dra draft ft
play

DRA DRAFT FT UC C SA SANT NTA CR CRUZ LONG RANGE DEVELOPMENT - PowerPoint PPT Presentation

DRA DRAFT FT UC C SA SANT NTA CR CRUZ LONG RANGE DEVELOPMENT PLAN Notice ice o of P f Prepar aratio ion n Sco coping ng S Sessio ions ns Mar arch 1 12, 2 , 2020 I 12-2pm m Mar arch 1 12, 2 , 2020 I 6-8pm pm


  1. DRA DRAFT FT UC C SA SANT NTA CR CRUZ LONG RANGE DEVELOPMENT PLAN Notice ice o of P f Prepar aratio ion n Sco coping ng S Sessio ions ns Mar arch 1 12, 2 , 2020 I 12-2pm m Mar arch 1 12, 2 , 2020 I 6-8pm pm December 2019 | 1 2040 LONG 2040 NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  2. DRA DRAFT FT Pub ublic Scop c Scoping Sessi Session on P Pur urpose pose Provide information on the UC Santa Cruz Long Range • Development Plan (LRDP) Provide an overview of the California Environmental Quality Act • (CEQA) process and scoping Receive comments from members of the public, organizations, • and interested public agencies on the issues the Environmental Impact Report (EIR) should address December 2019 | 2 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 LONG 2040 NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  3. DRA DRAFT FT Over verall Sche Schedule e an and N d Nex ext t Steps Steps December 2019 | 3 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 2040 LONG NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  4. DRA DRAFT FT Sit Sites in es in thi this LR s LRDP Residen denti tial C Campus • ~2 ~2,0 ,000 ac acres Reside sidential Cam ial Campus us • Adja djacent to t to the the w west si st side de of of S Santa Cruz uz, sub substa stantially sur surroun unde ded b d by open s n spac ace and and par ark ar areas. We West stsi side R Rese search P Park • ~1 ~18.5 ac acres • Includ udes f s former Texas I s Instr strum uments s build ildin ing, cu current ntly u used fo for research • Loc ocated on d on the the W Westsi stside near the the Coas astal al S Scie cience nce C Campus Wests stside ide Rese sear arch P ch Par ark December 2019 | 4 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 2040 LONG NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  5. DRA DRAFT FT Planning Co Pl g Cons nside idera rati tions Stude St dent nt Su Success Acad ademic E Evolution and and Matu Maturity • Support ort a a divers erse st studen ent b bod ody, y, including first • Suppo upport co college s struct uctur ure and relationship to academics time college students and regional underserved communities • Support re resea searc rch growt growth • Address b ress basi sic n nee eeds s such as affordable • Improve quality and availability of te teac aching and and housing and food security resea re searc rch sp space • Provide appropriate hou ousi sing t g typ ypes to support • Ri Right ht-size f facul culty, s staff ff, a and s suppo upport s spa pace ces throughout campus the student experience • Create an environment of equity ty and and i inc nclusion Sustainabili Su bility a and R d Resili ilience • Mode del s l sustainabi bili lity a and r d resili ilience le leade dership ip within Ph Physi ysical Ca Campus Fu s Functionality the region through teaching and operations • Enhance circulation infrastructure to improv rove • Develop d disa sast ster re resi silience st stra rategies s for fire, accessibili bility to / from all parts earthquake, and other hazards of campus • Meet or exceed st state a and U UC C syst system goa goals s for energy, water, and carbon • Encourage eff ffic icient use se of of l land and buildings • Minimize i e incr crea ease i se in water er use on campus • Steward ec ecol olog ogical, t teaching, a and c cultura ral a asset ssets December 2019 | 5 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 2040 LONG NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  6. DRA DRAFT FT Propose oposed Lan Land U Use se Str Strateg ategies Strat ategy # y #5 Strategy #1 St #1 Designated reserve areas for ecological, Compact academic core cultural, and educational resources Strat ategy # y #6 Strat ategy # y #2 Additional employee housing located with Adjacent ring of student housing access to community resources Strat ategy # y #3 Strat ategy # y #7 Improved, more efficient roadway Enhanced historic district with improved network with peripheral parking. community interface Strategy #4 St #4 Strat ategy # y #8 Enhanced shuttle, pedestrian, and Westside Research Park with mixed bicycle network to and throughout academic, research, and housing uses campus December 2019 | 6 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 2040 LONG NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  7. DRA DRAFT FT Reside sidential Cam ial Campus us Draft aft Lan Land U d Use se Map Map Wests stside ide R Rese sear arch P ch Par ark at 2300 De 2300 Delawa ware re • Prop opose sed S d Stud tudent P Pop opul ulati tion: 28,000 Aca cade demic Academic & Support • Prop opose sed Em d Employee Pop opul ulation: 5 5,000 Outdoor Research Historic District Hous Housin ing Student Housing Employee Housing Mixed Use Ope pen S Spa pace Natural Space Campus Natural Reserve Recreation and Athletics Othe ther Facilities & Support Wests stside ide R Rese sear arch P ch Par ark at at 2300 Delaw lawar are December 2019 | 7 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 2040 LONG NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  8. DRA DRAFT FT CEQ CEQA Overview Overview ia Enviro ironmental al Qua The C e Califor lifornia uality A y Act t (C (CEQ EQA) ) re requi quires res p public a agencies to to: Evaluate a project’s potential physical effect on the environment • Environment equals physical conditions (air, water, biology, climate change, noise, historic buildings, etc.) • Provide an opportunity for public involvement and disclosure • Prepare an Environmental Impact Report (EIR), if project has potential to result in a significant impact • A significant impact is a substantial and adverse change in the physical environment • UC Sant nta C a Cruz ruz wi will pre repare re a an EI EIR R for the r the LRD RDP December 2019 | 8 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 LONG 2040 NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  9. DRA DRAFT FT Environment Environmental I l Impact mpact Report Report An inform ormational d onal document nt • Discloses information about a project’s environmental effects • Identifies mitigation measures to reduce significant effects, where feasible • Evaluates feasible alternatives to the proposed project and their environmental effects Program ram-leve vel EIR EIR • Appropriate when a “CEQA project” consists of a plan with planning criteria • Can be used to tier the environmental review of subsequent campus development projects Legal r requ equirem emen ent • Adequacy of EIR must be certified by UC prior to considering whether LRDP should be approved December 2019 | 9 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 2040 LONG NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

  10. DRA DRAFT FT The he EI EIR P Process ocess PUBLIC C MEET EETINGS PUBLIC H C HEARIN ING (SANT ANTA C A CRUZ) UC R Reg egent nts Adjust s scope ba e based ed o on Issua uance of of Notic Notice of of Pub ublic lic Revie iew/ / Consid iderat ation ion NOP OP co comme mments a and Com Comments on on Draft EI EIR Prepar arat ation ion ( (NOP) of E EIR f for Certific ificat ation ion Prep epare D re Draft EIR and Proj oject A Appr pprov oval Prep epare R re Responses es to Pub ublic lic Revie iew/C /Com omments Issua uance of of Commen ents a s and d on Scope on ope of of EI EIR Draft aft EIR Final E al EIR SCOPIN ING SESSI SIONS NS (SANT ANTA C A CRUZ) December 2019 | 10 10 ENVIR IRONMENTAL IM IMPACT CT RE REPORT T I I NOTIC TICE OF PRE REPARATION TION I I SCO COPIN PING S SESSIO IONS I I MARCH RCH 12, 12, 2020 2020 2040 2040 LONG NG RANG NGE D DEVELOPMENT P T PLAN N COMMUNITY AND CAMPUS MEETINGS

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend