DURFEE BMC H I G H S C H O O L Project Timeline MSBA A FAS - - PowerPoint PPT Presentation

durfee
SMART_READER_LITE
LIVE PREVIEW

DURFEE BMC H I G H S C H O O L Project Timeline MSBA A FAS - - PowerPoint PPT Presentation

School Committee Meeting Presentation November 21, 2017 DURFEE BMC H I G H S C H O O L Project Timeline MSBA A FAS Meeting Schema mati tic Design July 27, 2017 January 3, 2018 November 21, 2017 Project Review Meeting Schematic Design


slide-1
SLIDE 1

School Committee Meeting Presentation

H I G H S C H O O L BMC

DURFEE

November 21, 2017

slide-2
SLIDE 2

H I G H S C H O O L

Project Timeline

2013

April 20, 2017 Feasibility Study report (Module 3) submitted to the Massachusetts School Building Authority (MSBA).

Feasibi bility ty Study y (PDP)

2014

June 29, 2017 Preferred Schematic Study & Report (PSR - Module 3) submitted to the MSBA

Prefer ferred Schematic Study dy and Report

March 2018

City y Vot

  • te

e to Appro rove e Pro roject ct Fundin nding

August 16, 2017 Massachusetts School Building Authority (MSBA) Board of Directors unanimously approved Preferred Schematic Solution.

MSBA BA Board rd Appr proves s Pref eferred erred Schema ematic tic Solut ution

  • n

2015

January 3, 2018 Schematic Design (Module 4) submission to the MSBA.

Schema mati tic Design

September 2022

Building ding Occup upancy ancy

MSBA Project Scope & Budget (PS&B) Conf. January 2018 Design Development (DD) thru Construction Documents (CD) Phase

Design Phase

January 14, 2015 MSBA Board of Directors voted to issue an invitation to enter into the Eligibility Period

Fall River INVITED Into Eligibility ty Pe Period

2013 Fall River submitted a Statement of Interest to the MSBA. – NOT INVITED

SOI #1 BMC

DURFEE

2016 2017 2018 2022 2019

April 9, 2014 Fall River submitted a Statement of Interest to the MSBA.

SOI #2

2014 MSBA conducts site walkthrough of existing BMC Durfee site.

MSBA “Senior Study” Site te Re Review

November 18, 2015 MSBA Board of Directors voted to issue an invitation to enter into the Feasibility Study Phase

Fall River INVITED Into Feasibi bility ty Study dy

July 27, 2017 Project Review Meeting with the MSBA Facilities Assessment Subcommittee

MSBA A FAS Meeting

Summer 2018 - 2019 Construction of new building and renovation
  • f existing athletic
building

Const stru ruction

  • n Phase
2019 - 2022 MSBA Board Vote to Approve PS&B Agreement February 2018

November 21, 2017

slide-3
SLIDE 3

H I G H S C H O O L

BMC

DURFEE Site Selection Evaluation

Industrial Park Site Duro Mills Site BMC Durfee High School Anawan Mills Site 10 Lewiston Street (Fall River DPW)

  • Site T
  • o Small

ll

  • Environ
  • nme

mental al Contam amin inat ation ion

  • Addition
  • nal

al Cost to Purchas ase

  • Zoning Restric

rictions

  • ns
  • Abutting Propertie

ies

(not enough buildable area) (NOT conducive to a school environment)

63.86 Acres 16 Acres 5.6 Acres 6.1 Acres 22 Acres

slide-4
SLIDE 4

OPTION 2A OPTION 2B

H I G H S C H O O L

BMC

DURFEE Summary of Options Studied – Existing Durfee Site

OPTION 1A OPTION 1B OPTION 1C OPTION 1E

NEW CONSTRUCTION

OPTION 1D

RENOVATION & NEW CONSTRUCTION

slide-5
SLIDE 5

Schematic Design Phase

H I G H S C H O O L

BMC

DURFEE

OPTION 1E

Since the Last School Committee presentation…..

  • Building

ding Prog

  • gramm

rammin ing g Meetin ings gs with h User Grou

  • ups

ps

  • Administr

ministratio ion/Se /Secu curit ity

  • Guida

idance nce

  • Nurse
  • Special

cial Educat catio ion

  • Athle

thletics tics / Phys ysical ical Educat catio ion

  • Fine

e Arts ts / Performin ming Arts ts

  • Music

ic

  • Constr

truction ction Craf aft

  • Culin

linary y Arts ts / Trad adewind ewinds

  • Visual

l Design Commu munica icatio ions

  • Cosmeto

metolo logy

  • FRED

D TV

  • Science

ence (gener neral l educa catio tion, n, obser ervat vator

  • ry,

, plan aneta etariu rium) m)

  • Healt

lth Assis isting ting

  • Envir

vironment mental al Scienc ence

  • Engin

ineerin eering Tech chnolo logy

  • Ear

arly ly Educa catio tion & Car are

  • Marketi

keting

  • Librar

ary y Media ia Specialist cialist

  • Genera

eral l classrooms ms

  • Student

ent/St /Staff aff Colla llaborat atio ion spaces ces

  • ROTC
  • Custo

todia ial l / Main intena enance ce

75

Meetings

Over

slide-6
SLIDE 6

Schematic Design Phase

H I G H S C H O O L

BMC

DURFEE

OPTION 1E

Since the Last School Committee Presentation…..

  • Mechanical

ical / Electrical rical / Plumbing / FP Coordin inat ation ion Meetings with Dist strict rict & City Person

  • nnel
  • Technolog
  • gy

y & Security ity Coordin inati ation

  • n Meetings

s with Distric rict & City Person

  • nnel
  • Fall

l River r Fire and Police ce Coordin inati ation

  • n Meetings
  • Utility

ity Coordin inati ation

  • n meeting with Fall

l River r Water r / Sewer Depar artme ment

  • Communit

ity Forums

  • Food Service Meetings with Whitson’s
  • Bells Committ

ittee ee Meetings

  • Observator

atory / Histor

  • ric

ic Telescop cope Meeting

  • Sub

Sub-surfa face e Investig igat ation ion Coordin inat ation ion Meetings

  • Fall

l River r Offic ice of Economi

  • mic

c Developm lopmen ent Presentatio ation

  • Peoples

s Incorpor

  • rat

ated ed Meeting relat ated ed to Early rly Education ion & Care e spaces 75

Meetings

Over

slide-7
SLIDE 7

H I G H S C H O O L

DURFEE

BMC

SITE PLAN

North Arrow

Secondary Entry Lobby 3-story Atrium Elsbree Street Driscoll Arena Spencer Borden Elementary School Performing Arts / Music Student Dining / Culinary
slide-8
SLIDE 8

H I G H S C H O O L

BMC

DURFEE

CONCEPTUAL 3D RENDERING

ELSBREE STREET LOOKING SOUTH TOWARD MAIN ENTRANCE

  • New core academic building along Elsbree Street with a
pedestrian friendly entry plaza.
  • Identifiable, inviting, secure entrance.

  • Central Organizing Atrium – Celebrating the History of Fall
River and BMC Durfee High School
  • Use of low maintenance, durable materials (Brick, Stone,
Fiberglass)
  • Architectural cues from Old Durfee on Rock Street
  • Classical design elements – symmetrical organization,
bell tower, observatory tower (historic telescope), arched windows, hipped roof, etc.
  • Building on plinth
  • Re-use and integration of historic bells, clock faces,
granite benches, pavers, and restored clavier.
slide-9
SLIDE 9

H I G H S C H O O L

BMC

DURFEE

CONCEPTUAL 3D RENDERING

ELSBREE STREET LOOKING NORTH TOWARD MAIN ENTRANCE

slide-10
SLIDE 10

H I G H S C H O O L

BMC

DURFEE

MILL BLDG. PRECEDENTS

SCHEMATIC INTERIOR PERSPECTIVES Examples…. Flint Cotton Mill Borden Mills American Printworks Sanford Spinning Company

slide-11
SLIDE 11

H I G H S C H O O L

BMC

DURFEE

ATRIUM

SCHEMATIC INTERIOR PERSPECTIVES

slide-12
SLIDE 12

H I G H S C H O O L

BMC

DURFEE

ATRIUM

SCHEMATIC INTERIOR PERSPECTIVES

slide-13
SLIDE 13

H I G H S C H O O L

BMC

DURFEE

ATRIUM

SCHEMATIC INTERIOR PERSPECTIVES

slide-14
SLIDE 14

H I G H S C H O O L

BMC

DURFEE

SECONDARY LOBBY

SCHEMATIC INTERIOR PERSPECTIVES

slide-15
SLIDE 15

H I G H S C H O O L

BMC

DURFEE

2,570 students 501,330

Gross Square Footage

BMC BMC Durfee Hi Durfee High Sc gh School hool Total Project Cost

$260Million

Approximately Propos posed ed

City Portion

$94-99Million

Approximately