School Committee Meeting Presentation
H I G H S C H O O L BMC
DURFEE
November 21, 2017
DURFEE BMC H I G H S C H O O L Project Timeline MSBA A FAS - - PowerPoint PPT Presentation
School Committee Meeting Presentation November 21, 2017 DURFEE BMC H I G H S C H O O L Project Timeline MSBA A FAS Meeting Schema mati tic Design July 27, 2017 January 3, 2018 November 21, 2017 Project Review Meeting Schematic Design
School Committee Meeting Presentation
H I G H S C H O O L BMC
November 21, 2017
H I G H S C H O O L
Project Timeline
2013
April 20, 2017 Feasibility Study report (Module 3) submitted to the Massachusetts School Building Authority (MSBA).Feasibi bility ty Study y (PDP)
2014
June 29, 2017 Preferred Schematic Study & Report (PSR - Module 3) submitted to the MSBAPrefer ferred Schematic Study dy and Report
March 2018
City y Vot
e to Appro rove e Pro roject ct Fundin nding
August 16, 2017 Massachusetts School Building Authority (MSBA) Board of Directors unanimously approved Preferred Schematic Solution.MSBA BA Board rd Appr proves s Pref eferred erred Schema ematic tic Solut ution
2015
January 3, 2018 Schematic Design (Module 4) submission to the MSBA.Schema mati tic Design
September 2022
Building ding Occup upancy ancy
MSBA Project Scope & Budget (PS&B) Conf. January 2018 Design Development (DD) thru Construction Documents (CD) PhaseDesign Phase
January 14, 2015 MSBA Board of Directors voted to issue an invitation to enter into the Eligibility PeriodFall River INVITED Into Eligibility ty Pe Period
2013 Fall River submitted a Statement of Interest to the MSBA. – NOT INVITEDSOI #1 BMC
DURFEE
2016 2017 2018 2022 2019
April 9, 2014 Fall River submitted a Statement of Interest to the MSBA.SOI #2
2014 MSBA conducts site walkthrough of existing BMC Durfee site.MSBA “Senior Study” Site te Re Review
November 18, 2015 MSBA Board of Directors voted to issue an invitation to enter into the Feasibility Study PhaseFall River INVITED Into Feasibi bility ty Study dy
July 27, 2017 Project Review Meeting with the MSBA Facilities Assessment SubcommitteeMSBA A FAS Meeting
Summer 2018 - 2019 Construction of new building and renovationConst stru ruction
November 21, 2017
H I G H S C H O O L
BMC
DURFEE Site Selection Evaluation
Industrial Park Site Duro Mills Site BMC Durfee High School Anawan Mills Site 10 Lewiston Street (Fall River DPW)
ll
mental al Contam amin inat ation ion
al Cost to Purchas ase
rictions
ies
(not enough buildable area) (NOT conducive to a school environment)
63.86 Acres 16 Acres 5.6 Acres 6.1 Acres 22 Acres
OPTION 2A OPTION 2B
H I G H S C H O O L
BMC
DURFEE Summary of Options Studied – Existing Durfee Site
OPTION 1A OPTION 1B OPTION 1C OPTION 1E
NEW CONSTRUCTION
OPTION 1D
RENOVATION & NEW CONSTRUCTION
Schematic Design Phase
H I G H S C H O O L
BMC
DURFEE
OPTION 1E
Since the Last School Committee presentation…..
ding Prog
rammin ing g Meetin ings gs with h User Grou
ps
ministratio ion/Se /Secu curit ity
idance nce
cial Educat catio ion
thletics tics / Phys ysical ical Educat catio ion
e Arts ts / Performin ming Arts ts
ic
truction ction Craf aft
linary y Arts ts / Trad adewind ewinds
l Design Commu munica icatio ions
metolo logy
D TV
ence (gener neral l educa catio tion, n, obser ervat vator
, plan aneta etariu rium) m)
lth Assis isting ting
vironment mental al Scienc ence
ineerin eering Tech chnolo logy
arly ly Educa catio tion & Car are
keting
ary y Media ia Specialist cialist
eral l classrooms ms
ent/St /Staff aff Colla llaborat atio ion spaces ces
todia ial l / Main intena enance ce
Meetings
Over
Schematic Design Phase
H I G H S C H O O L
BMC
DURFEE
OPTION 1E
Since the Last School Committee Presentation…..
ical / Electrical rical / Plumbing / FP Coordin inat ation ion Meetings with Dist strict rict & City Person
y & Security ity Coordin inati ation
s with Distric rict & City Person
l River r Fire and Police ce Coordin inati ation
ity Coordin inati ation
l River r Water r / Sewer Depar artme ment
ity Forums
ittee ee Meetings
atory / Histor
ic Telescop cope Meeting
Sub-surfa face e Investig igat ation ion Coordin inat ation ion Meetings
l River r Offic ice of Economi
c Developm lopmen ent Presentatio ation
s Incorpor
ated ed Meeting relat ated ed to Early rly Education ion & Care e spaces 75
Meetings
Over
H I G H S C H O O L
DURFEE
BMC
SITE PLAN
North Arrow
Secondary Entry Lobby 3-story Atrium Elsbree Street Driscoll Arena Spencer Borden Elementary School Performing Arts / Music Student Dining / CulinaryH I G H S C H O O L
BMC
DURFEE
CONCEPTUAL 3D RENDERING
ELSBREE STREET LOOKING SOUTH TOWARD MAIN ENTRANCE
H I G H S C H O O L
BMC
DURFEE
CONCEPTUAL 3D RENDERING
ELSBREE STREET LOOKING NORTH TOWARD MAIN ENTRANCE
H I G H S C H O O L
BMC
DURFEE
MILL BLDG. PRECEDENTS
SCHEMATIC INTERIOR PERSPECTIVES Examples…. Flint Cotton Mill Borden Mills American Printworks Sanford Spinning Company
H I G H S C H O O L
BMC
DURFEE
ATRIUM
SCHEMATIC INTERIOR PERSPECTIVES
H I G H S C H O O L
BMC
DURFEE
ATRIUM
SCHEMATIC INTERIOR PERSPECTIVES
H I G H S C H O O L
BMC
DURFEE
ATRIUM
SCHEMATIC INTERIOR PERSPECTIVES
H I G H S C H O O L
BMC
DURFEE
SECONDARY LOBBY
SCHEMATIC INTERIOR PERSPECTIVES
H I G H S C H O O L
BMC
DURFEE
2,570 students 501,330
Gross Square Footage
BMC BMC Durfee Hi Durfee High Sc gh School hool Total Project Cost
Approximately Propos posed ed
City Portion
Approximately