DSG CSS Consequential Change 22 nd January 2019 Agenda Actions from previous meeting Gemini Topics for finalisation: Meter Readings at Transfer Management of Market Participant Data Management of MAP Id against


slide-1
SLIDE 1

DSG CSS Consequential Change

22nd January 2019

slide-2
SLIDE 2

Agenda

  • Actions from previous meeting
  • Gemini
  • Topics for finalisation:

– Meter Readings at Transfer – Management of Market Participant Data – Management of MAP Id against Supply Meter Point – High level design options

  • New Topics for discussion:

– SPA Updates – RGMA – Meter Sector Code – Meter Point Creation – Meter Point Status

  • Data Cleansing Update
  • Customer road map
slide-3
SLIDE 3

CSS Consequential – Gemini

High Level System Solution Impact Assessment

slide-4
SLIDE 4

D-2 D D-1

Switch is secured with status CO @00:00:00 on D-2

Switch Goes Live with status LI @00:00:00

MDS & AAQ File is generated and sent to Gemini UKLINK Batch runs at 10 / 11 AM

File Upload program is run & entries stored in DB

MDS / AAQ values 06:00 -> ACT_Number Job –

10 mins To generate unique id for new meter id combination received in MDS

11:00 -> Demand

Estimation & UIG suite of job run Generate the nominations for ‘D’ day Cyclic Job runs every 2/3 hours to reflect actual positions based on shipper nomination for DM sites

D+1

Confirmed Nomination position

  • Allocation

Run – NDM/UIG

  • CON File

Processing (run till close out)

Maintenance Window – 3 AM to 5 AM

Existing Process

Switch can be requested anytime between D-5 and D - 30

Gas Nomination ID received from UK Link Commence Gas Nomination submission for D View initial gas allocation position & UIG portion Finalise Gas nomination position Finalise gas purchases Revised gas allocation & UIG portion

Xoserve

Customers

slide-5
SLIDE 5

D D-1

Switch is secured @17:00:00

  • n D-1

Switch Goes Live @00:00:00 20:00* -> ACT_Number Job – 10

mins To generate unique id for new meter id combination received in MDS

20:15* -> Demand & UIG suit of job

run – 45 to 50 min Generate the nominations for ‘D’ day Will Reflect actual positions based on shipper nomination for DM

D+1

Confirmed Nomination position

  • Allocation

Run – NDM/UIG

  • CON File

Processing (run till close out)

Maintenance Window – 3 AM to 5 AM

17:30* -> CSS sends the confirmed

position at 17:00 Entries made in trigger table Batch run to generate consolidated MDS/AQQ file

  • Owing to CSS, if the file generation is

moved to D-1, consideration is information will be received by 17:30

  • SAP ISU could take c1.5 hours to

update custom tables and generate MDS/AAQ files

  • Gemini will then need to schedule

ACT_NUMBER job on receipt of MDS/AAQ file

  • Run the Demand Estimation and UIG

suite of jobs

  • Considering concurrency with other

jobs (which has potential to overrun as well), infrastructure capacity needs to be assessed

  • 10% increase in ‘To-Be’ volumes has

been considered for MDS/AAQ process

  • Impacts to external stakeholder

unknown at this stage

POST CSS

Switch can be requested anytime between D-1 and D - 28

Gas Nomination ID received from UK Link from ~20:00 hours Commence Gas Nomination submission for D View initial gas allocation position & UIG portion after 20:15 hours

Customers

Xoserve

Finalise Gas nomination position Finalise gas purchases Revised gas allocation & UIG portion

  • All timings are indicative and

need further analysis

slide-6
SLIDE 6

Change Overview

CSS Consequential – Gemini

Currently Gemini receives all the Portfolio updates on D-2 from SAP ISU on a daily basis via MDS/AAQ files. As part of this change, Gemini will receive the changes for switching data effective on D day on D-1 evening post CSS gate closure. Solution Options

Gemini to receive Portfolio updates on D-2 and D-1 for effective D day Gemini to receive Portfolio updates on D-1 for effective D day 1 2

slide-7
SLIDE 7

Gemini : As-Is Design

Current Functionality : Gemini

  • Gemini receives all the Portfolio updates based on the below triggers on D-2 with effective date as D day from SAP ISU on a daily basis via

MDS/AAQ files -

  • Class Change
  • AQ-Correction
  • SOQ Change Through Contract Change
  • Withdrawal Process
  • Isolation
  • Registration Process
  • Address Change (CMS)
  • Post Code Change Through Internal Screens
  • Site Takeover Process
  • EUC Change
  • SMP AQ Monthly Calculations
  • RATCHET
  • SOLR
  • Reconnection
  • SMP Exit Zone change for IGT site
  • The NTS / LDZ Unique sites are been manually created by Business (received as Worki tem from SAP ISU) via online screen on D-2

(Business days).

  • Activity Number for active DM meter types are created by Shipper via online screen or system generated.
  • Shipper do place DM nominations within a window i.e. D-35 05:00 to D-1 12:00 for gas flow D day via online screen / API / interfaces.
  • Activity Number for NDM / UG meter types are created by the system on D-1 06:00
  • DM Nomination are being estimated on D-1 at 08:00 for active DM meter ids in case they are not present in the system.
  • Shipper can re-nominate for DM meter types within a window D-1 14:00 to D 04:59.
  • NDM / UG Nominations for D and D+1 are been calculated in the system using the AQ values, DM Nominations and Weather values
  • Gemini sends the data to internal & NG systems on scheduled times on a daily basis.
slide-8
SLIDE 8

Option 1 – Gemini to receive Portfolio updates on D-2 and D-1 for effective D day

1 Triggers for Changes on D-2

Class Change AQ- Correction SOQ Change through Contract Change Isolation Address Change Post Code Change through Internal screen Site Takeover Process EUC Change SMP AQ Monthly calculation Ratchet SOLR Reconnection SMP Exit Zone change for IGT site System Generates Activity numbers [DM/ NDM /UG Meters] Shippers can nominate / re-nominate for DM meters on D-2 for any new / existing meter id for the ones triggered as part of D-2 updates. In case of no DM Nomination for any active meter id, the estimation will run on D-1 at 800 hour bar for the NDM / UG nomination process The NDM / UG Nomination run for D day will be triggered on D-1 as in with the data present in the system

Triggers for Changes on D-1

Registration process Withdrawal process System Generates Activity numbers [DM/ NDM /UG Meters] Estimation will run for the missing DM Re-Nomination for the active meter id The NDM / UG Nomination run for D day will be triggered on D-1 as in with the data present in the system

Process on D-2 Process on D-1

slide-9
SLIDE 9

Option 1 - High Level Impact Assessment

Impacted Systems

Assumptions

  • MDS/AAQ files needs to be received and

loaded before D-1 midnight, however a tool will be built to correct the data.

  • No scheduling changes will be made for

NDM & UG Nomination / Allocation / Invoicing suite

  • No changes required in pre / post closeout

processes in Gemini

  • For Gas Year change, MDS/AAQ files will

be loaded on D-2 and any changes can be updated on D-1

  • Last Sync message will be received from

CSS by 6:00 pm

Overall Impact

Medium

Marketflow

SAP PO

SAP ISU

Gemini

SAP BW CMS DES API

Impact

1

Pros Cons

DM Nominations will be applicable for 13 triggers received on D-2 updates within its timelines Technically complex for Gemini to handle 2 files loading D+1 and D updates sequentially on D-1 Incorrect mapping will be present for Future dates i.e. D+1 while D will contain the corrected record which will leads to incorrect NDM/UG Nominations

slide-10
SLIDE 10

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: Gemini SAP ISU Process Code Process Code Code Change / Scheduling Code Change Shippers Gemini Existing Existing System will be amended to load the D-2 and D-1 updates in Gemini followed by creation of activity number and estimation process. Code Changes will be done to send the 13 triggered on D-2 and rest 2 in D-1. A A A A G G G G A A A A A A

1

slide-11
SLIDE 11

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exception External Screens Batch Jobs Performance Test?

Meter Details M N n/a N Y Y Nomination / Re- nomination M N n/a N N Y Gas Trades n/a n/a n/a n/a n/a n/a Measurements n/a n/a n/a n/a n/a N Allocation n/a n/a n/a n/a n/a Y Invoicing n/a n/a n/a n/a n/a Y Interfaces M N n/a n/a Y Y External System M N n/a n/a N Y API n/a n/a n/a n/a n/a N

1

slide-12
SLIDE 12

2 Triggers for Changes on D-1 Class Change AQ- Correction SOQ Change through Contract Change Isolation Address Change Post Code Change through Internal screen Site Takeover Process EUC Change SMP AQ Monthly calculation Ratchet SOLR Reconnection SMP Exit Zone change for IGT site Registration process Withdrawal process System Generates Activity numbers [DM/ NDM /UG Meters] Estimation will run for the missing DM Re-Nomination for the active meter id NDM / UG Nomination run for D day will be triggered on D-1 as in with the data present in the system Process on D-1

Option 2 – Gemini to receive Portfolio updates on D-1 for effective D day

slide-13
SLIDE 13

Option 2 - High Level Impact Assessment

Impacted Systems

Assumptions

  • MDS/AAQ files needs to be received and

loaded before D-1 midnight, however a tool will be built to correct the data.

  • No scheduling changes will be made for

NDM & UG Nomination / Allocation / Invoicing suite

  • No changes required in pre / post closeout

processes in Gemini

  • For Gas Year change, MDS/AAQ files will

be loaded on D-2 and any changes can be updated on D-1

  • Last Sync message will be received from

CSS by 6:00 pm

Marketflow SAP PO

SAP ISU

Gemini

SAP BW CMS DES API

Impact

2

Pros Cons

Technically less complex for Gemini to handle 1 file loading D updates on D-1 Nominations cannot be submitted by the shippers for all DM meter ids received in the file Correct records will be stored in the system across for all the processes UG Nominations will be calculated based on the DM Nomination estimates and AQ present in the system NDM Nominations will be calculated based on the AQ values present at that time in the system

Overall Impact

Medium

slide-14
SLIDE 14

Option 2 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Gemini SAP ISU Process Code Process Code Code Change / Scheduling Code Change Shippers Gemini Existing Existing System will be amended to load the D-1 updates in Gemini followed by creation of activity number and estimation process. Code Changes will be done to send the updates to D-1. A A G G G G G G A A A A A A

2

slide-15
SLIDE 15

Option 2 - Process Impact Assessment

Process Area Complexity File Formats Exception External Screens Batch Jobs Performance Test?

Meter Details L N n/a N Y Y Nomination / Re- nomination M N n/a N N Y Gas Trades n/a n/a n/a n/a n/a n/a Measurements n/a n/a n/a n/a n/a n/a Allocation n/a n/a n/a n/a n/a Y Invoicing n/a n/a n/a n/a n/a Y Interfaces L N N N Y Y External System M N n/a n/a N Y API n/a n/a n/a n/a n/a n/a Other (Specify) n/a n/a n/a n/a n/a n/a

2

slide-16
SLIDE 16

Additional Design Considerations

MDS/AAQ files received post midnight on D-1 will fail to load in Gemini. A tool may have to be built to load the data for any rejections or failures to avoid mismatches. DM Re-nomination timelines will be reduced for the D-1 updates for effective date D. The timelines will be applicable post loading of the files till D However, re-nominations can be placed by the shippers considering the lead time (2 hours from the request) and flow rate validation If the Shipper doesn’t make a Re-nomination for the Day irrespective of the Estimated DM Nominations perceived to be an accurate reflection of the usage for the D day, for the purpose only of determining the Scheduling Charges the nominated quantity shall deemed to be zero (as is) Data and process impacts to other systems – MIS, GCS , MIPI, IAP, SAP BW to be assessed Changes to NTS / LDZ Unique sites work items that are manually created on D-2 needs to be discussed

slide-17
SLIDE 17

Topics for finalisation

  • Meter Readings at Transfer
  • Management of Market Participant Data
  • Management of MAP Id against Supply Meter Point
slide-18
SLIDE 18

CSS Impact Assessment – Switching Processes

High Level System Solution Impact Assessment

slide-19
SLIDE 19

CSS Consequential – UK Link

High Level System Solution Impact Assessment

slide-20
SLIDE 20

Contents

  • Overall Assumptions
  • Solution options for CSSC Category 1 requirements (Excluding

Gemini, DES and BW impact)

– Nomination Enquiry – Nomination Process – Shipper Transportation Rates – Settlement Details (aka Shell Record) – Change of Supplier – Change of Shipper Only – Forced / Auto Confirmation – Shipper Withdrawal

slide-21
SLIDE 21

Overall Assumptions

  • For high level design all interactions between CSS Provider and UKLink will be via

Marketflow through IX and EFT

  • All NTS sites are out of scope for CSS and hence, will continue to operate as is

(BAU)

  • Batch schedules need to be revisited as part of detail design to accommodate the

faster switching timelines

  • Shipper File formats impacted by CSS consequential need to be revisited and might

require system changes

  • The proposed solution options may change due to refinement and further changes to

CSSC requirements and considerations during Detail design phase

  • APIs are being considered as part of the solution options
slide-22
SLIDE 22

Nomination Enquiry

slide-23
SLIDE 23

Change Overview

Nomination Enquiry

UK Link will still allow for a proposing shipper to submit a Nomination Enquiry Request (NOM - S47) independent to a CSS switch to enable them to obtain the current values of Supply Meter Point.

Solution Options

Nomination Enquiry will continue As Is Nomination Enquiry via new API service and the existing file Nomination Enquiry via a new API only 1 2 3

slide-24
SLIDE 24

Option 1 - High Level Impact Assessment

  • 1. Nomination Enquiry will continue As Is

Nomination Enquiry will continue As Is via the file received from the Shippers. UK Link will allow the proposing Shipper to submit current S47 segment to obtain the Supply Meter Point details. All the current validations will be applied on S47 segment. Potential changes to file format with respect to withdrawal flag sent in the response (S59 segment) are anticipated.

Impacted Systems

Assumptions

  • All current Nomination Enquiry validations will

continue to be applied

  • Batch processing schedule might change

Overall Impact

No Impacts Marketflow SAP PO SAP ISU Gemini SAP BW CMS DES API

Impact

1

slide-25
SLIDE 25

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact:

1

SAP ISU SAP PO Marketflow SPA File Formats File Formats Code change Configuration Change Configuration Change Shippers Shippers Shippers Existing Existing Existing Code changes will be done related to withdrawal flag File format change with respect to withdrawal flag File format change with respect to withdrawal flag G G G G G G G G G G G G G G G G G G G G G

slide-26
SLIDE 26

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA L Y N N Y N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N RGMA n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1

slide-27
SLIDE 27

Option 2 - High Level Impact Assessment

  • 2. Nomination Enquiry Process via new API service or existing File

Nomination Enquiry process will be received via new API service or existing File. Shippers can send the enquiry file via API or can send the same way as they are doing today. UK Link will allow the proposing Shipper to submit S47 segment to obtain the Supply Meter Point details. All the current validations will be applied on S47 segment. Potential changes to file format with respect to withdrawal flag sent in the response (S64 segment) are anticipated.

Impacted Systems

Assumptions

  • Existing business rules will be applied

around enquiry via new API service.

  • Data elements for the new API service will

mirror the existing file

  • All current Nomination Enquiry validations

will continue existing file interface.

Overall Impact

Medium

Marketflow

SAP PO SAP ISU

Gemini SAP BW CMS DES

API Impact

2

slide-28
SLIDE 28

Option 2 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow API Process Code Configuration & File Formats File Formats Configuration Code Change Configuration Change Configuration Change Configuration Change Shippers Shippers Shippers Shippers New New Existing New New Interface to be built for Nomination Enquiry via API New interface to be built in order to receive the Nomination Enquiry file via API. File format change with respect to withdrawal flag File format change with respect to withdrawal flag New interface to be built in

  • rder to receive the

Nomination Enquiry. A A G A G G G G A A G A A A G A A A G A G G G G A A G A

2

slide-29
SLIDE 29

Option 2 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA M Y N N N N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

2

slide-30
SLIDE 30

Option 3 - High Level Impact Assessment

  • 2. Nomination Enquiry Process via new API service or existing File

Nomination Enquiry process will be received via new API service which will mirror the current enquiry file.

Impacted Systems

Assumptions

  • Existing business rules will be applied

around enquiry via new API service.

  • Data elements for the new API service will

mirror the existing file

Overall Impact

Medium

Marketflow

SAP PO SAP ISU

Gemini SAP BW CMS DES

API Impact

3

slide-31
SLIDE 31

Option 3 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO API Process Code Configuration & File Formats Configuration Code Change Configuration Change Configuration Change Shippers Shippers Shippers New New New New Interface to be built for Nomination Enquiry via API New interface to be built in order to receive the Nomination Enquiry file via API. File format change with respect to withdrawal flag New interface to be built in

  • rder to receive the

Nomination Enquiry. A A A G G G A A A A A A A A A G G G A A A

3

slide-32
SLIDE 32

Option 3 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA M N N N N N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

3

slide-33
SLIDE 33

Nomination Process

slide-34
SLIDE 34

Change Overview

Nomination Process

Currently UK Link requires the proposing (or current registered) shipper to submit a Nomination Request (NOM) to obtain details of the Transportation charges, to support Network referrals and for changes to Class, batch frequency or MRF on the MPRN for the large competitive supply meter points where AQ is greater than 73,200. Post CSS, a version of the Nomination request from a proposing or registered shipper for any large supply meter points will used to support the Network appraisal (referrals) . Switching can still take place through CSS without a nomination being submitted.

Solution Options

Nomination Process 1

slide-35
SLIDE 35

Option 1 - High Level Impact Assessment

  • 1. Nomination Process

UK Link will still need to allow for a proposing (or current registered) shipper to submit a Nomination Request (NOM) independent

  • f a switch request to enable the transporter to assess the impact on the changes where necessary.

Potential changes to File format with respect to withdrawal flag sent in the Nomination offer (S64 segment) are anticipated.

Impacted Systems

Assumptions

  • No Impacts to Nomination cancellation process
  • UK Link will send the relevant notifications to

the DMSPs(GCC file) that is currently issued at Nomination.

  • A Shipper can still send multiple Nomination

request.

  • All Nomination validations will continue to be

As Is.

  • Batch processing schedule might change

Overall Impact

Low Marketflow

SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

1

slide-36
SLIDE 36

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA File Formats File Formats Code change Configuration Change Configuration Change Shippers Shippers Shippers Existing Existing Existing Code changes will be done related to withdrawal flag File format change with respect to withdrawal flag File format change with respect to withdrawal flag G G G G G G G G G G G G G G G G G G G G G

1

slide-37
SLIDE 37

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA L Y N N Y N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N RGMA n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1

slide-38
SLIDE 38

Shipper Transportation Rates

slide-39
SLIDE 39

Change Overview

Shipper Transportation Charges

Shipper users will be able to access transportation charges, this will be an extract of existing transportation rates. If shipper needs any specific rate with respect to change of Class, MRF, batch frequency and any referrals, the Shipper must correct process in order to obtain an offer. Shippers will query transportation rate via a new API Service. Validation rules will be build within UK Link to restrict the invalid requests. This services will only provide data for transportation rates for Large supply meter points

Solution Options

Transportation rate extract to shippers via new API Service (Supporting multiple MPRNs) 1

slide-40
SLIDE 40

Option 1 - High Level Impact Assessment

1- Transportation rate extract to shippers via new API Service (Supporting multiple MPRNs)

Shipper API service will be designed to provide facility to extract current transportation rate values. This service will enable Shippers to query data from UK Link for multiple MPRNs.

Impacted Systems

Assumptions

  • Any shipper can request for transportation rate

data for LSP sites even if the site is outside of their portfolio

  • Existing business rules will be applied around

querying transportation rate data through API service route(Nomination Request Equivalent )

  • Any changes to existing MRF, Batch, Class,

Capacity will still be received via Nomination request

  • Real time transportation rates will be provided

without validity period and are subjected to change based on existing business rules

Marketflow

SAP PO SAP ISU

Gemini SAP BW CMS DES

API Impact

1

Overall Impact

Medium

slide-41
SLIDE 41

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO API Process Code Configuration Configuration Code Change Configuration code Configuration Code Shippers Shippers Shippers New Service for Shippers New Service for Shippers New Service for Shippers Code development to fetch real time transportation rate data System to make the configuration to pass Data to Shipper API System to make the configuration for API to send data to Shippers A A A G G G A A A G G G A A A G G G A A A

1

slide-42
SLIDE 42

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA M N N N N Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1

slide-43
SLIDE 43

Settlement Details (AKA Shell Record)

slide-44
SLIDE 44

Change Overview

Settlement details (AKA shell record)

Shippers will continue to provide and maintain the settlement details that are required in UK Link for the Supplier/Shipper's registration period. Details provided by a shipper as part of the current confirmation process that are not provided to UK Link via the CSS Registration Synchronization message, can be provided by the shipper to ensure the relevant settlement details are applied from the shipper's confirmation effective date. This will include items such Class, Meter Read Frequency, SOQ/SHQ, Contact details etc. Where a shipper have provided any settlement details, they will be linked to the CSS switch and applied on the effective date of the switch. Incase of no details provided, default values will be applied based on the rules defined.

Solution Options

New Batch interface and response for Settlement details (AKA Shell record) 1

slide-45
SLIDE 45

Option 1 - High Level Impact Assessment

1- New Batch interface for Settlement details (AKA Shell record)

As part of the solution, two new file based interfaces will be built Interface 1: to receive the settlement details from shippers via Marketflow and Interface 2: to send the responses back to shippers via Marketflow. In case of multiple settlement details being sent the latest valid data will be applied when the secured sync message is received from CSS. In case of no settlement details received from shipper when the secured sync is received, default settlement details will be applied based on the rules defined. Settlement details will be validated on receipt and re-validated when switch is secured; response will be sent to shipper only if validation fails (Rejection). Matching / linking will be based on MPRN, Shipper and Supplier, and if provided the CSS Registration Identifier. Impacted Systems

Assumptions

  • If settlement details has transporter Nomination

reference, offer data will take precedence in calculation of transportation rates.

  • If no settlement details are received by UK Link

from shipper, offer details will not be applied.

  • Proposal for 3:00 PM cut off to receive settlement

details.

  • Rules for the application of settlement details will

be defined for all the possible switching scenarios and site types.

  • Settlement details may be received after switch

Validation (VL), hence the notification will have rates calculated based on default values which are subjected to change till the status is changed to Secured (SC).

  • Latest Valid settlement details received will be

applied when switch is secured.

  • File Formats and Validity Period of Settlement

details will be received before DD Phase.

Overall Impact

Medium

Marketflow SAP PO SAP ISU

Gemini SAP BW CMS DES API

Impact

1

slide-46
SLIDE 46

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration code Configuration Code Shippers Shippers Shippers 2 New Interfaces for Shippers 2 New Interfaces for Shippers 2 New Interfaces for Shippers 2 new interfaces will be built Interface 1 - To receive the settlement details(AKA shell record) Interface 2 - To send the response to shippers System will be configured to cater the 2 new interfaces between ISU and marketflow System will be configured to cater the 2 new interfaces between ISU and marketflow A A A A G A A A A G G G A A A G G G A A A

1

slide-47
SLIDE 47

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA M Y N N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N RGMA n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1

slide-48
SLIDE 48

Change of Supplier (with or without change of Shipper)

slide-49
SLIDE 49

Solution Options

i

Change Overview

Supplier Switching

Currently any changes to the supplier are received via GEA or Reconfirmation process by shippers to UKLink. Post CSS implementation, the supplier switching process will be mastered by CSS. This will include below requests from CSS: ➢ Change of Supplier with same shipper ➢ Change of Supplier with different shipper UK Link will receive notifications from the CSS as part of ‘Registration Sync’ message to advise of the current status of Supplier switches once they have been successfully ‘Validated’, ‘Confirmed’ and ‘Secured’. However, on receipt of Registration sync from the CSS, UKLink is expected to perform high level validations (e.g. MPRN, Org ID etc.) and notify response to CSS in case of failures/warnings as new interface. UK Link will record the incoming Shipper and Supplier details and is expected to notify. ➢ Gaining shipper following the receipt of validated (VL) sync message (Current world equivalent of CFR) ➢ Gaining and Losing shippers(Ceased Responsibility) following receipt of Secured (SC) sync (Current world equivalent TRF, MRI & PAC)

2a 1a 1b 2b Minimum changes to existing CFR File New interface for Gaining shipper notification Minimum changes to existing TRF, MRI & PAC Files New Interface to combine existing files and remove redundant information Registration Sync for VL Status Registration Sync for SC Status

slide-50
SLIDE 50

Option 1 - High Level Impact Assessment

  • 1. Registration Sync for VL Status - Minimum changes to existing CFR File

New Registration Sync interface will be build to notify any switching triggers from CSS system to ISU via Marketflow. Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages. Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS If Validation is successful, switch will be created with VL status in ISU and gaining shipper will be notified in CFR file Minimum changes to existing CFR file format to include the settlement data details if received or default values that will be applied.

Impacted Systems

Assumptions

  • CNF will no longer be used to receive a switch

request except for NTS sites. If received it will be rejected

  • Supplier sync without shipper change will be

treated as reconfirmation process

  • If no settlement details received, CFR will be

sent with data based on agreed default values

  • Registration sync will be validated at ISU, if

failed, rejection will be notified to CSS (VL) and gaining shipper will not be notified

  • Losing shipper will not be notified on validated

sync

Overall Impact

High Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

1a

slide-51
SLIDE 51

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 1- Existing for Shippers 2- New for CSS provider 1- Existing for Shippers 2- New for CSS provider 1- Existing for Shippers 2- New for CSS provider 1. New Interface to receive Supplier Switch 2. New Interface to reject the invalid Sync 3. CFR to gaining shipper with minimum File format changes

  • 1. System to be configured to cater to 2

new interface 2.Change to existing interface between ISU and marketflow

  • 1. System to be configured to

cater to 2 new interface 2.change to existing interface between ISU and marketflow A A A A A A A A A A A A A A A A A A A A A

1a

slide-52
SLIDE 52

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1a

slide-53
SLIDE 53

Option 2 - High Level Impact Assessment

  • 2. Registration Sync for VL Status - New interface for Gaining shipper notification

New Registration Sync interface will be build to notify any switching triggers from CSS system to ISU via Marketflow Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS If Validation is successful, switch will be created with VL status in ISU and gaining shipper will be notified in new file format which will include settlement details if received or default values that will be applied.

Impacted Systems

Assumptions

  • CNF will no longer be used to receive a switch

request except for NTS sites. If received will be rejected

  • Supplier sync without shipper change will be

treated as reconfirmation process

  • If no settlement details received, new interface

will be sent based on agreed default values

  • Registration sync will be validated at ISU, if

failed, rejection will be notified to CSS (VL)

  • Losing shipper will not be notified on validated

sync

  • Objection/Annulment window will be managed

by CSS

Overall Impact

High Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

2a

slide-54
SLIDE 54

Option 2 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 3 New Interfaces (2- CSS Provider, 1-Shipper) 3 New Interfaces (2- CSS Provider, 1-Shipper) 3 New Interfaces (2- CSS Provider, 1-Shipper) 1. New Interface to receive Supplier Switch sync 2. New Interface to reject the invalid Sync 3. New interface to gaining shipper on Validated sync

  • 1. System to be configured to cater to 3

new interface between ISU and Marketflow

  • 1. System to be configured to

cater to 3 new interface between ISU and Marketflow A A A A A A A A A A A A A A A A A A A A A

2a

slide-55
SLIDE 55

Option 2 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

2a

slide-56
SLIDE 56

Option 1 - High Level Impact Assessment

  • 1. Registration Sync for SC Status - Minimum changes to existing TRF, MRI & PAC Files

Registration Sync interface will be built to notify any switching triggers from CSS system to ISU via Marketflow Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS Irrespective of warning notification, switch will be updated to Secured status in ISU and gaining shipper will be notified with minimum changes in existing files (TRF/MRI/PAC) to accommodate settlement details and losing shipper will be notified in TRF file with ceased responsibility

Impacted Systems

Assumptions

  • Last sync message from CSS will be received by

18:00 hrs

  • Registration sync will be validated in ISU, if

failed, warning will be issued to CSS (SC) with rejection but switch will go live

  • UK Link will receive the sync messages in

sequence and will process in batches

  • Batch schedule need to be reviewed
  • Transportation rates derived based on defaults

will be sent if settlement data is not received by shipper or rejected on re-validation at the time of secured

Overall Impact

High Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

1b

slide-57
SLIDE 57

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 2 - Existing to Shippers 2 - New for CSS Provider 2 - Existing to Shippers 2 - New for CSS Provider 2 - Existing to Shippers 2 - New for CSS Provider 1. New Interface to receive Supplier Switch sync 2. New Interface to send warning for the invalid Sync 3. TRF/MRI to gaining shipper with minimum File format changes 4. TRF to Losing Shipper (AS IS) 1. System to be configured to cater to 2 new interface 2. Change to existing interface between ISU and marketflow 3. TRF to losing shipper (AS IS)

  • 1. System to be configured

to cater to 1 new interface 2.Change to existing interface between ISU and marketflow

  • 3. TRF to losing shipper

(AS IS) A A A A A A A A A A A A A A A A A A A A A

1b

slide-58
SLIDE 58

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1b

slide-59
SLIDE 59

Option 2 - High Level Impact Assessment

  • 2. Registration Sync for SC Status - New Interface to combine existing files and remove redundant information

Registration Sync interface will be built to notify any switching triggers from CSS system to ISU via Marketflow. Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages. Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS Irrespective of warning notification, switch document will be updated to Secured status in ISU and New File format will be developed to combine the notifications sent to gaining shipper for TRF/MRI/PAC files along with details for settlement details and losing shipper will be notified in TRF file with ceased responsibility

Impacted Systems

Assumptions

  • Last sync message from CSS will be received

no later than 18:00 hrs

  • Registration sync will be validated at ISU, if

failed, warning will be issued to CSS (SC) with rejection but switch will go live

  • UKLink will receive the sync messages in

sequence and processes these in batches

  • Batch schedule need to be reviewed

Transportation rates will be derived based on default values if settlement details are not received by shipper or rejected on re-validation at the time of secured

Overall Impact

High Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

2b

slide-60
SLIDE 60

Option 2 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 1 Existing to Shippers 1 New FF for shippers 2 New for CSS Provider 1 Existing to Shippers 1 New FF for shippers 2 New for CSS Provider 1 Existing to Shippers 1 New FF for shippers 2 New for CSS Provider 1. New Interface to receive Supplier Switch secured sync 2. New Interface to send warning for the invalid Sync 3. New File format to club the proposing shipper notification. 4. TRF to Losing Shipper (AS IS) 1. System to be configured to cater to 2 new interfaces between CSS and ISU 2. New File format to club the proposing shipper notification 3. TRF to losing shipper (AS IS) 1.

  • 1. System to be configured

to cater to 2 new interfaces between CSS and ISU 2. New File format to club the proposing shipper notification 3. TRF to losing shipper (AS IS) A A A A A A A A A A A A A A A A A A A A A

2b

slide-61
SLIDE 61

Option 2 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

2b

slide-62
SLIDE 62

Change of Shipper Only

slide-63
SLIDE 63

Change Overview

Change of Shipper Only

Currently, shipper submits the shipper transfer request via Confirmation process to UKLink whereas post CSS implementation, CSS will initiate Change of Shipper Event Sync to UKLink with no change in supplier details and below changes will be considered: ➢ Where the energy supplier makes a change to the Shipper associated to their registration via the CSS process, then a synchronization message will be received via ‘Registration Sync’ by UK Link to update this data ➢ This is an update/event for CSS and hence, validated, confirmed and secured sync messages will not be received from CSS ➢ On receipt of Registration sync from the CSS, UKLink is expected to perform high level validations (e.g.. MPRN, Org ID etc.) and notify response to CSS in case of failures/warnings as new interface ➢ UKLink will treat this as a existing shipper transfer process and expected to notify gaining shipper on receipt and after the gate closure whereas losing shipper will be notified of ceased responsibility. ➢ CSS can cancel a futuristic change of shipper request with a synchronization message to UK Link to notifying it of the cancellation.

Solution Options:

ile

2a 1a 1b 2b Minimum changes to existing CFR File New interface for Gaining shipper notification Minimum changes to existing TRF, MRI & PAC Files New Interface to combine existing files and remove redundant information Notifications on Receipt of Change of Shipper Event Sync Notifications post Gate Closure on D-1

slide-64
SLIDE 64

Option 1 - High Level Impact Assessment

  • 1. Notifications on Receipt of Change of Shipper Event Sync - Minimum changes to existing CFR File

New Registration Sync interface will be build to notify any switching triggers from CSS system to ISU via Marketflow Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS If Validation is successful, switch will be created for effective date and gaining shipper will be notified in CFR file with minimum changes to existing file format to include the settlement details if received or defaults that will be applied.

Impacted Systems

Assumptions

  • CNF will no longer be used to receive a switch

request except for NTS sites. If received will be rejected

  • Offer will not be mandatory for LSP sites
  • GEA file will not be used for Supplier changes
  • If no settlement data received, CFR will be sent

with transportation rates derived based on default values

  • Registration sync will be validated at ISU, if

failed, rejection will be notified to CSS

  • Losing shipper will not be notified on receipt of

change of shipper only sync

  • Change of Shipper cancellation sync will be

received before gate closure

Overall Impact

High Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

1a

slide-65
SLIDE 65

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 1-Existing for Shippers 2- New for CSS provider 1-Existing for Shippers 2- New for CSS provider 1-Existing for Shippers 2- New for CSS provider 1. New Interface to receive change of shipper sync 2. New Interface to reject the invalid Sync 3. CFR to gaining shipper with minimum File format changes

  • 1. System to be configured to cater to 2

new interface 2.Change to existing interface between ISU and marketflow

  • 1. System to be configured to

cater to 2 new interface 2.change to existing interface between ISU and marketflow A A A A A A A A A A A A A A A A A A A A A

1a

slide-66
SLIDE 66

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1a

slide-67
SLIDE 67

Option 2 - High Level Impact Assessment

  • 2. Notifications on Receipt of Change of Shipper Event Sync - New interface for Gaining shipper notification

New Registration Sync interface will be build to notify any switching triggers from CSS system to ISU via Marketflow Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS If Validation is successful, switch will be created with effective date in ISU and gaining shipper will be notified in new file format inline to the CSS switching requirements which will include settlement details if received or default details that will be applied.

Impacted Systems

Assumptions

  • CNF will no longer be used to receive a switch

request except for NTS sites. If received will be rejected

  • Offer will not be mandatory for LSP sites
  • If no settlement data received, CFR will be sent

with transportation rates derived based on default values

  • Registration sync will be validated at ISU, if

failed, rejection will be notified to CSS

  • Losing shipper will not be notified on receipt of

change of shipper sync

  • Change of Shipper cancellation sync will be

received before gate closure

Overall Impact

High Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

2a

slide-68
SLIDE 68

Option 2 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 3 New Interfaces (2- CSS Provider 1-Shipper) 3 New Interfaces (2- CSS Provider 1-Shipper) 3 New Interfaces (2- CSS Provider 1-Shipper) 1. New Interface to receive Change

  • f shipper event

2. New Interface to reject the invalid Sync 3. New interface to gaining shipper

  • n receipt (CFR equivalent)
  • 1. System to be configured to cater to 3

new interface between ISU and Marketflow

  • 1. System to be configured to

cater to 3 new interface between ISU and Marketflow A A A A A A A A A A A A A A A A A A A A A

2a

slide-69
SLIDE 69

Option 2 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

2a

slide-70
SLIDE 70

Option 1 - High Level Impact Assessment

  • 2. Notifications post Gate Closure on D-1 - Minimum changes to existing TRF, MRI & PAC Files

On D-1 post gate closure, gaining shipper will be notified with minimum changes in existing files (TRF/MRI) to accommodate settlement details and losing shipper will be notified in TRF file with ceased responsibility CSS will not send any Change of Shipper sync messages post receipt of request, except for shipper cancellation sync Change of shipper will go effective from the date provided on Change of Shipper Event Sync There is a risk to process multiple files at around same time with redundant information to shippers

Impacted Systems

Assumptions

  • DMSPs will be notified for DM switch via GCC

inline to existing business rules

  • UKLink will not receive any sync messages on

Gate closure

  • Batch schedule will be changed to manage the

smooth file flows post gate closure

  • Settlement details are not mandatory
  • Transportation rates derived based on default

values will be sent if settlement details are not received by shipper or rejected on re-validation at the time of gate closure

  • No change anticipated for Losing shipper

notification

Overall Impact

Medium Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

1b

slide-71
SLIDE 71

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers Shippers Shippers 2 - Existing to Shippers 2 - Existing to Shippers 2 - Existing to Shippers 1. TRF/ MRI to gaining shipper with minimum File format changes 2. TRF to Losing Shipper (AS IS) 1. Change to existing interface between ISU and marketflow 2. TRF to losing shipper (AS IS) 1. 1Change to existing interface between ISU and marketflow 2. TRF to losing shipper (AS IS) A A A A G G G G G A A A A A A A A A A A A

1b

slide-72
SLIDE 72

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA M Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1b

slide-73
SLIDE 73

Option 2 - High Level Impact Assessment

2, Notifications post Gate Closure on D-1 - New Interface to combine existing files and remove redundant information

On D-1 post gate closure, gaining shipper will be notified with New File format which will be developed to combine TRF/MRI files along with any details for settlement data. Losing shippers will be notified in TRF file with ceased responsibility. CSS will not send any Change of Shipper sync messages post receipt of request, except for shipper cancellation sync. Change of shipper will go effective from the date provided on Change of Shipper Event Sync.

Impacted Systems

Assumptions

  • DMSPs will be notified for DM switch via GCC

inline to existing business rules

  • UKLink will not receive any sync messages on

Gate closure

  • Batch schedule will be changed to manage the

smooth file flows post gate closure

  • Settlement details are not mandatory
  • Transportation rates derived based on default

values will be sent if settlement details are not received by shipper or rejected on re-validation at the time of gate closure

  • No change anticipated for Losing shipper

notification

Overall Impact

High Marketflow SAP PO

SAP ISU

Gemini SAP BW CMS DES API

Impact

2b

slide-74
SLIDE 74

Option 2 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 1 Existing to Shippers 1 New FF for shippers 1 Existing to Shippers 1 New FF for shippers 1 Existing to Shippers 1 New FF for shippers 1. New File format to combine the proposing shipper notification 2. TRF to Losing Shipper (AS IS) 1. New File format to combine the proposing shipper notification 2. TRF to Losing Shipper (AS IS) 1. New File format to combine the proposing shipper notification 2. TRF to Losing Shipper (AS IS) A A A A A A A A A A A A A A A A A A A A A

2b

slide-75
SLIDE 75

Option 2 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

2b

slide-76
SLIDE 76

Forced / Auto Confirmation

slide-77
SLIDE 77

Change Overview

Forced / Auto Confirmations

Currently Forced/Auto confirmations are handled within UK Link system. However post CSS implementation, this process will be mastered by CSS. Where a forced / auto confirmation is triggered in UK Link (based on current business rules), UK Link will notify CSS via a new

  • interface. On receipt of this interface at CSS, registration request will be raised within CSS and sent to UK Link via registration

sync message. The request will be subject to the standard initial registration validation checks by the CSS

Solution Options

Forced / auto confirmation update sync to CSS and response from CSS 1

slide-78
SLIDE 78

Option 1 - High Level Impact Assessment

  • 1. Forced / auto confirmation update sync to CSS and response from CSS

Any forced/Auto confirmation updates will be notified from UK Link to CSS via new interface and CSS will then initiate Registration Sync request to UKLINK. This will be a cyclic update from UK Link to CSS

Impacted Systems

Assumptions

  • Forced Confirmation will be handled by CSS

for any sites in scope based on existing UKLink business process

  • LPG registration will be done via CSS
  • Confirmation effective dates will be inline to

faster switching timelines for domestic and non-domestic sites

  • UKLink will continue sending SWN files for

unregistered iGT sites

  • If rejected, response is expected from CSS on

back of these new interfaces and detailed validations will be defined before detail design phase

  • This is not a real time update to CSS from

UKLink

Marketflow SAP PO SAP ISU

Gemini SAP BW CMS DES API

Impact

1

Overall Impact

Medium

slide-79
SLIDE 79

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration code Configuration Code CSS Provider CSS Provider CSS Provider New interfaces for CSS New interfaces for CSS New interfaces for CSS 2 New Interfaces Functionality within SAP ISU will be build to send Auto confirmation updates to CSS and Rejection response from CSS to ISU 2 New Interfaces System to make the configuration for 2 new interfaces from ISU to CSS and 1 Inbound from CSS to ISU 2 New Interfaces System to make the configuration for 2 new interfaces from ISU to CSS and 1 Inbound from CSS to ISU A A A A A A A A A G G G A A A G G G G G G

1

slide-80
SLIDE 80

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA M Y Y N Y N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1

slide-81
SLIDE 81

Shipper Withdrawals

slide-82
SLIDE 82

Change Overview

Shipper Withdrawals

Currently Shipper Withdrawal is received from Shipper via WAO file. However post CSS consequential, WAO files will be decommissioned except for NTS sites. This process will be mastered by CSS.

Solution Options

RMP status update sync to CSS and response from CSS 1

slide-83
SLIDE 83

Option 1 - High Level Impact Assessment

  • 1. RMP status update sync to CSS and response from CSS

On change of any RMP Status (to Dormant or Terminated), UK Link will notify CSS via new interface ‘SupplyMeterPointSync’. The energy supplier can then initiate the deactivation of their regsitration via the CSS process, this will trigger the registration sync message to update the status of the current supplier (and shipper) registration to "Inactive“.

Impacted Systems

Assumptions

  • WAO files will no longer be used to trigger

Voluntary Withdrawal except for NTS sites

  • WOR will not be triggered as part of CSS

inactive registration sync

  • Losing shipper will be notified for ceased

responsibility

  • CSS RMP statuses will be derived at run time

based on the mapping structure defined within UKLink

  • If Rejected, response is expected from CSS
  • n back of these new interfaces and detailed

validations will be defined before detail design phase

Marketflow SAP PO SAP ISU

Gemini SAP BW CMS DES API

Impact

1

Overall Impact

Medium

slide-84
SLIDE 84

Option 1 - System Impact Assessment

System Component: Development Type: Impacted User(s): Build Type: Change Description: Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration code Configuration Code CSS Provider CSS Provider CSS Provider New Interfaces for CSS New Interfaces for CSS New Interfaces for CSS 2 New Interfaces - Functionality within SAP ISU will be build to send change of meter point status and its response from CSS to ISU system 2 New Interfaces System to make the configuration for 2 new interfaces from ISU to CSS and 1 Inbound from CSS to ISU 2 New Interfaces System to make the configuration for 2 new interfaces from ISU to CSS and 1 Inbound from CSS to ISU A A A A A A A A A G G G A A A G G G G G G

1

slide-85
SLIDE 85

Option 1 - Process Impact Assessment

Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test?

SPA M Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing – Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

1

slide-86
SLIDE 86

Appendix

slide-87
SLIDE 87

Considerations for Complexity

High Medium Low

Scale of change

  • 1. Complex changes and coding requirements

involving majorly new objects

  • 1. Medium complex changes and coding

requirements involving mix of new and existing objects

  • 1. Simple changes and coding requirements

for existing objects

  • 2. Major impact to existing functionality
  • 2. Medium impact to existing

functionality

  • 2. Minor impact to existing functionality
  • 3. Major requirements for performance fine

tuning

  • 3. Performance fine tuning required
  • 3. Minor requirements for performance fine

tuning

  • 4. More than 5 systems are impacted
  • 4. 3-5 systems impacted
  • 4. Less than 3 systems impacted
  • 5. More than 10 development objects involved
  • 5. 5-10 development objects involved
  • 5. Less than 5 development objects involved

Testing involved

  • 1. Multiple processes impacted leading to high

number of testing scenarios (cross stream/downstream impacts)

  • 1. Few (upto 3) business processes are

impacted leading to considerable no. of scenarios needs to tested

  • 1. Limited processes impacted leading to

less testing

  • 2. High Regression impact
  • 2. Considerate Regression impact
  • 2. Regression impact is less
  • 3. Exhaustive Market trail are required
  • 3. Market trail may be required
  • 3. Market trail are not required
  • 4. Testing spans across multiple systems
  • 4. Testing spans across few systems
  • 4. Testing spans across few systems
slide-88
SLIDE 88

New Topics For Discussion

slide-89
SLIDE 89

SPA Updates

  • Shipper’s will continue to provide the relevant SPA updates into UK

Link as per the current obligations, with the exception of the Market Sector Code which will be maintained via CSS

  • The key change will be around the validation that is provided in

when updates are provided by an incoming shipper – Current rules that utilise a Confirmation Status of RQ or CO will need to be updated to align to the new CSS switch statuses:

  • RQ = Validated or Confirmed
  • CO = Secured
slide-90
SLIDE 90

RGMA

  • No changes are required to the current asset file structures and

updates are expected to be received in the same way as today.

  • The key change will be around the validation that is provided in

when updates are provided by an incoming shipper – Current rules that utilise a Confirmation Status of RQ or CO will need to be updated to align to the new CSS switch statuses:

  • RQ = Validated or Confirmed
  • CO = Secured
slide-91
SLIDE 91

Meter Sector Code

  • This has been covered as part of the settlement discussions
  • Updates will be managed by CSS with updates being provided to

UK Link

  • Shippers will be notified by CSS as part of the CSS registration

process, and UK Link will provide a notification to the current Shipper where this changes outside of a registration

slide-92
SLIDE 92

Meter Point Creation

  • The meter point creation process will remain as-is for all site types.
  • UK Link will trigger a new synchronisation message to CSS (for

sites types in scope of CSS switching – e.g. all sites except NTS sites) to enable supplier registration of the meter point.

slide-93
SLIDE 93

Meter Point Status

  • No changes will be made to the current meter point status values

maintained in UK Link

  • UK Link will transform the current values to align to the required

RMP status values as part of the CSS synchronisation message

slide-94
SLIDE 94

RMP Status Mapping

Meter Point Status (status

  • f the service pipe)

Isolation status (the ability of the meter to pass gas) Withdrawal status Confirmation status RMP status (as held by CSS) LI N (or blank) N LI Operational LI Y N LI Dormant LI N (or blank) Y LI Operational LI Y Y SU Dormant CA or CL N (or blank) N LI Operational CA or CL Y N LI Dormant CA or CL N (or blank) Y SU Operational CA or CL Y Y SU Dormant DE N (or blank) N LI Terminated DE Y N LI Terminated DE N (or blank) Y SU Terminated DE Y Y SU Terminated EX Y N LI Terminated EX Y Y SU Terminated EX Nil value Y SU Terminated