Brunei Shell Petroleum Company RESTRICTED
DR OPS M MAINT NT E NA NANC NCE INT NT E GR IT Y Angus - - PowerPoint PPT Presentation
DR OPS M MAINT NT E NA NANC NCE INT NT E GR IT Y Angus - - PowerPoint PPT Presentation
DR OPS M MAINT NT E NA NANC NCE INT NT E GR IT Y Angus Munro HSSE Team Lead (Well Engineering & CW I) Brunei Shell Petroleum Company RESTRICTED Brunei Shell P etroleum Company RESTRICTED May 2013 2 MAINT E E N NANCE E
Brunei Shell P etroleum Company RESTRICTED 2 May 2013
Brunei Shell P etroleum Company
MAINT E N E NANCE E R E Q E QUIR E D E D T T O PR E V E VE N E NT D DR OPPE D E D OBJE C E CT S
3 DI = design integrity OI = operating integrity MI = maintenance integrity
58% 11% 22% 3% 6%
Droppe pped O d Obj bjects - Categories ( (2009 2009 - 2013) 2013)
Equipment Failure Equipment Operations Lifting & Hoisting Hand Tools Slip, Trip or Fall
42% 27% 15% 12% 4% Droppe pped O d Obj bjects - E quipment F Failure ( (2009 2009 - 2013) 2013)
TDS Pipe Racker Dolly Track Finger Board Elevator
Droppe pped d Obj bject I Incide dents – most freq equen ent H HPI i inciden ent in Wel ell E E ngineer eering past 5 y yea ears 2013 B BSP D Droppe pped O d Obj bjects Incide dents – 16 incidents, 13 in derrick (TDS bolts = 6, Dolly = 3) Drop
- pped O
Object t preventi tion
- n is top
top p person
- nal safety
ty p prior
- rity
ty f for
- r 2
2014 R equired A Actions fo for 2014 2014 – to S to Stop top th the Drop
- ps
1. 1. E mbed D Drop
- ps R
R ed Z Zon
- ne & No G
- Go
- Zon
- ne Pol
- licy – active Red Zone management “Red Zone Wardens”
2. 2. Chal allenge ge Y Y
- ur M