drc
play

(DRC) REDD Process An initiative funded by UN-REDD Progress in the - PowerPoint PPT Presentation

Economic Biodiversity Development Conservation Protected areas The Democratic Republic of the Congo p g livelihoods Forest values Forest values Poverty reduction (DRC) REDD Process An initiative funded by UN-REDD Progress in the


  1. Economic Biodiversity Development Conservation Protected areas The Democratic Republic of the Congo p g livelihoods Forest values Forest values Poverty reduction (DRC) REDD Process An initiative funded by UN-REDD Progress in the preparation of the R-PP IWG - IFR New York, 04 September 2009

  2.  DRC’s land size: 245.000.000 ha  Forest size: 135.000.000 ha (85.000.000 ha of humid forest: 50% of Africa’s)  Carbon stock estimation: 20 to 37 billions tons Carbon stock estimation: 20 to 37 billions tons  Great potential and numerous opportunities for REDD pilot activities General General  DRC is one the 9 pilot countries chosen Background by UN REDD and FCPF to implement a national REDD strategy national REDD strategy  Numerous partners support the initiative, including: development agencies, NGOs, civil society and COMIFAC CO C

  3.  Launched in: January 2009  Composed of 23 professionals from 9 international organisations, including: FAO, UNDP, UNEP, World Bank, Government of Norway, WHRC, Rainforest Foundation, ONFI  The objective of the mission: to help put in REDD p place an R-PP for REDD (Readiness Plan Proposal) ( p ) Mission in Mi i i in DRC DRC  The team works closely, in a participatory manner with all stakeholders  The R-PP is funded by: UN REDD (4,3 millions USD) and the FCPF (World Bank:3,6 millions USD)

  4.  At the political level  to put in place the legal framework, including: the to put in place the legal framework including: the National REDD Committee, the Interministerial REDD Committee and the National REDD Coordination; ;  to revise forestry laws and regulations to include REDD;  to develop capacity building; R-PP R PP  to put in place a coordinated system of Activities communication among stakeholders;  to put in place a system for sharing the benefits of the forestry sector. h f  At the technical level  to put in place a scenario for reference level; to put in place a scenario for reference level;  to put in place a MRV system (Monitoring, Reporting, Verification);  to put in place a scientific body for REDD  to put in place a scientific body for REDD.

  5.  Component 1: Development and Coordination (to design a coordination and C di ti communication mechanism between partners and promote national interests)  REDD management system and evaluation  UNFCCC negotiations support Provisional  Total budget : USD 610,000 Workplan Workplan (July 2009-  Component 2: Capacity building (building March 2010) capacity at different levels)  Communication et consultation plan  Communication et consultation plan  Information dissemination  Capacity building funding needs  Total budget : USD 185,000

  6.  Component 3 : Technical studies Component 3 : Technical studies  Current states of forest governance and policy, and diagnosis of the causes of deforestation and degradation degradation  REDD strategy design Provisional  Reference scenario design Workplan Workplan  MRV system design MRV t d i (July 2009-  Terms of reference for the design of the REDD March 2010) implementation framework  Total budget : USD 885,000

  7. A National REDD Coordination has been put in  place by the Government to steer the REDD process as well as the implementation of UN- ll th i l t ti f UN REDD and FCPF programs.  Including a National REDD Coordinator and an International Technical Assistant International Technical Assistant Vacancies:   Permanent Technical Coordinator UN-REDD National REDD REDD  Education Information and Communication Ed ti I f ti d C i ti Coordination Specialist  Financial and Administrative Manager  Accountant  Accountant Civil Society has set up a REDD Working  Group, aiming to be:  A key counterpart for the National Coordination;  A key counterpart for the National Coordination;  An entity which oversees and controls all consultation and public participation aspects;  A platform for analysis dialogue and communication  A platform for analysis, dialogue and communication on REDD.

  8.  Harmonize two initiatives with their own specif logics: specif logics:  FCPF: detailed plan formally agreed upon by all stakeholders before implementation;  UN REDD: quick start without a prior approved  UN-REDD: quick start without a prior approved plan. National  Coordinate an initiative including 4 REDD REDD agencies with different management ff Coordination styles: Challenges  World Bank  UNDP  UNEP  FAO  FAO

  9. UN-REDD FCPF Annexe 1 - Land use, Forest Policy and Adoption of the decree creating the Governance Quick Assessment (the completed institutional framework (Natonal study) y) Comitee, interministerial comitee and Nat. coord. Annex 2a - National REDD Working Group (framework ToR or Plan) Development of the consultation Annex 2b - REDD Consultation and Outreach and outreach plan (IEC) Plan (full Plan required Set up of the National REDD Set ‐ up of the National REDD 2c ) - REDD Management and Evaluation Coordination System (framework ToR or Plan) Annex 3a - Assess Candidate Activities for the REDD strategy (framework ToR or Plan) Study on the drivers and agents of deforestation and degtradation Need for Need for (FAO) Annex 3b - Evaluate potential Additional Benefits (framework ToR or Plan) Harmonisation! State of affairs of succesfull forest conservation experiences and land Annex 3c - Trade-Offs Analysis (framework use planning . (PNUE) ToR or Plan) Annex 3d - Risk Assessment of Your REDD Economic, environnemental and social Strategy (framework ToR or Plan) assessment of potential REDD activities including risks (e.g.conflicts)(PNUE) Annex 4 - REDD Implementation Framework (framework ToR or Plan) Study on benefits sharing from natural ressources exploitation (PNUE) Annex 5 - Assess Social and Environmental Capacity building plan (PNUD) p y g p ( ) impacts (framework ToR or Plan) p ( ) Assessement of investment needs for Annex 6 - Assess Investment and Capacity REDD Building Requirements (framework ToR or Plan) Exploratory study on the reference scenario Annex 7 - Develop a Reference Scenario (FAO) (framework ToR or Plan) TORs Development of a forest carbon TORs .Development of a forest carbon quantification protocol and operational framework Annex 8 - Design Monitoring, Reporting for field measurements (FAO) and Verification System (framework ToR or Plan) TORs MRV system

  10.  Quick assessment of land uses, policy État d’avancement R-PP and forestry governance: y g  An ongoing survey of the causes and factors of deforestation and degradation.  Survey carried out by the Ministry of Environment Survey carried out by the Ministry of Environment (Department of Forest Inventory and Planning - DIAF) and the Catholic University of Louvain with the logistical and financial support of FAO the logistical and financial support of FAO. State of progress R-PP: Exploring DD causes

  11.  National Working Group on REDD  The draft Decree is being approved. g pp  Consultation and Communication Plan on REDD  The plan design will start in September and end in Th l d i ill t t i S t b d d i November 2009. State of  Several Workshops accross the country: Kinshasa progress progress 19-20 and 21 -22 August, Kisangani, Bukavu, t Ki i B k 19 20 d 21 22 A R-PP: Lumbumbashi, Mbandaka, and Matadi in Consultation September (with the support of UNDP) and Communication

  12.  Strategy and implementation framework design  Terms of Reference are being approved;  Difficult partnership with UNEP given unshared Difficult partnership with UNEP, given unshared vision with the agency. State of  DRC requests a partner to support the country in the progress long political process to develop its national REDD g p p p R-PP: REDD R PP: REDD program; Strategy  UNEP considers its role to be a business partner, instead of being an adviser delivering technical support. t

  13.  Elaborating and designing a reference scenario and a MRV system  Several partners are currently working on the design and Several partners are currently working on the design and the management of a Geographic Information Systems in DRC:  Department of Forest Inventory and Planning (DIAF);  Central African Forest Observatory based in Kinshasa (OFAC-FORAF); State of  Central African Satellite Forest Observatory hosted by p progress g the University of Kinshasa and funded by USAID- R-PP: MRV CARPE; and  DRC Forest Atlas is being designed (WRI). Reference  On site carbon measurement: O it b t Scenario  Relevant work done by WCS et WWF (National Parks Salonga and Ituri)  Talks underway about a partnership with the  Talks underway about a partnership with the University of Kinsangani.  The challenge is to build upon the work done so far, in order to bring all partners in the process of designing a g p p g g national development plan!!!!!!!!

  14. Critical Point Insufficient funding for setting up the ToRs for the implementation of MRV ToRs for the implementation of MRV C iti Critical Point l P i t in DRC.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend