FACILITIES COMMITTEE PRESENTATION TO THE
EDUCATION 3/10/2014 Facility Committee Committee Members - - PowerPoint PPT Presentation
FACILITIES COMMITTEE PRESENTATION TO THE BOARD OF EDUCATION 3/10/2014 Facility Committee Committee Members Kristine Chalifoux Amy Lozar Lynn Stuckey Arlene Vespa Mark Ritz Ex Officio Avona Greene PJ Trautman
3/10/2014
FACILITIES COMMITTEE PRESENTATION TO THE
Committee Members
Vespa
Facility Committee
Participants
AGENDA
Facilities Committee
DeJong Richter Study
Consider options for each of the facilities included in this analysis and develop a recommended facilities plan, based on Facility Committee input and a cost/benefit analysis, to present to the Board of Education.
Presentation to the Board of Education 3/10/2014
Physical Needs Educational Needs
What is the physical condition of the building?
EDUCATIONAL ADEQUACY
Does the learning environment support the educational program?*
* Determined by the standards as defined in the Strategic Plan (Great Schools Together).
Building A Building B Building C Building A Building B Building C
Remodel Addition Repurpose Retire New
SCENARIO
Life Cycle Costs
(including first costs, energy costs, O&M costs, and renewal costs)
Scenarios
configuration
Recommendations 10/17/13 10/24/13 11/14/13 11/2013 2/20/14
Projected Enrollments
2022-2023 projected* K-5: 4780
6-8: 2244 9-12: 3207
*DeJong Richter projected enrollment data
Presentation to the Board of Education 3/10/2014
Scenario Name Description Scenario 1 New Dr. Howard, K-8 at Barkstall, Central as Edison & Career Prep Scenario 2 Reuse Edison by remodeling Scenario 3 Single high school, do not reuse Central Scenario 4 Reuse Edison and Dr. Howard, build 4th middle school Scenario 5 Career prep at each high school Scenario 6 Maintain current sites by remodeling and replacing Central in the same location Scenario 7 Create 2 K-8 models Scenario 8 All new work creates K-8 elementary schools Scenario 9 Reduce to 2 middle schools and create more K-8, centralize district functions at Central Scenario 10 Focus on high priority maintenance Scenario 11 Make Central a K-8 and curriculum center
Scenario Name Description Scenario 12 3 middle schools, no K-8 Scenario 13 4 middle schools, no K-8 Scenario 14 4 middle schools, renovate Edison Scenario 15 4 middle schools, renovate existing, minimum work
PROS LIMITATIONS RECOMMENDATIONS
curricular activities
range and needs of teachers and staff members
elementary building is converted to K-8. If a new facility is built for K-8 or an existing building is renovated in the future for this population, these needs can be included in the upfront programming of the facility.
recommended that the District go with one or the other, but provide the K-8 as an option for families, similar to how balanced calendar is currently provided.
FINAL SCENARIOS
Presentation to the Board of Education 3/10/2014
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
SCENARIO 1
3 Middle Schools + 1 K-8
$55,400,000 1700 Students Ed Ad – 95.2 Area – 312,579 Sq Ft $90,200,000 1700 Students Ed Ad – 97..5 Area – 306,000 Sq Ft $267,313,747SCENARIO 5
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
3 Middle Schools + 1 K-8
SCENARIO 8
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
3 Middle Schools + 1 K-8
$55,400,000 1700 Students Ed Ad – 95.2 Area – 312,579 Sq Ft $90,200,000 1700 Students Ed Ad – 97..5 Area – 306,000 Sq Ft $286,516,233SCENARIO 9
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
2 Middle Schools + 4 K-8
$55,400,000 1700 Students Ed Ad – 95.2 Area – 312,579 Sq Ft $90,200,000 1700 Students Ed Ad – 97..5 Area – 306,000 Sq Ft $298,074,086SCENARIO 12
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
3 Middle Schools
$55,400,000 1700 Students Ed Ad – 95.2 Area – 312,579 Sq Ft $90,200,000 1700 Students Ed Ad – 97..5 Area – 306,000 Sq Ft $257,360,739SCENARIO 13
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
4 Middle Schools
$55,400,000 1700 Students Ed Ad – 95.2 Area – 312,579 Sq Ft $90,200,000 1700 Students Ed Ad – 97..5 Area – 306,000 Sq Ft $274,382,120SCENARIO 14
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
4 Middle Schools
$55,400,000 1700 Students Ed Ad – 95.2 Area – 312,579 Sq Ft $90,200,000 1700 Students Ed Ad – 97..5 Area – 306,000 Sq Ft $264,926,406SCENARIO 15
ADDITION RENOVATE RETIRE NEW REPURPOSE DO NO THING
4 Middle Schools
Final Scenarios
Final Scenarios
Presentation to the Board of Education 3/10/2014