EAST JAPAN RAILWAY COMPANY (JR East) S 612 Operating 4,658 Line - - PowerPoint PPT Presentation
EAST JAPAN RAILWAY COMPANY (JR East) S 612 Operating 4,658 Line - - PowerPoint PPT Presentation
JR Easts Shinkansen EAST JAPAN RAILWAY COMPANY (JR East) S 612 Operating 4,658 Line (mile) JR Easts Business Area C 4,046 S 35 No. of 1,697 Stations C 1,662 Aomori S 307 No. of Trains / 12,527 day
Narita Choshi Nikko Iwaki Aomori Akita Odate Higashi-Noshiro Hachinohe Morioka Kitakami Yokote Omagari Ishimaki Shinjo Koriyama Mito Niigata Naoetsu Nagaoka Nagano Matsumoto Shiojiri Atami Ito Kofu Hachioji Shin-Maebashi Omiya Yonezawa Aizuwakamatau Fukushima Kisarazu Tokyo Chiba Yamagata Sendai Ichinoseki Hanamaki Utsunomiya Oyama Takasaki
JR East’s Business Area
Oyama Toride Narita Ueno Tokyo Odawara Ito Atami Omiya Narita Airport Takao Mito Ome Chiba Yokohama
Greater Tokyo Area
Takasaki Ofuna
JR East’s Business Area
S:Shinkansen C:Conventional Lines (Fiscal year 2003) Operating Line (mile) 4,658 S: 612 C: 4,046
- No. of
Stations 1,697 S: 35 C: 1,662
- No. of Trains /
day 12,527 S: 307 C: 12,220 Passenger- mile (annual) 78.5 billion S: 11.7 C: 66.8 Revenue 17.25 billion USD S: 4.24 C: 13.01
100 mile
Shinkansen Conventional lines
Tohoku Shinkansen
Shinjo Niigata Yamagata Nagano Sendai Akita Morioka Fukushima Hachinohe Takasaki Omiya Ueno Tokyo
Joetsu Shinkansen Nagano Shinkansen Akita Shinkansen Yamagata Shinkansen
JR East’s Shinkansen Network
369 mile The numbers in the figure indicate the distance from Tokyo Station. 390 mile 253 mile 204 mile 188 mile 141 mile 0 mile
JR East’s Shinkansen Trains
E3 Series
Through-operation type
/ Through-operation on Shinkansen and conventional lines / Maximum operating speed: 172 mph on Shinkansen, 82 mph
- n conventional lines
E4 Series
Large volume transportation type
/ The double-deck trains. / Operation of 16-car configuration is possible by coupling two E4 Series 8-car configurations. The Seat capacity is 1,634, the largest in the world. E2 Series
Higher-speed type
/ Provides passengers with better service by cutting its travel time / Maximum operating speed: 172 mph / Low-noise train We have 6 types of Shinkansen trains, such as....
Coupling and Uncoupling Shinkansen Trains at Morioka Station (Akita Shinkansen)
(Section between Tokyo and Fukushima) / Series E2 and E3 are coupled / Maximum Operating speed: 150 mph
Coupling & Uncoupling
(Section between Yamagata and Fukushima) / Series E3 type are operated / Maximum Operating Speed: 82 mph
Tokyo Fukushima Yamagata Sendai
(At Fukushima station) / Passengers do not need to change trains. 369 mile 225 mile 0 mile
Coupling and Uncoupling Shinkansen Trains at a junction station
Coupling & Uncoupling
Los Angeles A junction station San Francisco Sacramento
Coupling and uncoupling
Train stopping time at station at the time of uncoupling 2.5 min.
at the time of coupling 1.5 min.
Coupling & Uncoupling system
Only a train driver and a conductor do this task
Coupling & Uncoupling for a short time
Niigata Nagano Akita Hachinohe Tokyo
Better Performance Allows for Higher Transportation Volume
Tokyo – Nagano (141 mile)
3 h 05 m
- 102 min
1 h 23 m
Tokyo – Hachinohe (369 mile)
4 h 03 m
- 67 min
2 h 56 m
Sendai Fukushima Morioka
Tokyo – Akita (390 mile)
5 h 06 m
- 77 min
3 h 49 m
Takasaki
Tokyo – Yamagata (225 mile)
3 h 23 m
- 53 min
2 h 30 m Travel time in 1987 Travel time in 2003
Yamagata
Trends o
- f Shares o
- f JR East and a
airlines (Be Before and after Shinkansen s service started) Shinkansen has an a advantage.
JR East Airlines
Aomori Akita Yamagata Tokyo
Tokyo - Yamagata (Yamagata Shinkansen) 24% 76% 1% 99%
1991 2003
Tokyo - Akita (Akita Shinkansen)
52% 48%
46% 54%
1996 2003 2002
46% 54%
Tokyo- Aomori ( Tohoku Shinkansen)
57% 43%
2003
Competition with Airlines
24% 76%
1% 99%
1991 2003
24% 76%
1% 99%
1991 2003
24% 76%
1% 99%
1991 2003