the health, safety and wellbeing of its workforce Compressor Stations Georgia-1 and Compressor Stations Georgia-2 sites of SCPX project both achieved 6,000,000 man-hours without a lost-time incident Area-81 of SCPX project is completed without a lost-time incident, reaching 3,000,000 man-hours British Petroleum Georgia Safety Award 2017 was presented to ENKA-Bechtel JV in recognition of good
Balmumcu Mahallesi, Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul T: +90 (212) 376 10 00 (pbx); F: +90 (212) 272 88 69 W: www.enka.com